Skip to main content
Top

2021 | OriginalPaper | Chapter

Review of Successful Strategies for Adopting Offsite Construction Technology

Authors : Juma Hamisi Nzige, Guiwen Liu, Buberwa M. Tibesigwa, Dan Yinran

Published in: Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The adoption of Offsite Construction technology (OCT) has been viewed as a sustainable way of improving performance in the construction industry. The awareness and interest of OCT are increasing in all countries. Literature has repetitively appreciated the advantages, barriers and associated strategies for the adoption of OCT. Numerous studies have demonstrated the successful strategies for adoption of OCT in the global construction community. However, these strategies are seldom reviewed or classified especially in developing country context. Focusing on Tanzania construction industry this study aims to review and classify the strategies for promoting the adoption of OCT. The study adopted a mixed quantitative and qualitative, 29 strategies were obtained from existing literature. Interviews with 4 practitioners were conducted to confirm appropriate strategies for Tanzania. 12 strategies were selected and sent to six groups of construction practitioners based in Tanzania. A total of 117 questionnaires were collected. The top three ranks of strategies include “Promote research that geared towards the application of OCT”, “Low-cost loans and financial supports in OCT implementation” and “Developing mandatory OCT policies and regulations”. The paper also indicates four clusters based on aspects of strategic management namely, “Operation”, “Market”, “Management”, and “research development and information management”. This study provides empirical evidence of the important strategies, which are valuable references to the policymakers on deciding which strategy to prioritize more for practical adoption of OCT. Future research will investigate the causal relationships among the strategies and their impacts on the OCT adoption process.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Arif, M., & Egbu, C. (2010). Making a case for offsite construction in China: . Engineering, Construction and Architectural Management, 17(6), 536–548.CrossRef Arif, M., & Egbu, C. (2010). Making a case for offsite construction in China: . Engineering, Construction and Architectural Management, 17(6), 536–548.CrossRef
2.
go back to reference Blismas, N., Wakefield, R. (2009). Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1), 72–83. Blismas, N., Wakefield, R. (2009). Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1), 72–83.
3.
go back to reference Jiang, L., Li, Z., Li, L., & Gao, Y. (2018). Constraints on the promotion of prefabricated construction in China. Sustainability, 10(7), 2516.CrossRef Jiang, L., Li, Z., Li, L., & Gao, Y. (2018). Constraints on the promotion of prefabricated construction in China. Sustainability, 10(7), 2516.CrossRef
4.
go back to reference Warszawski, A. (1999). Industrialized and automated building systems. A managerial approach. , London: Taylor and Francis Group, LLC. Warszawski, A. (1999). Industrialized and automated building systems. A managerial approach. , London: Taylor and Francis Group, LLC.
5.
go back to reference Rahimian, F. P., Goulding, J., Akintoye, A., & Kolo, S. (2017). Review of motivations, success factors, and barriers to the adoption of offsite manufacturing in Nigeria. Procedia Engineering, 196, 512–519.CrossRef Rahimian, F. P., Goulding, J., Akintoye, A., & Kolo, S. (2017). Review of motivations, success factors, and barriers to the adoption of offsite manufacturing in Nigeria. Procedia Engineering, 196, 512–519.CrossRef
6.
go back to reference Bari, N. A. A., Abdullah, N. A., Yusuff, R., Ismail, N., Jaapar, A. (2012). Environmental awareness and benefits of industrialized building systems (IBS). Procedia—Social and Behavioral Sciences, 50, 392–404. Bari, N. A. A., Abdullah, N. A., Yusuff, R., Ismail, N., Jaapar, A. (2012). Environmental awareness and benefits of industrialized building systems (IBS). Procedia—Social and Behavioral Sciences, 50, 392–404.
7.
go back to reference Krug, D. (2013). Offsite construction: Sustainable characteristics. Krug, D. (2013). Offsite construction: Sustainable characteristics.
