Skip to main content
Top

2017 | OriginalPaper | Chapter

19. Product-Service Systems Under Availability-Based Contracts: Maintenance Optimization and Concurrent System and Contract Design

Authors : Amir Kashani Pour, Navid Goudarzi, Xin Lei, Peter Sandborn

Published in: Advances in Through-life Engineering Services

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Product-service systems (PSSs) are the result of a shifting business focus from designing and selling physical products, to selling a system consisting of products and services in an ongoing relationship with the customer that fulfills customer satisfaction. A PSS contract can take several forms (e.g., fixed price, capability-contract, and availability-based). The focus of this chapter is on PSSs that use availability-based contracts. In these cases the customer does not purchase the product, instead they purchase the utility of the product and the availability of service in order to obtain a lower cost while still meeting their needs. This chapter addresses the optimization of system maintenance activities, and the concurrent design of the PSS and the contract.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Footnotes
1
We assume that ideally the design of the PSS means designing the hardware, software, service, and logistics associated with the system concurrently. Section 19.4 of this chapter includes contract design in this process as well.
 
2
Classically “inventory” refers to an inventory of items (e.g., spare parts), however, more generally, it could mean a maintenance “opportunity inventory”, which is a combination of all the resources necessary to support the system, i.e., workforce, facilities, favorable weather, and spare parts. This broader interpretation of inventory (previously eluded to by [10]) is a departure from mainstream operations research that only thinks of inventory as parts.
 
3
This is not the difference between the predictive and corrective maintenance actions, but rather the cost of just a corrective maintenance event. The predictive maintenance event cost is subtracted later when the real option value is determined, i.e., in Eq. (19.2).
 
4
The value construction in this section assumes that the system is revenue earning, e.g., a wind turbine or an airplane used by an airline.
 
5
For example, if the system is a wind turbine, path uncertainties could be due to variations in the wind over time.
 
6
This could be due to the limited availability of maintenance resources or the limited availability of the system being maintained.
 
7
The decision-maker may also have the flexibility not to implement the predictive maintenance on a particular date but to wait until the next possible date to decide, which makes the problem an American option style as has been demonstrated and solved by [12]. The Haddad et al. solution in [12] is correct for the assumption that an optimal decision will be made on or before some maximum waiting duration and the solution delivered is the maximum “wait to date”. Unfortunately, in reality maintenance decision-makers for critical systems face a somewhat different problem: given that the maintenance opportunity calendar is known when the RUL indication is obtained, on what date should the predictive maintenance be done to get the maximum option value. This makes the problem a European option style.
 
8
In [18] the inventory lead time (ILT) was considered to be a logistics parameter determined from an availability requirement. It is also possible that ILT is a contract parameter that is flowed down to subcontractors.
 
9
Although we include warranty design in the list of possible contract design activities that could be driven by the product parameters, for most products that have warranties, the type of warranty and its length are determined by marketing, and are not based on the product’s predicted reliability. More commonly, the warranty type and length (which are a contract) are passed to the engineering design to determine the appropriate warranty reserve fund, which would be an example of the first category.
 
10
Mechanism design theory is an economic theory that seeks to determine when a particular strategy or contract mechanism will work efficiently.
 
11
This problem is also evidenced by the choice of a single value for the cost of money, i.e., the cost of money is not constant over time (nor the same for all projects within an organization).
 
12
While there are some major manufacturers who appear to (or claim to) use an integrated approach in concurrently designing contract and product parameters, they are unpublished and no details are available.
 
