Skip to main content
Top
Published in: Production Engineering 3/2020

02-03-2020 | Production Management

Quantifying disturbance risks on the process time for a robust, synchronized individual production

Authors: Timo Heutmann, Alexander W. Tils, Robert H. Schmitt

Published in: Production Engineering | Issue 3/2020

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Due to high product variability, determining the risk of a disturbance for a production-process chain requires frequent as well as deliberate determination. If a disturbance becomes effective, it will have a tremendous negative effect on the adherence to delivery dates. This applies also to the synchronized individual production (SIP) principle. Accordingly, the principle lacks robustness in scientific as well as in industrial application. For this reason, this paper proposes an approach to quantify disturbance risks that lead to uncertain process times that prevent a robust SIP. The quantification methodology consists of a system definition, risk identification, and risk quantification. The assessment includes extending the risk matrix, adjusting the Failure Mode and Effects Analysis, plus determining general influence possibilities for each risk type. The proposed approach enables production planners to consider time uncertainty in form of a risk figure when determining nominal process times for each product or the production schedule. Consequently, delivery dates are more feasible and its adherence leads to a higher internal adherence to delivery of the production. The proposed approach has a high practical orientation, making its application easy on real production-process chains in a SIP.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Wiendahl HP (2014) Betriebsorganisation für Ingenieure. Hanser, Munich Wiendahl HP (2014) Betriebsorganisation für Ingenieure. Hanser, Munich
2.
go back to reference Weller R (2002) Verfahren zum kurzfristigen Störfallmanagement für die flexible Werkstattsteuerung. Zugl.: Stuttgart, Univ., Diss., 2003. Heimsheim: Jost-Jetter (IPA-IAO-Forschung und Praxis, 373) Weller R (2002) Verfahren zum kurzfristigen Störfallmanagement für die flexible Werkstattsteuerung. Zugl.: Stuttgart, Univ., Diss., 2003. Heimsheim: Jost-Jetter (IPA-IAO-Forschung und Praxis, 373)
3.
go back to reference Albach H (ed) (1993) Industrielles management. Gabler, Wiesbaden Albach H (ed) (1993) Industrielles management. Gabler, Wiesbaden
4.
go back to reference Heutmann T, Schmitt RH (2019) Predictive control of a synchronized individual production. Procedia CIRP 81:69–74CrossRef Heutmann T, Schmitt RH (2019) Predictive control of a synchronized individual production. Procedia CIRP 81:69–74CrossRef
5.
go back to reference Wilkner J, Rudberg M (2005) Integrating production and engineering perspectives on the customer order decoupling point. Int J Oper Prod Manag 25:623–641CrossRef Wilkner J, Rudberg M (2005) Integrating production and engineering perspectives on the customer order decoupling point. Int J Oper Prod Manag 25:623–641CrossRef
6.
go back to reference Feng K, Rao US, Raturi A (2011) Setting planned orders in master production scheduling under demand uncertainty. Int J Prod Res 49:4007–4025CrossRef Feng K, Rao US, Raturi A (2011) Setting planned orders in master production scheduling under demand uncertainty. Int J Prod Res 49:4007–4025CrossRef
7.
go back to reference Zakria G, Guan Z, Awan YR, Lizhi W (2010) Stochastic scheduling to minimize expected lateness in multiple identical machines. World academy of science. Eng Technol 61:380–384 Zakria G, Guan Z, Awan YR, Lizhi W (2010) Stochastic scheduling to minimize expected lateness in multiple identical machines. World academy of science. Eng Technol 61:380–384
9.
go back to reference Tavakkoli-Moghaddam R, Jolai F, Vaziri F, Ahmed PK, Azaron A (2005) A hybrid method for solving stochastic job shop scheduling problems. Appl Math Comput 170:185–206MathSciNetMATH Tavakkoli-Moghaddam R, Jolai F, Vaziri F, Ahmed PK, Azaron A (2005) A hybrid method for solving stochastic job shop scheduling problems. Appl Math Comput 170:185–206MathSciNetMATH
10.