8.
go back to reference Yunus, R., Yang, J. (2011). Sustainability criteria for industrialised building systems (IBS) in Malaysia. Procedia Engineering, 14, 1590–1498 Yunus, R., Yang, J. (2011). Sustainability criteria for industrialised building systems (IBS) in Malaysia. Procedia Engineering, 14, 1590–1498
9.
go back to reference Jaillon, L., & Poon, C. S. (2008). Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), 953–966.CrossRef Jaillon, L., & Poon, C. S. (2008). Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), 953–966.CrossRef
10.
go back to reference Zhu, H., Hong, J., Shen, G. Q., Mao, C., Zhang, H., & Li, Z. (2018). The exploration of the life-cycle energy saving potential for using prefabrication in residential buildings in China. Energy and Buildings, 166, 561–570.CrossRef Zhu, H., Hong, J., Shen, G. Q., Mao, C., Zhang, H., & Li, Z. (2018). The exploration of the life-cycle energy saving potential for using prefabrication in residential buildings in China. Energy and Buildings, 166, 561–570.CrossRef
11.
go back to reference Lu, W., Chen, K., Xue, F., & Pan, W. (2018). Searching for an optimal level of prefabrication in construction: An analytical framework. Journal of Cleaner Production, 201, 236–245.CrossRef Lu, W., Chen, K., Xue, F., & Pan, W. (2018). Searching for an optimal level of prefabrication in construction: An analytical framework. Journal of Cleaner Production, 201, 236–245.CrossRef
12.
go back to reference Mostafa, S., Chileshe, N., & Abdelhamid, T. (2016). Lean and agile integration within offsite construction using discrete event simulation. Construction Innovation, 16(4), 483–525.CrossRef Mostafa, S., Chileshe, N., & Abdelhamid, T. (2016). Lean and agile integration within offsite construction using discrete event simulation. Construction Innovation, 16(4), 483–525.CrossRef
13.
go back to reference Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007). Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), 183–194.CrossRef Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007). Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), 183–194.CrossRef
14.
go back to reference Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018). Barriers to promoting prefabricated construction in China: A cost-benefit analysis. Journal of Cleaner Production, 172, 649–660.CrossRef Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018). Barriers to promoting prefabricated construction in China: A cost-benefit analysis. Journal of Cleaner Production, 172, 649–660.CrossRef
15.
go back to reference Goulding, J. S., Pour Rahimian, F., Arif, M., & Sharp, M. D. (2014). New offsite production and business models in construction: Priorities for the future research agenda. Architectural Engineering and Design Management, 11(3), 163–184.CrossRef Goulding, J. S., Pour Rahimian, F., Arif, M., & Sharp, M. D. (2014). New offsite production and business models in construction: Priorities for the future research agenda. Architectural Engineering and Design Management, 11(3), 163–184.CrossRef
16.
go back to reference Alinaitwe, H. M., Mwakali, J., & Hansson, B. (2006). Assessing the degree of industrialisation in construction: A case of Uganda. Journal of Civil Engineering and Management, 12(3), 221–229.CrossRef Alinaitwe, H. M., Mwakali, J., & Hansson, B. (2006). Assessing the degree of industrialisation in construction: A case of Uganda. Journal of Civil Engineering and Management, 12(3), 221–229.CrossRef
17.
go back to reference NBS. (2018). National Bureau of Statistics: Highlights for The Third Quarter (July-September) Gross Domestic Product 2017, Dares Salaam; January 2018. NBS. (2018). National Bureau of Statistics: Highlights for The Third Quarter (July-September) Gross Domestic Product 2017, Dares Salaam; January 2018.
18.
go back to reference Kikwasi, G. J. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. In N. Chileshe, M. Rofe, & R. Ameezdeen, (Eds.), Proceedings of the 6th International Conference and Workshop on Built Environment in Developing Countries. Fragmented Futures: the built environment in a volatile world, 138–148. Kikwasi, G. J. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. In N. Chileshe, M. Rofe, & R. Ameezdeen, (Eds.), Proceedings of the 6th International Conference and Workshop on Built Environment in Developing Countries. Fragmented Futures: the built environment in a volatile world, 138–148.
19.
go back to reference Ilahuka, H. N. (2012). Harnessing technology. Dar es Salaam: CRB. Ilahuka, H. N. (2012). Harnessing technology. Dar es Salaam: CRB.
20.
go back to reference NCC. (2003). National Construction Council: Tanzania Construction Industry Policy, Dar es Salaam; November, 2003. NCC. (2003). National Construction Council: Tanzania Construction Industry Policy, Dar es Salaam; November, 2003.
