Skip to main content
Top

2022 | OriginalPaper | Chapter

Production Planning and Control Model to Increase On-Time Deliveries Through Demand-Driven MRP and PDCA in a Make-to-Order Environment of Non-primary Manufacturing Industry

Authors : Daeli Franco-Quispe, Diana Yauri-Tito, Jhonatan Cabel-Pozo, Carlos Raymundo

Published in: Human Interaction, Emerging Technologies and Future Systems V

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In recent years, production environments have gone from predictable to dynamic, therefore factors such as delivery time and a high percentage of customer satisfaction have become fundamental criteria for this new environment. Production planning and control (PPC) systems must be aligned with the new objectives of the manufacturers, however, the most popular PPC don’t satisfy their needs. This is how this article proposes a PPC model based on the Demand-Driven MRP system supported by the stages of the PDCA cycle so that it can perform optimally in dynamic environments such as make-to-order manufacturing models. As a result of the simulation in the case study, 100% compliance with deliveries on time was obtained and a reduction in lead time by 50.33%. Therefore, it is concluded that the proposed model is applicable and beneficial in this context.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
3.
go back to reference INEI: Informe Técnico - Producción Nacional. INEI (2020) INEI: Informe Técnico - Producción Nacional. INEI (2020)
4.
go back to reference INEI: Inform Técnico - Demografía Empresarial en el Perú (2020) INEI: Inform Técnico - Demografía Empresarial en el Perú (2020)
5.
go back to reference Ministerio de la Producción: Anuario estadístico industrial, mipyme y comercio interno (2019) Ministerio de la Producción: Anuario estadístico industrial, mipyme y comercio interno (2019)
6.
go back to reference Velasco Acosta, A.P., Mascle, C., Baptiste, P.: Applicability of demand-driven MRP in a complex manufacturing environment. Int. J. Prod. Res. 58(14), 4233–4245 (2020)CrossRef Velasco Acosta, A.P., Mascle, C., Baptiste, P.: Applicability of demand-driven MRP in a complex manufacturing environment. Int. J. Prod. Res. 58(14), 4233–4245 (2020)CrossRef
8.
go back to reference Kortabarria, A., Apaolaza, U., Lizarralde, A., Amorrortu, I.: Material management without forecasting: from MRP to demand driven MRP. J. Ind. Eng. Manag. 11(4), 632–650 (2018) Kortabarria, A., Apaolaza, U., Lizarralde, A., Amorrortu, I.: Material management without forecasting: from MRP to demand driven MRP. J. Ind. Eng. Manag. 11(4), 632–650 (2018)
9.
go back to reference Gupta, M., Snyder, D.: Comparing TOC with MRP and JIT: a literature review. Int. J. Prod. Res. 47(13), 3705–3739 (2009)CrossRef Gupta, M., Snyder, D.: Comparing TOC with MRP and JIT: a literature review. Int. J. Prod. Res. 47(13), 3705–3739 (2009)CrossRef
10.
go back to reference Linares, M., Mayorga Totaitive, D.: Diseño del modelo DDMRP para la planeación de la Producción en la empresa Wa-Armonía. Pontificia Universidad Javeriana, Bogotá, Colombia, p. 35 (2017) Linares, M., Mayorga Totaitive, D.: Diseño del modelo DDMRP para la planeación de la Producción en la empresa Wa-Armonía. Pontificia Universidad Javeriana, Bogotá, Colombia, p. 35 (2017)
11.
go back to reference Pai, R.R., Hebbar, S., Rodrigues, L.L.R.: Impact of delivery delay on the manufacturing firm inventories: a system dynamics approach. In: Proceedings of the Business Management International Conference 2015, February 2016 Pai, R.R., Hebbar, S., Rodrigues, L.L.R.: Impact of delivery delay on the manufacturing firm inventories: a system dynamics approach. In: Proceedings of the Business Management International Conference 2015, February 2016
12.