Literature
1.
go back to reference Gansler JS, Lucyshyn W, Vorhis C (2011) Performance-based services acquisition. UMD-CM-11-005, University of Maryland School of Public Policy, February, p 83 Gansler JS, Lucyshyn W, Vorhis C (2011) Performance-based services acquisition. UMD-CM-11-005, University of Maryland School of Public Policy, February, p 83
2.
go back to reference Levitt T (1972) Production-line approach to service. Harv Bus Rev 50(5):41–52 Levitt T (1972) Production-line approach to service. Harv Bus Rev 50(5):41–52
3.
go back to reference Meier H, Roy R, Seliger G (2010) Industrial Product-Service Systems—IPS2. CIRP Ann Manuf Technol 59(2):607–627CrossRef Meier H, Roy R, Seliger G (2010) Industrial Product-Service Systems—IPS2. CIRP Ann Manuf Technol 59(2):607–627CrossRef
4.
go back to reference Sundin E (2009) Life-cycle perspectives of product/service-systems: in design theory. In: Sakao T, Lidnahl M (eds) Introduction to product/service-system design. pp 31–49 Sundin E (2009) Life-cycle perspectives of product/service-systems: in design theory. In: Sakao T, Lidnahl M (eds) Introduction to product/service-system design. pp 31–49
5.
go back to reference Datta PP, Roy R (2010) Cost modelling techniques for availability type service support contracts: a literature review and empirical study. In: Proceedings of 1st CIRP Industrial Product-Service Systems (IPS2) conference. Cranfield University, p 216 Datta PP, Roy R (2010) Cost modelling techniques for availability type service support contracts: a literature review and empirical study. In: Proceedings of 1st CIRP Industrial Product-Service Systems (IPS2) conference. Cranfield University, p 216
6.
go back to reference Arora V, Chan FTS, Tiwari MK (2010) An integrated approach for logistic and vendor managed inventory in supply chain. Expert Syst Appl 37(1):39–44CrossRef Arora V, Chan FTS, Tiwari MK (2010) An integrated approach for logistic and vendor managed inventory in supply chain. Expert Syst Appl 37(1):39–44CrossRef
7.
go back to reference Ferguson J, Sodhi M (2011) Using simulation for setting terms of performance based contracts. In: Hu B, Morasch K, Pickl S, Siegle M (eds) Operations research proceedings 2010. Springer, Berlin, p 465 Ferguson J, Sodhi M (2011) Using simulation for setting terms of performance based contracts. In: Hu B, Morasch K, Pickl S, Siegle M (eds) Operations research proceedings 2010. Springer, Berlin, p 465
8.
go back to reference Bowman RA, Schmee J (2001) Pricing and managing a maintenance contract for a fleet of aircraft engines. Simulation 76(2):69–77CrossRef Bowman RA, Schmee J (2001) Pricing and managing a maintenance contract for a fleet of aircraft engines. Simulation 76(2):69–77CrossRef
9.
go back to reference Kim S, Cohen MA, Netessine S (2007) Performance contracting in after-sales service supply chains. Manag Sci 53(12):1843–1858CrossRefMATH Kim S, Cohen MA, Netessine S (2007) Performance contracting in after-sales service supply chains. Manag Sci 53(12):1843–1858CrossRefMATH
10.
go back to reference Gabriel SA, Sahakij P, Balakrishnan S (2004) Optimal retailer load estimates using stochastic dynamic programming. J Energ Eng 130(1):1–17 Gabriel SA, Sahakij P, Balakrishnan S (2004) Optimal retailer load estimates using stochastic dynamic programming. J Energ Eng 130(1):1–17
11.
go back to reference Murthy DNP, Asgharizadeh E (1999) Optimal decision making in a maintenance service operation. Eur J Oper Res 116(2):259–273CrossRefMATH Murthy DNP, Asgharizadeh E (1999) Optimal decision making in a maintenance service operation. Eur J Oper Res 116(2):259–273CrossRefMATH
12.
go back to reference Haddad G, Sandborn PA, Pecht MG (2014) Using maintenance options to maximize the benefits of prognostics for wind farms. Wind Energy 17(5):775–791CrossRef Haddad G, Sandborn PA, Pecht MG (2014) Using maintenance options to maximize the benefits of prognostics for wind farms. Wind Energy 17(5):775–791CrossRef
13.
go back to reference Lei X, Sandborn PA (2016) PHM-based wind turbine maintenance optimization using real options. Int J Progn Health Manag 7(1) Lei X, Sandborn PA (2016) PHM-based wind turbine maintenance optimization using real options. Int J Progn Health Manag 7(1)
15.
