Skip to main content
Top

2024 | OriginalPaper | Chapter

Sample Size Analysis for a Production Line Study of Time

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Setting labor standards is an important topic to operational and strategic planning which requires the time studies establishment. This paper applies the statistical method for the definition of a sample size in order to define a reliable cycle time for a real industrial process. For the case study it is considered a welding process performed by a single operator that does the load and unload of components in 4 different welding machines. In order to perform the time studies, it is necessary to collect continuously data in the production line by measuring the time taken for the operator to perform the task. In order to facilitate the measurements, the task is divided into small elements with visible start and end points, called Measurement Points, in which the measurement process is applied. Afterwards, the statistical method enables to determine the sample size of observations to calculate the reliable cycle time. For the welding process presented, it is stated that the sample size defined through the statistical method is 20. Thus, these time observations of the task are continuously collected in order to obtain a reliable cycle time for this welding process. This time study can be implemented in similar way in other industrial processes.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Heizer, J., Render, B., Munson, C., Sachan, A.: Operations Management: Sustainability and Supply Chain Management, 12th edn. Pearson Education, London (2017) Heizer, J., Render, B., Munson, C., Sachan, A.: Operations Management: Sustainability and Supply Chain Management, 12th edn. Pearson Education, London (2017)
2.
go back to reference Worley, J.M., Doolen, T.L.: Organizational structure, employee problem solving, and lean implementation. Int. J. Lean Six Sigma (2015) Worley, J.M., Doolen, T.L.: Organizational structure, employee problem solving, and lean implementation. Int. J. Lean Six Sigma (2015)
3.
go back to reference Jackson, T.L.: Hoshin Kanri for the Lean Enterprise: Developing Competitive Capabilities and Managing Profit. Productivity Press, New York (2019) Jackson, T.L.: Hoshin Kanri for the Lean Enterprise: Developing Competitive Capabilities and Managing Profit. Productivity Press, New York (2019)
4.
go back to reference Liker, J.K., Meier, D., Franz, J.K.: The Toyota Way to Success EBOOK BUNDLE. McGraw Hill Professional, New York (2013) Liker, J.K., Meier, D., Franz, J.K.: The Toyota Way to Success EBOOK BUNDLE. McGraw Hill Professional, New York (2013)
5.
go back to reference Liker, J., Hoseus, M.: Toyota Culture: The Heart and Soul of the Toyota Way. McGraw-Hill Education, New York (2008) Liker, J., Hoseus, M.: Toyota Culture: The Heart and Soul of the Toyota Way. McGraw-Hill Education, New York (2008)
6.
go back to reference Witcher, B.J., Butterworth, R.: Hoshin Kanri: policy management in Japanese-owned UK subsidiaries. J. Manage. Stud. 38(5), 651–674 (2001)CrossRef Witcher, B.J., Butterworth, R.: Hoshin Kanri: policy management in Japanese-owned UK subsidiaries. J. Manage. Stud. 38(5), 651–674 (2001)CrossRef
7.
go back to reference da Silveira, W.G., de Lima, E.P., da Costa, S.E.G., Deschamps, F.: Guidelines for Hoshin Kanri implementation: development and discussion. Prod. Plann. Control 28(10), 843–859 (2017)CrossRef da Silveira, W.G., de Lima, E.P., da Costa, S.E.G., Deschamps, F.: Guidelines for Hoshin Kanri implementation: development and discussion. Prod. Plann. Control 28(10), 843–859 (2017)CrossRef
8.
go back to reference Tennant, C., Roberts, P.: Hoshin Kanri: a tool for strategic policy deployment. Knowl. Process. Manag. 8(4), 262–269 (2001)CrossRef Tennant, C., Roberts, P.: Hoshin Kanri: a tool for strategic policy deployment. Knowl. Process. Manag. 8(4), 262–269 (2001)CrossRef
