27-07-2019 | Energy Markets (R Sioshansi and A Mousavian, Section Editors)

Procuring Flexibility in Wholesale Electricity Markets

Published in: Current Sustainable/Renewable Energy Reports | Issue 3/2019

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Purpose of Review

Wholesale electricity market operators will require additional flexibility in the future as grid-scale intermittent resource penetration increases and as loads become less certain due to behind-the-meter investments, such as distributed energy resources. Given the market design changes required to address this need, this paper presents an overview of market-based mechanisms that wholesale electricity market operators (regional transmission organizations (“RTOs”) and independent system operators (“ISOs”) in the US have adopted or considered adopting to increase operational flexibility.

Summary

The paper discusses the two ISOs/RTOs that have introduced flexible ramping products and notes that others have considered procuring additional reserves as a means to increase flexibility. The paper also discusses the extent to which a capacity-like payment can be used to procure flexibity.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference U.S. Energy Information Administration. Short-Term Energy Outlook, 201. U.S. Energy Information Administration. Short-Term Energy Outlook, 201.
3.
go back to reference A hybrid resource, which includes both an intermittent resource and an electric storage resource such as a battery, can provide electricity when the renewable fuel is not available, but that generation comes from the storage resource, not the intermittent resource. As discussed later below, hybrid resources are a key tool to manage the integration of intermittent resources. A hybrid resource, which includes both an intermittent resource and an electric storage resource such as a battery, can provide electricity when the renewable fuel is not available, but that generation comes from the storage resource, not the intermittent resource. As discussed later below, hybrid resources are a key tool to manage the integration of intermittent resources.
5.
go back to reference Note that in most cases, ISO/RTO dispatch signals are provided electronically. Note that in most cases, ISO/RTO dispatch signals are provided electronically.
6.
go back to reference • New York Independent System Operator. Integrating public policy: a wholesale market assessment of the impact of 50% renewable generation, 2017, at 8. This paper explains some of the operational issues NYISO projects operators will encounter as the penetration of renewable generation increases over time. • New York Independent System Operator. Integrating public policy: a wholesale market assessment of the impact of 50% renewable generation, 2017, at 8. This paper explains some of the operational issues NYISO projects operators will encounter as the penetration of renewable generation increases over time.
7.
go back to reference New York Independent System Operator. Market design concepts to prepare, for significant renewable generation, ancillary services shortage pricing market design concept proposal, 2018. New York Independent System Operator. Market design concepts to prepare, for significant renewable generation, ancillary services shortage pricing market design concept proposal, 2018.
8.
go back to reference See Enhanced Price Formation in Reserve Markets of PJM Interconnection, L.L.C., Docket No. ER19-1486-000 (filed Mar. 29, 2019) and Enhanced Price Formation in Reserve Markets of PJM Interconnection, L.L.C., Docket No. EL19-58-000 (filed Mar. 29, 2019). See Enhanced Price Formation in Reserve Markets of PJM Interconnection, L.L.C., Docket No. ER19-1486-000 (filed Mar. 29, 2019) and Enhanced Price Formation in Reserve Markets of PJM Interconnection, L.L.C., Docket No. EL19-58-000 (filed Mar. 29, 2019).
9.
go back to reference Midcontinent Independent System Operator, Inc. order conditionally accepting tariff revisions, 149 FERC 61,095, 2014 Midcontinent Independent System Operator, Inc. order conditionally accepting tariff revisions, 149 FERC 61,095, 2014
11.
go back to reference • California ISO, Department of Market Monitoring. Flexible ramping product uncertainty calculation and implementation issues, 2018, at 3. This paper from the CAISO internal market monitor explains in detail how the CAISO Flexible Ramping Product works, including how CAISO derives the demand curves for flexible capacity, which is based on an empirical distribution of recent forecast errors. • California ISO, Department of Market Monitoring. Flexible ramping product uncertainty calculation and implementation issues, 2018, at 3. This paper from the CAISO internal market monitor explains in detail how the CAISO Flexible Ramping Product works, including how CAISO derives the demand curves for flexible capacity, which is based on an empirical distribution of recent forecast errors.
12.
go back to reference California ISO. Day ahead market enhancements: updates to revised straw proposal, 2018. California ISO. Day ahead market enhancements: updates to revised straw proposal, 2018.