21.
go back to reference Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016). Cost analysis for sustainable off-site construction based on a multiple-case study in China. Habitat International, 57, 215–222.CrossRef Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016). Cost analysis for sustainable off-site construction based on a multiple-case study in China. Habitat International, 57, 215–222.CrossRef
22.
go back to reference Zhai, X., Reed, R., & Mills, A. (2014). Factors impeding the offsite production of housing construction in China: An investigation of current practice. Construction Management and Economics, 32(1–2), 40–52.CrossRef Zhai, X., Reed, R., & Mills, A. (2014). Factors impeding the offsite production of housing construction in China: An investigation of current practice. Construction Management and Economics, 32(1–2), 40–52.CrossRef
23.
go back to reference Chan, A. P. C., Darko, A., Ameyaw, E. E. (2017). Strategies for promoting green building technologies adoption in the construction industry—An international study. Sustainability, 9(6):969. Chan, A. P. C., Darko, A., Ameyaw, E. E. (2017). Strategies for promoting green building technologies adoption in the construction industry—An international study. Sustainability, 9(6):969.
24.
go back to reference Hansen, K. L., & Tatum, C. B. (1989). Technology and strategic management in construction. Journal of Construction Engineering & Management, 5(1), 67–83. Hansen, K. L., & Tatum, C. B. (1989). Technology and strategic management in construction. Journal of Construction Engineering & Management, 5(1), 67–83.
25.
go back to reference Langford, D. A., & Male, S. (2002). Strategic management in construction: Engineering. Construction and Architectural Management, 9(4), 362–364.CrossRef Langford, D. A., & Male, S. (2002). Strategic management in construction: Engineering. Construction and Architectural Management, 9(4), 362–364.CrossRef
26.
go back to reference Mintzberg, H. (1987). The strategy concept I: Five Ps for strategy. California Management Review, 30(1), 11–24.CrossRef Mintzberg, H. (1987). The strategy concept I: Five Ps for strategy. California Management Review, 30(1), 11–24.CrossRef
27.
go back to reference Wheelen, T. L., & Hunger, J. D. (2012). Strategic management and business policy: Toward global sustainability (13th ed.). London, UK: Pearson Education Limited. Wheelen, T. L., & Hunger, J. D. (2012). Strategic management and business policy: Toward global sustainability (13th ed.). London, UK: Pearson Education Limited.
28.
go back to reference Macmillan, H., Tampoe, M. (2001). Strategic management process, content and implementation. Oxford University Press. Macmillan, H., Tampoe, M. (2001). Strategic management process, content and implementation. Oxford University Press.
29.
go back to reference Mintzberg, H., Ahlstrand, B., & Lampel, J. (1998). Strategy Safari: A guided tour through the wilds of strategic management. New York: The Free Press. Mintzberg, H., Ahlstrand, B., & Lampel, J. (1998). Strategy Safari: A guided tour through the wilds of strategic management. New York: The Free Press.
30.
go back to reference Arif, F., Azhar, N., Bayraktar, M. E. (2012). Strategic management concepts and practices in Pakistan: A construction industry perspective. In American Society of Civil Engineers Construction Research Congress 2012, 1530–1539 Arif, F., Azhar, N., Bayraktar, M. E. (2012). Strategic management concepts and practices in Pakistan: A construction industry perspective. In American Society of Civil Engineers Construction Research Congress 2012, 1530–1539
31.
go back to reference Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018). Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. Journal of Cleaner Production, 183, 183–193.CrossRef Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018). Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. Journal of Cleaner Production, 183, 183–193.CrossRef
32.
go back to reference Musa, M. F., Mohammad, M. F., Yusof, M. R., Mahbub, R. (2015). The way forward for industrialised building system (IBS) in Malaysia. In R. Hassan, M. Yusoff, A. Alisibramulisi, N.M. Amin, Z. Ismail (Eds.) Proceedings of the International Civil and Infrastructure Engineering Conference 2014 (pp. 163–175). Singapore: Springer. Musa, M. F., Mohammad, M. F., Yusof, M. R., Mahbub, R. (2015). The way forward for industrialised building system (IBS) in Malaysia. In R. Hassan, M. Yusoff, A. Alisibramulisi, N.M. Amin, Z. Ismail (Eds.) Proceedings of the International Civil and Infrastructure Engineering Conference 2014 (pp. 163–175). Singapore: Springer.