9.
go back to reference Stevenson, W.J., Hojati, M., Cao, J.: Operations Management. McGraw-Hill Education, Chicago (2014) Stevenson, W.J., Hojati, M., Cao, J.: Operations Management. McGraw-Hill Education, Chicago (2014)
10.
go back to reference Monden, Y.: Toyota Production System: An Integrated Approach to Just-in-Time. CRC Press, Boca Raton (2011) Monden, Y.: Toyota Production System: An Integrated Approach to Just-in-Time. CRC Press, Boca Raton (2011)
11.
go back to reference Lacerda, A.P., Xambre, A.R., Alvelos, H.M.: Applying value stream mapping to eliminate waste: a case study of an original equipment manufacturer for the automotive industry. Int. J. Prod. Res. 54(6), 1708–1720 (2016)CrossRef Lacerda, A.P., Xambre, A.R., Alvelos, H.M.: Applying value stream mapping to eliminate waste: a case study of an original equipment manufacturer for the automotive industry. Int. J. Prod. Res. 54(6), 1708–1720 (2016)CrossRef
12.
go back to reference Chen, J.C., Li, Y., Shady, B.D.: From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study. Int. J. Prod. Res. 48(4), 1069–1086 (2010)CrossRef Chen, J.C., Li, Y., Shady, B.D.: From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study. Int. J. Prod. Res. 48(4), 1069–1086 (2010)CrossRef
13.
go back to reference Melander, A., Andersson, D., Elgh, F., Fjellstedt, F., Löfving, M., Ehnsiö, R.: Implementing Hoshin Kanri: How to Manage Strategy Through Policy Deployment and Continuous Improvement. Productivity Press, New York (2021) Melander, A., Andersson, D., Elgh, F., Fjellstedt, F., Löfving, M., Ehnsiö, R.: Implementing Hoshin Kanri: How to Manage Strategy Through Policy Deployment and Continuous Improvement. Productivity Press, New York (2021)
14.
go back to reference Gill, A., Bector, C., Hawaleshka, O.: Sample size formula in work measurement under a fuzzy environment. Int. J. Oper. Prod. Manag. (1994) Gill, A., Bector, C., Hawaleshka, O.: Sample size formula in work measurement under a fuzzy environment. Int. J. Oper. Prod. Manag. (1994)
15.
go back to reference Yusoff, N., Jaffar, A., Abbas, N.M., Saad, N.H.: Work measurement for process improvement in the car seat polyurethane injection manufacturing line. Procedia Eng. 41, 1800–1805 (2012)CrossRef Yusoff, N., Jaffar, A., Abbas, N.M., Saad, N.H.: Work measurement for process improvement in the car seat polyurethane injection manufacturing line. Procedia Eng. 41, 1800–1805 (2012)CrossRef
16.
go back to reference ur Rehman, A., Ramzan, M.B., Shafiq, M., Rasheed, A., Naeem, M.S., Savino, M.M.: Productivity improvement through time study approach: a case study from an apparel manufacturing industry of Pakistan. Procedia Manuf. 39, 1447–1454 (2019) ur Rehman, A., Ramzan, M.B., Shafiq, M., Rasheed, A., Naeem, M.S., Savino, M.M.: Productivity improvement through time study approach: a case study from an apparel manufacturing industry of Pakistan. Procedia Manuf. 39, 1447–1454 (2019)
17.
go back to reference Baines, A.: Work measurement–the basic principles revisited. Work Study (1995) Baines, A.: Work measurement–the basic principles revisited. Work Study (1995)
18.
go back to reference Chan, Y.L., Yuan, Y.: Dealing with fuzziness in cost-volume-profit analysis. Account. Bus. Res. 20(78), 83–95 (1990)CrossRef Chan, Y.L., Yuan, Y.: Dealing with fuzziness in cost-volume-profit analysis. Account. Bus. Res. 20(78), 83–95 (1990)CrossRef
19.
go back to reference Walpole, R.E., Myers, R.H., Myers, S.L., Ye, K.: Probability and Statistics for Engineers and Scientists, vol. 5. Macmillan, New York (1993) Walpole, R.E., Myers, R.H., Myers, S.L., Ye, K.: Probability and Statistics for Engineers and Scientists, vol. 5. Macmillan, New York (1993)
Metadata
Title
Sample Size Analysis for a Production Line Study of Time
Authors
Maria Isabel da Silva
Clara Bento Vaz
Copyright Year
2024
DOI
https://doi.org/10.1007/978-3-031-38165-2_22

Premium Partner