go back to reference Gourgant M, Grangeon N, Norre S (2003) A contribution to the stochastic flow shop scheduling problem. Eur J Oper Res 151:415–433MathSciNetCrossRef Gourgant M, Grangeon N, Norre S (2003) A contribution to the stochastic flow shop scheduling problem. Eur J Oper Res 151:415–433MathSciNetCrossRef
12.
go back to reference Pinedo M (1983) Stochastic scheduling with release dates and due dates. Oper Res 31:559–572CrossRef Pinedo M (1983) Stochastic scheduling with release dates and due dates. Oper Res 31:559–572CrossRef
13.
14.
go back to reference Megow N (2008) Coping with incomplete information in scheduling: stochastic and online models. In: Kalcsics J, Nickel S (eds) Operations research proceedings. Springer-Verlag, Berlin, BerlinHeidelberg, pp 17–22 Megow N (2008) Coping with incomplete information in scheduling: stochastic and online models. In: Kalcsics J, Nickel S (eds) Operations research proceedings. Springer-Verlag, Berlin, BerlinHeidelberg, pp 17–22
15.
go back to reference Bechte W (1980) Theory and practice of load-oriented manufacturing control. Int J Prod Res 26(3):375–395CrossRef Bechte W (1980) Theory and practice of load-oriented manufacturing control. Int J Prod Res 26(3):375–395CrossRef
16.
go back to reference Spearman M, Woodruff D, Hopp W (1990) CONWIP: a pull alternative to kanban. Int J Prod Res 28:879–894CrossRef Spearman M, Woodruff D, Hopp W (1990) CONWIP: a pull alternative to kanban. Int J Prod Res 28:879–894CrossRef
17.
go back to reference Scholl A (1995) Balancing and sequencing of assembly lines. Dissertation, University Darmstadt Scholl A (1995) Balancing and sequencing of assembly lines. Dissertation, University Darmstadt
18.
go back to reference Ziskoven H (2013) Methodik zur Gestaltung und Auftragseinplanung einer getakteten Fertigung im Werkzeugbau. Dissertation, RWTH Aachen University Ziskoven H (2013) Methodik zur Gestaltung und Auftragseinplanung einer getakteten Fertigung im Werkzeugbau. Dissertation, RWTH Aachen University
19.
go back to reference Schmitt RH, Ellerich M, Humphrey S (2016) Multi-objective allocation of customized orders to production-line networks. CIRP Ann 65:429–432CrossRef Schmitt RH, Ellerich M, Humphrey S (2016) Multi-objective allocation of customized orders to production-line networks. CIRP Ann 65:429–432CrossRef
20.
go back to reference Fels A, Ellerich M, Schmitt R (2018) Cluster analysis for enhancing process quality in job shop production. In: Silva Gomes JF, Meguid SA (eds) IRF2018. Proceedings of the 6th international conference on integrity-reliability-failure: Lisbon/Portugal, 22–26 July 2018. Porto: FEUP-INEGI, S. 1413–1422 Fels A, Ellerich M, Schmitt R (2018) Cluster analysis for enhancing process quality in job shop production. In: Silva Gomes JF, Meguid SA (eds) IRF2018. Proceedings of the 6th international conference on integrity-reliability-failure: Lisbon/Portugal, 22–26 July 2018. Porto: FEUP-INEGI, S. 1413–1422
21.
go back to reference Patig S, Thorhauer S (2002) A new planning approach to cope with disruptions during production: using planning steps for flexible production planning. Wirtschaftsinformatik 44(4):355–366CrossRef Patig S, Thorhauer S (2002) A new planning approach to cope with disruptions during production: using planning steps for flexible production planning. Wirtschaftsinformatik 44(4):355–366CrossRef
22.
go back to reference Eversheim W (1992) Störungsmanagement in der Montage: erfolgreiche einzel- und kleinserienproduktion. VDI-Verlag, Düsseldorf Eversheim W (1992) Störungsmanagement in der Montage: erfolgreiche einzel- und kleinserienproduktion. VDI-Verlag, Düsseldorf
23.
go back to reference Sellappan N, Palanikumar K (2013) Modified prioritization methodology for risk priority number in failure mode and effects analysis. Int J Appl Sci Technol 3:27–36 Sellappan N, Palanikumar K (2013) Modified prioritization methodology for risk priority number in failure mode and effects analysis. Int J Appl Sci Technol 3:27–36
24.
go back to reference Koenig R (2008) Management of operational risks in producing companies. Dissertation, RWTH Aachen University Koenig R (2008) Management of operational risks in producing companies. Dissertation, RWTH Aachen University