33.
go back to reference Salama, T., Salah, A., Moselhi, O., & Al-Hussein, M. (2017). Near optimum selection of module configuration for efficient modular construction. Automation in Construction, 83, 316–329.CrossRef Salama, T., Salah, A., Moselhi, O., & Al-Hussein, M. (2017). Near optimum selection of module configuration for efficient modular construction. Automation in Construction, 83, 316–329.CrossRef
34.
go back to reference Pheng, L. S., & Chuan, C. J. (2001). Just-in-time management of precast concrete components. Journal of Construction Engineering & Management, 127(6), 494–501.CrossRef Pheng, L. S., & Chuan, C. J. (2001). Just-in-time management of precast concrete components. Journal of Construction Engineering & Management, 127(6), 494–501.CrossRef
35.
go back to reference Said, H. (2015). Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering & Management, 141(12), 4015045.CrossRef Said, H. (2015). Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering & Management, 141(12), 4015045.CrossRef
36.
go back to reference Wu, P., Low, S. P. (2012). Lean management and low carbon emissions in precast concrete factories in Singapore. Journal of Architectural Engineering, 18(2). Wu, P., Low, S. P. (2012). Lean management and low carbon emissions in precast concrete factories in Singapore. Journal of Architectural Engineering, 18(2).
37.
go back to reference Kim, Y.-W., Azari, N. R., Yi, J,-S., Bae, J. (2013). Environmental impacts comparison between on-site vs. prefabricated Just-In-Time (prefab-JIT) rebar supply in construction projects. Journal of Civil Engineering and Management, 19(5), 647–55. Kim, Y.-W., Azari, N. R., Yi, J,-S., Bae, J. (2013). Environmental impacts comparison between on-site vs. prefabricated Just-In-Time (prefab-JIT) rebar supply in construction projects. Journal of Civil Engineering and Management, 19(5), 647–55.
38.
go back to reference Hanna, A. S., Mikhail, G., & Iskandar, K. A. (2017). State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering & Management, 143(2), 4016097.CrossRef Hanna, A. S., Mikhail, G., & Iskandar, K. A. (2017). State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering & Management, 143(2), 4016097.CrossRef
39.
go back to reference Kamar, K. A. M., Alshawi, M., & Hamid, Z. A. (2009). Industrialised building system: The critical success factors. In V. Ahmed, M. Alshawi, C. Egbu, & M. Sutrisna (Eds.), The Buhu 19th International Postgraduate Research Conference (pp. 485–497). Salford, United Kingdom: In-house publication. Kamar, K. A. M., Alshawi, M., & Hamid, Z. A. (2009). Industrialised building system: The critical success factors. In V. Ahmed, M. Alshawi, C. Egbu, & M. Sutrisna (Eds.), The Buhu 19th International Postgraduate Research Conference (pp. 485–497). Salford, United Kingdom: In-house publication.
40.
go back to reference Arashpour, M., Wakefield, R., Abbasi, B., Arashpour, M., & Hosseini, R. (2017). Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1–2), 46–59. Arashpour, M., Wakefield, R., Abbasi, B., Arashpour, M., & Hosseini, R. (2017). Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1–2), 46–59.
41.
go back to reference Said, H. (2016). Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering & Management, 142(2), 4015071.CrossRef Said, H. (2016). Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering & Management, 142(2), 4015071.CrossRef
42.
go back to reference Bryman, A. (2012). Social research methods (4th ed.). New York: Oxford University Press. Bryman, A. (2012). Social research methods (4th ed.). New York: Oxford University Press.
43.
go back to reference Dainty, A. (2008). Methodological pluralism in construction management research. In A. Knight & L. Ruddock (Eds.), Advanced research methods for the built environment (pp. 1–13). Oxford: Wiley-Blackwell. Dainty, A. (2008). Methodological pluralism in construction management research. In A. Knight & L. Ruddock (Eds.), Advanced research methods for the built environment (pp. 1–13). Oxford: Wiley-Blackwell.