go back to reference Arunagiri, P., Gnanavelbabu, A.: Using Lean six sigma (LSS) systems, no. September 2014 (2013) Arunagiri, P., Gnanavelbabu, A.: Using Lean six sigma (LSS) systems, no. September 2014 (2013)
13.
go back to reference Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A.: Demand Driven MRP: assessment of a new approach to materials management. Int. J. Prod. Res. 57(1), 166–181 (2019)CrossRef Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A.: Demand Driven MRP: assessment of a new approach to materials management. Int. J. Prod. Res. 57(1), 166–181 (2019)CrossRef
14.
go back to reference Stefansson, H., Jensson, P., Shah, N.: Procedure for reducing the risk of delayed deliveries in make-to-order production. Prod. Plan. Control 20(4), 332–342 (2009)CrossRef Stefansson, H., Jensson, P., Shah, N.: Procedure for reducing the risk of delayed deliveries in make-to-order production. Prod. Plan. Control 20(4), 332–342 (2009)CrossRef
15.
go back to reference Flores-Andrade, K., Guardia-Miranda, R., Castro-Rangel, P., Raymundo-Ibañez, C., Perez, M.: Production management model through MPS and line balancing to reduce the non-fulfillment of orders in lingerie clothing MSEs in Peru. In: IOP Conference Series: Materials Science and Engineering, vol. 796, no. 1 (2020) Flores-Andrade, K., Guardia-Miranda, R., Castro-Rangel, P., Raymundo-Ibañez, C., Perez, M.: Production management model through MPS and line balancing to reduce the non-fulfillment of orders in lingerie clothing MSEs in Peru. In: IOP Conference Series: Materials Science and Engineering, vol. 796, no. 1 (2020)
16.
go back to reference Wight, O.: Manufacturing Resource Planning: MRP II: Unlocking America’s Productivity Potential. Wiley, New York (1995) Wight, O.: Manufacturing Resource Planning: MRP II: Unlocking America’s Productivity Potential. Wiley, New York (1995)
17.
go back to reference Olhager, J.: Evolution of operations planning and control: from production to supply chains. Int. J. Prod. Res. 51, 6836–6843 (2013)CrossRef Olhager, J.: Evolution of operations planning and control: from production to supply chains. Int. J. Prod. Res. 51, 6836–6843 (2013)CrossRef
18.
go back to reference Wilson, J.: The origin of material requirements planning in Frederick W. Taylor’s planning office. Int. J. Prod. Res. 54(5), 1535–1553 (2016)CrossRef Wilson, J.: The origin of material requirements planning in Frederick W. Taylor’s planning office. Int. J. Prod. Res. 54(5), 1535–1553 (2016)CrossRef
19.
go back to reference Ptak, C., Smith, C.: Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Norwalk (2016) Ptak, C., Smith, C.: Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Norwalk (2016)
20.
go back to reference Dimitrescu, A., Babis, C., Alecusan, A.M., Chivu, O., Faier, A.M.: Analysis of Quality Problems in Production System Using the PDCA Instrument. Fiability Durab. 1(21), 286–292 (2018) Dimitrescu, A., Babis, C., Alecusan, A.M., Chivu, O., Faier, A.M.: Analysis of Quality Problems in Production System Using the PDCA Instrument. Fiability Durab. 1(21), 286–292 (2018)
21.
go back to reference Kholif, A.M., Abou El Hassan, D.S., Khorshid, M.A., Elsherpieny, E.A., Olafadehan, O.A.: Implementation of model for improvement (PDCA-cycle) in dairy laboratories. J. Food Saf. 38(3), 1–7 (2018)CrossRef Kholif, A.M., Abou El Hassan, D.S., Khorshid, M.A., Elsherpieny, E.A., Olafadehan, O.A.: Implementation of model for improvement (PDCA-cycle) in dairy laboratories. J. Food Saf. 38(3), 1–7 (2018)CrossRef
Metadata
Title
Production Planning and Control Model to Increase On-Time Deliveries Through Demand-Driven MRP and PDCA in a Make-to-Order Environment of Non-primary Manufacturing Industry
Authors
Daeli Franco-Quispe
Diana Yauri-Tito
Jhonatan Cabel-Pozo
Carlos Raymundo
Copyright Year
2022
DOI
https://doi.org/10.1007/978-3-030-85540-6_155

Premium Partner