Skip to main content
Top

2013 | OriginalPaper | Chapter

120. Research on Railway Tunnel Construction Scheduling Technique Based on LSM

Authors : Liqiang Liu, Yisheng Liu, Yuanjie Tang, Qing Li

Published in: LTLGB 2012

Publisher: Springer Berlin Heidelberg

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper analyzed the lack of schedule techniques for railway tunnel construction project. According to the linear project characteristics of the railway tunneling, attribute data standard for linear schedule of railway tunnel project have been studied. Moreover, an algorithm of railway tunnel project scheduling based on the Linear scheduling method is given. The algorithm is applied to an example of railway tunnel project to validate its effect.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Chrzanowski EN, Johnson DW (1986) Application of linear scheduling[J]. J Constr Eng Manag ASCE 112(4):476–491 Chrzanowski EN, Johnson DW (1986) Application of linear scheduling[J]. J Constr Eng Manag ASCE 112(4):476–491
go back to reference Harmelink DJ (1995) Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control. Ph.D. thesis, Iowa State University, Ames, Iowa Harmelink DJ (1995) Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control. Ph.D. thesis, Iowa State University, Ames, Iowa
go back to reference Harmelink DJ, Rowings JE (1998) Linear scheduling model: development of controlling activity path. J Constr Eng Manag 124(4):263–268 Harmelink DJ, Rowings JE (1998) Linear scheduling model: development of controlling activity path. J Constr Eng Manag 124(4):263–268
go back to reference Hassanem A (2002) Planning and scheduling highway construction using GIS and dynamic programming. Ph.D. thesis, Concordia University Montreal, Quebec, Canada Hassanem A (2002) Planning and scheduling highway construction using GIS and dynamic programming. Ph.D. thesis, Concordia University Montreal, Quebec, Canada
go back to reference Johnston D (1981) Linear scheduling method for highway construction[J]. J Constr Eng Manag ASCE 107(2):247–261 Johnston D (1981) Linear scheduling method for highway construction[J]. J Constr Eng Manag ASCE 107(2):247–261
go back to reference Kris G, Mattila AM ASCE, Amy Park (2003) Comparison of linear scheduling model and repetitive scheduling method. J Constr Eng Manag 129(1):56–64 Kris G, Mattila AM ASCE, Amy Park (2003) Comparison of linear scheduling model and repetitive scheduling method. J Constr Eng Manag 129(1):56–64
go back to reference Mubarak S (2010) Construction project scheduling and control. Wiley, Hoboken, pp 287–288 Mubarak S (2010) Construction project scheduling and control. Wiley, Hoboken, pp 287–288
go back to reference Vorster MC, Beliveau YJ, Bafna T (1992) Linear scheduling and visualization. Transp. Res. Rec. 1351, Transportation Research Board, Washington, D.C. (1992) pp 32–39 Vorster MC, Beliveau YJ, Bafna T (1992) Linear scheduling and visualization. Transp. Res. Rec. 1351, Transportation Research Board, Washington, D.C. (1992) pp 32–39
go back to reference Yamín RA, Harmelink DJ (2001) Comparison of linear scheduling model (LSM) and critical path method (CPM). J Constr Eng Manag 112(4):476–491 Yamín RA, Harmelink DJ (2001) Comparison of linear scheduling model (LSM) and critical path method (CPM). J Constr Eng Manag 112(4):476–491
Metadata
Title
Research on Railway Tunnel Construction Scheduling Technique Based on LSM
Authors
Liqiang Liu
Yisheng Liu
Yuanjie Tang
Qing Li
Copyright Year
2013
Publisher
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-34651-4_120