go back to reference Bruck M, Goudarzi N, Sandborn P (2016) A levelized cost of energy (LCOE) model for wind farms that includes power purchase agreement (PPA) energy delivery limits. In: Proceedings of the ASME power conference, Charlotte, NC, USA Bruck M, Goudarzi N, Sandborn P (2016) A levelized cost of energy (LCOE) model for wind farms that includes power purchase agreement (PPA) energy delivery limits. In: Proceedings of the ASME power conference, Charlotte, NC, USA
16.
go back to reference Lei X, Sandborn P, Bakhshi R, Kashani-Pour A, Goudarzi N (2015) PHM based predictive maintenance optimization for offshore wind farms. In: Proceedings IEEE conference on prognostics and health management (PHM), Austin, TX, June 2015 Lei X, Sandborn P, Bakhshi R, Kashani-Pour A, Goudarzi N (2015) PHM based predictive maintenance optimization for offshore wind farms. In: Proceedings IEEE conference on prognostics and health management (PHM), Austin, TX, June 2015
17.
go back to reference Nowicki D, Kumar UD, Steudel HJ, Verma D (2006) Spares provisioning under performance-based logistics contract: profit-centric approach. J Oper Res Soc 59(3):342–352CrossRefMATH Nowicki D, Kumar UD, Steudel HJ, Verma D (2006) Spares provisioning under performance-based logistics contract: profit-centric approach. J Oper Res Soc 59(3):342–352CrossRefMATH
18.
go back to reference Jazouli T, Sandborn P, Kashani-Pour A (2014) A direct method for determining design and support parameters to meet an availability requirement. Int J Perform Eng 10(2):211–225 Jazouli T, Sandborn P, Kashani-Pour A (2014) A direct method for determining design and support parameters to meet an availability requirement. Int J Perform Eng 10(2):211–225
19.
go back to reference Jazouli T, Sandborn P, Kashani-Pour A (2014) A direct method for determining design and support parameters to meet an availability requirement—parameters affecting both downtime and uptime. Int J Perform Eng 10(6):649–652 Jazouli T, Sandborn P, Kashani-Pour A (2014) A direct method for determining design and support parameters to meet an availability requirement—parameters affecting both downtime and uptime. Int J Perform Eng 10(6):649–652
20.
go back to reference Jin T, Wang P (2011) Planning performance based logistics considering reliability and usage uncertainty. Working Paper for Ingram School of Engineering, Texas State University, San Marcos, TX Jin T, Wang P (2011) Planning performance based logistics considering reliability and usage uncertainty. Working Paper for Ingram School of Engineering, Texas State University, San Marcos, TX
21.
go back to reference Sharma DK, Cui Q, Chen L, Lindly JK (2010) Balancing private and public interests in public-private partnership contracts through optimization of equity capital structure. Transp Res Rec: J Transp Res Board 2151(1):60–66CrossRef Sharma DK, Cui Q, Chen L, Lindly JK (2010) Balancing private and public interests in public-private partnership contracts through optimization of equity capital structure. Transp Res Rec: J Transp Res Board 2151(1):60–66CrossRef
22.
go back to reference Hamidi M, Liao H, Szidarovszky F (2014) A game-theoretic model for outsourcing maintenance services. Proceedings—annual reliability and maintainability symposium. doi:10.1109/RAMS.2014.6798514 Hamidi M, Liao H, Szidarovszky F (2014) A game-theoretic model for outsourcing maintenance services. Proceedings—annual reliability and maintainability symposium. doi:10.​1109/​RAMS.​2014.​6798514
23.
go back to reference Deng Q, Zhang L, Cui Q, Jiang X (2014) A simulation-based decision model for designing contract period in building energy performance contracting. Build Environ 71:71–80CrossRef Deng Q, Zhang L, Cui Q, Jiang X (2014) A simulation-based decision model for designing contract period in building energy performance contracting. Build Environ 71:71–80CrossRef
25.
go back to reference Zhu Q, Fung RYK (2012) Design and analysis of optimal incentive contracts between fourth-party and third-party logistics providers. In: Proceedings of the automation and logistics (ICAL). IEEE, pp 84–89. doi:10.1109/ICAL.2012.6308175 Zhu Q, Fung RYK (2012) Design and analysis of optimal incentive contracts between fourth-party and third-party logistics providers. In: Proceedings of the automation and logistics (ICAL). IEEE, pp 84–89. doi:10.​1109/​ICAL.​2012.​6308175