44.
go back to reference Li, Z., Shen, G. Q., & Xue, X. (2014). Critical review of the research on the management of prefabricated construction. Habitat International, 43, 240–249.CrossRef Li, Z., Shen, G. Q., & Xue, X. (2014). Critical review of the research on the management of prefabricated construction. Habitat International, 43, 240–249.CrossRef
45.
go back to reference Creswell, J. W. (2007). Qualitative inquiry and research design: Choosing among five approaches. London, United Kingdom: Sage Publications Inc. Creswell, J. W. (2007). Qualitative inquiry and research design: Choosing among five approaches. London, United Kingdom: Sage Publications Inc.
46.
go back to reference Darko, A., Chan, A. P. C., Ameyaw, E. E., He, B.-J., & Olanipekun, A. O. (2017). Examining issues influencing green building technologies adoption: The United States green building experts’ perspectives. Energy and Buildings, 144, 320–332.CrossRef Darko, A., Chan, A. P. C., Ameyaw, E. E., He, B.-J., & Olanipekun, A. O. (2017). Examining issues influencing green building technologies adoption: The United States green building experts’ perspectives. Energy and Buildings, 144, 320–332.CrossRef
47.
go back to reference Darko, A., & Chan, A. P. C. (2016). Critical analysis of green building research trend in construction journals. Habitat International, 57, 53–63.CrossRef Darko, A., & Chan, A. P. C. (2016). Critical analysis of green building research trend in construction journals. Habitat International, 57, 53–63.CrossRef
48.
go back to reference Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007). Towards adoption of prefabrication in construction. Building and Environment, 42(10), 3642–3654.CrossRef Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007). Towards adoption of prefabrication in construction. Building and Environment, 42(10), 3642–3654.CrossRef
49.
go back to reference Chen, Y., Okudan, G. E., & Riley, D. R. (2010). Sustainable performance criteria for construction method selection in concrete buildings. Automation in Construction, 19(2), 235–244.CrossRef Chen, Y., Okudan, G. E., & Riley, D. R. (2010). Sustainable performance criteria for construction method selection in concrete buildings. Automation in Construction, 19(2), 235–244.CrossRef
50.
go back to reference Goh, E., & Loosemore, M. (2017). The impacts of industrialization on construction subcontractors: A resource-based view. Construction Management and Economics, 35(5), 288–304.CrossRef Goh, E., & Loosemore, M. (2017). The impacts of industrialization on construction subcontractors: A resource-based view. Construction Management and Economics, 35(5), 288–304.CrossRef
51.
go back to reference Oral, E. L., Mıstıkoglu, G., & Erdis, E. (2003). JIT in developing countries: A case study of the Turkish prefabrication sector. Building and Environment, 38(6), 853–860.CrossRef Oral, E. L., Mıstıkoglu, G., & Erdis, E. (2003). JIT in developing countries: A case study of the Turkish prefabrication sector. Building and Environment, 38(6), 853–860.CrossRef
52.
go back to reference Khalili, A., & Chua, D. K. H. (2013). IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabrication. Journal of Computing in Civil Engineering, 27(3), 243–253.CrossRef Khalili, A., & Chua, D. K. H. (2013). IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabrication. Journal of Computing in Civil Engineering, 27(3), 243–253.CrossRef
53.
go back to reference Kim, M.-K., Wang, Q., Park, J.-W., Cheng, J. C. P., Sohn, H., & Chang, C.-C. (2016). Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM. Automation in Construction, 72, 102–114.CrossRef Kim, M.-K., Wang, Q., Park, J.-W., Cheng, J. C. P., Sohn, H., & Chang, C.-C. (2016). Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM. Automation in Construction, 72, 102–114.CrossRef
54.
go back to reference Ramaji, I. J., & Memari, A. M. (2016). Product architecture model for multistory modular buildings. Journal of Construction Engineering & Management, 142(10), 4016047.CrossRef Ramaji, I. J., & Memari, A. M. (2016). Product architecture model for multistory modular buildings. Journal of Construction Engineering & Management, 142(10), 4016047.CrossRef
55.
go back to reference Tam, V. W. Y., Fung, I. W. H., Sing, M. C. P., & Ogunlana, S. O. (2015). Best practice of prefabrication implementation in the Hong Kong public and private sectors. Journal of Cleaner Production, 109, 216–231.CrossRef Tam, V. W. Y., Fung, I. W. H., Sing, M. C. P., & Ogunlana, S. O. (2015). Best practice of prefabrication implementation in the Hong Kong public and private sectors. Journal of Cleaner Production, 109, 216–231.CrossRef
56.
go back to reference Mao, C., Shen, Q., Pan, W., Ye, K. (2015) Major barriers to off-site construction: The developer’s perspective in China. Journal of Management in Engineering, 31(3). Mao, C., Shen, Q., Pan, W., Ye, K. (2015) Major barriers to off-site construction: The developer’s perspective in China. Journal of Management in Engineering, 31(3).
