Skip to main content
Top

2017 | OriginalPaper | Chapter

2. Platform Integration and Stationing

Authors : Gengshen Liu, Huajun Li

Published in: Offshore Platform Integration and Floatover Technology

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

There are many kinds of platforms designed to be suitable for the specific working environment. For each platform design, there is a best corresponding platform integration method to make the operation safe and cost effective. Discussions in this chapter present various kinds of platforms and the corresponding integration method options. Through discussions with examples, the history of platform concept development and the corresponding platform installation technology are presented with information in certain depth. For fixed platform and floaters, the most used platform integration method is still by heavy lifting for both modularized topsides and integrated topsides. However, the design and fabrication of massive and heavy integrated topsides make the floatover method a better choice. The conclusion can be drawn from the installation activities of real projects carried out at different time along the offshore industry history.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Article: Rowan companies marks 50th anniversary of landmark LeTourneau jackup, Drilling Equipment and Technology, Drilling Contractor, 34–36 (2005) Article: Rowan companies marks 50th anniversary of landmark LeTourneau jackup, Drilling Equipment and Technology, Drilling Contractor, 34–36 (2005)
2.
go back to reference Article: TPG 500 jackup adapted for platform installation and removal. Offshore (2003) Article: TPG 500 jackup adapted for platform installation and removal. Offshore (2003)
3.
go back to reference Article: Shah Deniz in full flow following complex platform set-down. Offshore (2007) Article: Shah Deniz in full flow following complex platform set-down. Offshore (2007)
4.
go back to reference Ferris, L.D., et al.: Review of the Jack-ups: Safety in Transit (JSIT) Technical Working Group, HSE BOOKS, ISBN 0 7176 2611 3, © Crown copyright 2003 Ferris, L.D., et al.: Review of the Jack-ups: Safety in Transit (JSIT) Technical Working Group, HSE BOOKS, ISBN 0 7176 2611 3, © Crown copyright 2003
5.
go back to reference Manschot, D., et al: “Design and Installation of a Production Jack-up with Storage”. Proceedings of the International Conference the Jack-up platform: design, construction & operation, Sep, 1999, London Manschot, D., et al: “Design and Installation of a Production Jack-up with Storage”. Proceedings of the International Conference the Jack-up platform: design, construction & operation, Sep, 1999, London
6.
go back to reference Stewart, W.P.: Mat-Supported Jack-Up Foundation On Soft Clay—Overturning Storm Stability, The Jack-Up Platform—September 11th and 12th 2007, London Stewart, W.P.: Mat-Supported Jack-Up Foundation On Soft Clay—Overturning Storm Stability, The Jack-Up Platform—September 11th and 12th 2007, London
8.
go back to reference Poulos, H.G.: Marine Geotechnics. Unwin Hyman, London (1988) Poulos, H.G.: Marine Geotechnics. Unwin Hyman, London (1988)
9.
go back to reference Slangen, F. et al.: An Innovative Self Installing Platform (SIP) Concept, OMAE2011-50342, June, 2011, Rotterdam, The Netherlands Slangen, F. et al.: An Innovative Self Installing Platform (SIP) Concept, OMAE2011-50342, June, 2011, Rotterdam, The Netherlands
10.
go back to reference Article: F3-FA Field: A First Gas EPIC. Offshore Ind 4(2), 8–12 (2011) Article: F3-FA Field: A First Gas EPIC. Offshore Ind 4(2), 8–12 (2011)
11.
go back to reference Article: F3-FA platform is a unique construction. Offshore Holland 01, 5–9 (2011) Article: F3-FA platform is a unique construction. Offshore Holland 01, 5–9 (2011)
12.
go back to reference Pedro, J., et al.: Self-Installing Offshore Platform Investigation of Feasible Structural Design Improvements. University of Lisbon, Lisboa (2014) Pedro, J., et al.: Self-Installing Offshore Platform Investigation of Feasible Structural Design Improvements. University of Lisbon, Lisboa (2014)