13.
go back to reference • California ISO, Department of Market Monitoring. Flexible ramping product uncertainty calculation and implementation issues, 2018, at 3–5, and 38. This paper from the CAISO internal market monitor explains in detail how the CAISO flexible ramping product works, including how CAISO derives the demand curves for flexible capacity, which is based on an empirical distribution of recent forecast errors. • California ISO, Department of Market Monitoring. Flexible ramping product uncertainty calculation and implementation issues, 2018, at 3–5, and 38. This paper from the CAISO internal market monitor explains in detail how the CAISO flexible ramping product works, including how CAISO derives the demand curves for flexible capacity, which is based on an empirical distribution of recent forecast errors.
14.
go back to reference Potomac Economics. MISO independent market monitor quarterly report: winter 2019, 2019, at 32. Potomac Economics. MISO independent market monitor quarterly report: winter 2019, 2019, at 32.
15.
go back to reference Source: CAISO OASIS. In April 2019, the flex-down price was non-zero in 0.4% of the fifteen-minute market intervals in the EIM area and in 0.3% of intervals in the Arizona public service area. The average EIM area flex-up and flex down prices in the fifteen-minute market in April 2019 were $1.52/MWh and $0.14/MWh, respectively. Other areas of the EIM had non-zero flex-up and flex-down prices in fewer than 0.1% of the fifteen-minute market intervals in 2019. Source: CAISO OASIS. In April 2019, the flex-down price was non-zero in 0.4% of the fifteen-minute market intervals in the EIM area and in 0.3% of intervals in the Arizona public service area. The average EIM area flex-up and flex down prices in the fifteen-minute market in April 2019 were $1.52/MWh and $0.14/MWh, respectively. Other areas of the EIM had non-zero flex-up and flex-down prices in fewer than 0.1% of the fifteen-minute market intervals in 2019.
16.
go back to reference California Public Utilities Commission, The 2017 Resource Adequacy Report, 2018, at 5. On a month-ahead basis, jurisdictional load serving entities must demonstrate to the California Public Utility Commission that they have procured their monthly system and flexible resource adequacy obligation. For the months of July through December, those LSEs must demonstrate they have met their local resource adequacy obligation. California Public Utilities Commission, The 2017 Resource Adequacy Report, 2018, at 5. On a month-ahead basis, jurisdictional load serving entities must demonstrate to the California Public Utility Commission that they have procured their monthly system and flexible resource adequacy obligation. For the months of July through December, those LSEs must demonstrate they have met their local resource adequacy obligation.
17.
go back to reference See e.g., California ISO. Flexible Resource Criteria and Mus Offer Obligation – Phase 2, 2018, at 7–10. See e.g., California ISO. Flexible Resource Criteria and Mus Offer Obligation – Phase 2, 2018, at 7–10.
18.
go back to reference • Midcontinent ISO. Resource availability and need evaluation whitepaper, 2018, at 9. This whitepaper written by MISO staff explains some of the operational challenges MISO is experiencing due to, among other things, higher penetrations of intermittent resources. MISO staff proposes several market mechanisms, including a product to ensure that flexible capacity is available in the near-term, to enhance operator flexibility. • Midcontinent ISO. Resource availability and need evaluation whitepaper, 2018, at 9. This whitepaper written by MISO staff explains some of the operational challenges MISO is experiencing due to, among other things, higher penetrations of intermittent resources. MISO staff proposes several market mechanisms, including a product to ensure that flexible capacity is available in the near-term, to enhance operator flexibility.
19.
go back to reference See e.g., Electric Reliability Council of Texas, Nodal Protocol Revision Request Number 863 – Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve. These responses will typically be automatic. See e.g., Electric Reliability Council of Texas, Nodal Protocol Revision Request Number 863 – Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve. These responses will typically be automatic.
20.
go back to reference Most ISOs/RTOs already perform longer-term (e.g., seven days ahead) unit commitments for planning purposes but these commitments are generally for advisory purposes and not financially binding. Most ISOs/RTOs already perform longer-term (e.g., seven days ahead) unit commitments for planning purposes but these commitments are generally for advisory purposes and not financially binding.
Metadata
Title
Procuring Flexibility in Wholesale Electricity Markets
Publication date
27-07-2019
Published in
Current Sustainable/Renewable Energy Reports / Issue 3/2019
Electronic ISSN: 2196-3010
DOI
https://doi.org/10.1007/s40518-019-00133-4