25.
go back to reference Gutenberg E (1955) Grundlagen der betriebswirtschaftslehre: erster band: die produktion, 2nd edn. Springer-Verlag, BerlinCrossRef Gutenberg E (1955) Grundlagen der betriebswirtschaftslehre: erster band: die produktion, 2nd edn. Springer-Verlag, BerlinCrossRef
26.
go back to reference Dombrowski U (1988) Qualitätssicherung im Terminwesen der Werkstattfertigung. Dissertation, University Hanover Dombrowski U (1988) Qualitätssicherung im Terminwesen der Werkstattfertigung. Dissertation, University Hanover
27.
go back to reference von Cube JP, Haertel L, Schmitt R (2016) Model-based decision support in supply chains: requirements for monetary supply risk quantification. Procedia CIRP 57:171–176CrossRef von Cube JP, Haertel L, Schmitt R (2016) Model-based decision support in supply chains: requirements for monetary supply risk quantification. Procedia CIRP 57:171–176CrossRef
28.
go back to reference Yu KW (2001) Terminkennlinie: eine beschreibungsmethodik für die terminabweichung im produktionsbereich, vol 2/576. Fortschritt-Berichte, Düsseldorf Yu KW (2001) Terminkennlinie: eine beschreibungsmethodik für die terminabweichung im produktionsbereich, vol 2/576. Fortschritt-Berichte, Düsseldorf
29.
go back to reference Klöber-Koch J, Braunreuther S, Reinhart G (2018) Approach for risk identification and assessment in a manufacturing system. Proc CIRP 72:683–688CrossRef Klöber-Koch J, Braunreuther S, Reinhart G (2018) Approach for risk identification and assessment in a manufacturing system. Proc CIRP 72:683–688CrossRef
30.
go back to reference Heutmann T, Tils A, Schmitt RH (2018) Berücksichtigung der Zeitunsicherheit für eine robuste, synchronisierte Einzelfertigung. In: Riedel R (ed) Smarte produktion und digitale vernetzung. Wissenschaftliche Schriftreihe des Institutes für Betriebswissenschaften und Fabriksysteme IBF, Chemnitz, pp 123–132 Heutmann T, Tils A, Schmitt RH (2018) Berücksichtigung der Zeitunsicherheit für eine robuste, synchronisierte Einzelfertigung. In: Riedel R (ed) Smarte produktion und digitale vernetzung. Wissenschaftliche Schriftreihe des Institutes für Betriebswissenschaften und Fabriksysteme IBF, Chemnitz, pp 123–132
31.
go back to reference Lin N (2015) Applied business analytics: Integrating business process, big data, and advanced analytics. Safari Tech Books Online, Pearson, Upper Saddle River Lin N (2015) Applied business analytics: Integrating business process, big data, and advanced analytics. Safari Tech Books Online, Pearson, Upper Saddle River
32.
go back to reference Bilsing A (2007) Kennzahlengestutzte Bewertung der technologischen Leistungsfähigkeit der Fertigung im Werkzeug- und Formenbau. Dissertation, RWTH Aachen University Bilsing A (2007) Kennzahlengestutzte Bewertung der technologischen Leistungsfähigkeit der Fertigung im Werkzeug- und Formenbau. Dissertation, RWTH Aachen University
33.
go back to reference Eversheim W (2009) Innovations management for technical products. Springer, Berlin, HeidelbergCrossRef Eversheim W (2009) Innovations management for technical products. Springer, Berlin, HeidelbergCrossRef
34.
go back to reference Schatz A, Westkämper E, Bornhäuser M (2009) Takt-oriented production: a PPC method meeting the requirements of the tooling industry. In: Gantar G (ed) 7th international conference on industrial tools and material processing technologies, Ljubljana, pp 37-44 Schatz A, Westkämper E, Bornhäuser M (2009) Takt-oriented production: a PPC method meeting the requirements of the tooling industry. In: Gantar G (ed) 7th international conference on industrial tools and material processing technologies, Ljubljana, pp 37-44
Metadata
Title
Quantifying disturbance risks on the process time for a robust, synchronized individual production
Authors
Timo Heutmann
Alexander W. Tils
Robert H. Schmitt
Publication date
02-03-2020
Publisher
Springer Berlin Heidelberg
Published in
Production Engineering / Issue 3/2020
Print ISSN: 0944-6524
Electronic ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-020-00956-x

Other articles of this Issue 3/2020

Production Engineering 3/2020 Go to the issue

Premium Partners