26.
go back to reference Arora V, Chan FTS, Tiwari MK (2010) An integrated approach for logistic and vendor managed inventory in supply chain. Expert Syst Appl 37(1):39–44CrossRef Arora V, Chan FTS, Tiwari MK (2010) An integrated approach for logistic and vendor managed inventory in supply chain. Expert Syst Appl 37(1):39–44CrossRef
27.
28.
go back to reference Zhao H, Yin Y (2011) A dynamic mechanism of risk allocation of construction project from perspective of incomplete contract theory: a theoretical model. Ind Eng Eng Manag 1816–1820 Zhao H, Yin Y (2011) A dynamic mechanism of risk allocation of construction project from perspective of incomplete contract theory: a theoretical model. Ind Eng Eng Manag 1816–1820
29.
go back to reference Rodrigues D, Erkoyuncu J, Starr A, Wilding S, Dibble A, Laity M (2015) Review of the modelling approaches for availability contracts in the military context. Procedia CIRP 30:451–456CrossRef Rodrigues D, Erkoyuncu J, Starr A, Wilding S, Dibble A, Laity M (2015) Review of the modelling approaches for availability contracts in the military context. Procedia CIRP 30:451–456CrossRef
30.
go back to reference Hockley CJ, Smith JC, Lacey LJ (2011) Contracting for availability and capability in the defence environment. In: Ng I, Parry G, Wild P, McFarlane D, Tasker P (eds) Complex engineering service systems: concepts and research. Springer, New York, pp 237–256CrossRef Hockley CJ, Smith JC, Lacey LJ (2011) Contracting for availability and capability in the defence environment. In: Ng I, Parry G, Wild P, McFarlane D, Tasker P (eds) Complex engineering service systems: concepts and research. Springer, New York, pp 237–256CrossRef
31.
go back to reference Kashani Pour AR, Sandborn P, Cui Q (2016) Review of quantitative methods for designing availability-based contracts. J Cost Anal Parametr 9:69–91CrossRef Kashani Pour AR, Sandborn P, Cui Q (2016) Review of quantitative methods for designing availability-based contracts. J Cost Anal Parametr 9:69–91CrossRef
32.
go back to reference Sols A, Nowicki D, Verma D (2008) n-dimensional effectiveness metric-compensating reward scheme in performance-based logistics contracts. Syst Eng 14(3):305–326 Sols A, Nowicki D, Verma D (2008) n-dimensional effectiveness metric-compensating reward scheme in performance-based logistics contracts. Syst Eng 14(3):305–326
33.
go back to reference Erkoyuncu JA, Roy R, Shehab E, Wardle P (2009) Uncertainty challenges in service cost estimation for product-service systems in the aerospace and defence industries. In: Proceedings of the 1st CIRP Industrial Product-Service Systems (IPS2) conference, April 2009 Erkoyuncu JA, Roy R, Shehab E, Wardle P (2009) Uncertainty challenges in service cost estimation for product-service systems in the aerospace and defence industries. In: Proceedings of the 1st CIRP Industrial Product-Service Systems (IPS2) conference, April 2009
34.
go back to reference Knight JT, Singer DJ (2014) Applying real options analysis to naval ship design. In: Proceedings of ASNE Day Knight JT, Singer DJ (2014) Applying real options analysis to naval ship design. In: Proceedings of ASNE Day
35.
go back to reference Skaf J, Boyd SP (2010) Design of affine controllers via convex optimization. IEEE Trans Autom Control 55(11):2476–2487MathSciNetCrossRef Skaf J, Boyd SP (2010) Design of affine controllers via convex optimization. IEEE Trans Autom Control 55(11):2476–2487MathSciNetCrossRef
36.
go back to reference U.S. Government Accountability Office (2008) Improved analysis and cost data needed to evaluate the cost-effectiveness of performance-based logistics U.S. Government Accountability Office (2008) Improved analysis and cost data needed to evaluate the cost-effectiveness of performance-based logistics
37.
go back to reference Shen ZJ (2007) Integrated stochastic supply-chain design models. Comput Sci Eng 9(2):50–59CrossRef Shen ZJ (2007) Integrated stochastic supply-chain design models. Comput Sci Eng 9(2):50–59CrossRef
Metadata
Title
Product-Service Systems Under Availability-Based Contracts: Maintenance Optimization and Concurrent System and Contract Design
Authors
Amir Kashani Pour
Navid Goudarzi
Xin Lei
Peter Sandborn
Copyright Year
2017
DOI
https://doi.org/10.1007/978-3-319-49938-3_19