57.
go back to reference Gibbons, D. J., & Chakraborti, S. (2011). Nonparametric statistical inference. LLC, New York: Taylor and Francis Group. Gibbons, D. J., & Chakraborti, S. (2011). Nonparametric statistical inference. LLC, New York: Taylor and Francis Group.
58.
go back to reference Hollander, M., Wolfe, D. A., & Chicken, E. (2014). Nonparametric statistical methods. New Jersey: Wiley. Hollander, M., Wolfe, D. A., & Chicken, E. (2014). Nonparametric statistical methods. New Jersey: Wiley.
59.
go back to reference Hutcheson, G. D., & Sofroniou, N. (1999). The multivariate social scientist: Introductory statistics using generalized linear models. London, UK: SAGE Publications Ltd.CrossRef Hutcheson, G. D., & Sofroniou, N. (1999). The multivariate social scientist: Introductory statistics using generalized linear models. London, UK: SAGE Publications Ltd.CrossRef
60.
go back to reference Morgan, G. A., Leech, N. L., Gloeckner, G. W., & Barrett, K. C. (2011). IBM SPSS For Introductory Statistics: Use and Interpretation (4th ed.). LLC, London, UK: Taylor and Francis Group.CrossRef Morgan, G. A., Leech, N. L., Gloeckner, G. W., & Barrett, K. C. (2011). IBM SPSS For Introductory Statistics: Use and Interpretation (4th ed.). LLC, London, UK: Taylor and Francis Group.CrossRef
61.
go back to reference Pallant, J. (2010). SPSS survival manual: A step by step guide to data analysis using SPSS (4th ed.). Australia: Allen & Unwin. Pallant, J. (2010). SPSS survival manual: A step by step guide to data analysis using SPSS (4th ed.). Australia: Allen & Unwin.
62.
go back to reference Rutherford, A. (2001). Introducing Anova and Ancova: A GLM approach. London, United Kingdom: SAGE Publications Ltd. Rutherford, A. (2001). Introducing Anova and Ancova: A GLM approach. London, United Kingdom: SAGE Publications Ltd.
63.
go back to reference Wu, H., Mao, C., & Liu, G. (2015). Market expectations of government’s measures to promote off-site construction in mainland China: Developers’ perspective. In L. Y. Shen, K. Ye, & C. Mao (Eds.), 19th International Symposium on Advancement of Construction Management and Real Estate (pp. 1053–1063). Berlin, German: Springer International Publishing. Wu, H., Mao, C., & Liu, G. (2015). Market expectations of government’s measures to promote off-site construction in mainland China: Developers’ perspective. In L. Y. Shen, K. Ye, & C. Mao (Eds.), 19th International Symposium on Advancement of Construction Management and Real Estate (pp. 1053–1063). Berlin, German: Springer International Publishing.
64.
go back to reference Gann, D. M, Salter, A. J. (2000). Innovation in project-based, service-enhanced firms: The construction of complex products and systems. Research Policy, 29, 955–972 Gann, D. M, Salter, A. J. (2000). Innovation in project-based, service-enhanced firms: The construction of complex products and systems. Research Policy, 29, 955–972
65.
go back to reference Peansupap, V., Walker, D. H. T. (2006). Innovation diffusion at the implementation stage of a construction project: a case study of information communication technology. Construction Management and Economics, 24(3), 321–332 Peansupap, V., Walker, D. H. T. (2006). Innovation diffusion at the implementation stage of a construction project: a case study of information communication technology. Construction Management and Economics, 24(3), 321–332
Metadata
Title
Review of Successful Strategies for Adopting Offsite Construction Technology
Authors
Juma Hamisi Nzige
Guiwen Liu
Buberwa M. Tibesigwa
Dan Yinran
Copyright Year
2021
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-15-8892-1_133