13.
go back to reference Halkyard, J., et al.: A Deep Draft Semisubmersible with a Retractable Heave Plate, OTC 14304, Houston (2002) Halkyard, J., et al.: A Deep Draft Semisubmersible with a Retractable Heave Plate, OTC 14304, Houston (2002)
14.
go back to reference Roberts, B., et al.: A Novel Platform for Drilling in Harsh High-Latitude Environments, AADE-07-NTCE-73, American Association of Drilling Engineers (2007) Roberts, B., et al.: A Novel Platform for Drilling in Harsh High-Latitude Environments, AADE-07-NTCE-73, American Association of Drilling Engineers (2007)
15.
go back to reference Xu, Q., et al.: An Introduction to Extendable Draft Platform (EDP), ISOPE, Toulon, France (2004) Xu, Q., et al.: An Introduction to Extendable Draft Platform (EDP), ISOPE, Toulon, France (2004)
16.
go back to reference Gerwick, Ben C., Jr.: Construction of Marine and Offshore Structures, 3rd ed, CRC Press, Taylor & Francis Group, LLC, USA, UK (2007) Gerwick, Ben C., Jr.: Construction of Marine and Offshore Structures, 3rd ed, CRC Press, Taylor & Francis Group, LLC, USA, UK (2007)
17.
go back to reference Article: The Statfjord area. Oil and Gas Fields In Norway: Industrial Heritage Plan 176–184 Article: The Statfjord area. Oil and Gas Fields In Norway: Industrial Heritage Plan 176–184
18.
go back to reference Article: Shell’s history in Louisiana: 1996–Mars Project, Shell United State Article: Shell’s history in Louisiana: 1996–Mars Project, Shell United State
19.
go back to reference Article: Installation date draws near for Mars TLP. Oil Gas J. (1996) Article: Installation date draws near for Mars TLP. Oil Gas J. (1996)
20.
go back to reference Article: Hibernia—a timeline, Offshore Technology, Canada Article: Hibernia—a timeline, Offshore Technology, Canada
21.
go back to reference Report: Hebron Project Comprehensive Study Report, September (2011) Report: Hebron Project Comprehensive Study Report, September (2011)
22.
go back to reference Bradshaw, H., et al.: Hutton TLP Installation, OTC-4913-MS, Houston (1985) Bradshaw, H., et al.: Hutton TLP Installation, OTC-4913-MS, Houston (1985)
23.
go back to reference Article: Record 10,000 Tonnes Lift by ALE Heavy Lift in Co-operation with Dubai Drydocks, Heavy Lift Specialist Article: Record 10,000 Tonnes Lift by ALE Heavy Lift in Co-operation with Dubai Drydocks, Heavy Lift Specialist
24.
go back to reference Article: Brazil’s Petrobras Completes Deck Mating on P-55 Platform, Business Guide. Offshore Energy Today (2012) Article: Brazil’s Petrobras Completes Deck Mating on P-55 Platform, Business Guide. Offshore Energy Today (2012)
25.
go back to reference News: Mating Ceremony for the “Frigstad Deepwater Rig Alfa” Drilli. The Maritime Executive News: Mating Ceremony for the “Frigstad Deepwater Rig Alfa” Drilli. The Maritime Executive
26.
go back to reference Article: Advances in heavy-lift systems propel deepwater projects. Offshore (2016) Article: Advances in heavy-lift systems propel deepwater projects. Offshore (2016)
27.
go back to reference Van den Boom, H.J.J., et al.: Computer analysis of heavy lift operations, OTC 5819, Houston (1988) Van den Boom, H.J.J., et al.: Computer analysis of heavy lift operations, OTC 5819, Houston (1988)
28.
go back to reference Clarke, C., et al.: Structural platform solution for seismic arctic environments–Sakhalin II offshore facilities, OTC -17378-PP, Houston (2005) Clarke, C., et al.: Structural platform solution for seismic arctic environments–Sakhalin II offshore facilities, OTC -17378-PP, Houston (2005)
29.
go back to reference News: Transport and Installation of Piltun-Astokhskoye-B Platform, Posh Terasea, 5 July 2007 News: Transport and Installation of Piltun-Astokhskoye-B Platform, Posh Terasea, 5 July 2007
31.
go back to reference Report: Offshore Construction and Decommissioning Vessel, Master Marine AS Report: Offshore Construction and Decommissioning Vessel, Master Marine AS
Metadata
Title
Platform Integration and Stationing
Authors
Gengshen Liu
Huajun Li
Copyright Year
2017
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-3617-0_2