Skip to main content
Top

2018 | OriginalPaper | Chapter

9. Specialized Methods in the Research of Mega Infrastructure Construction Management

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

It has been previously emphasized that mega infrastructure construction management involves many fields, including politics, the economy, society, technology, and human disciplines, and that no management that masters the overall complexity of the management problems can emerge without the integration of the natural sciences, social sciences, and human disciplines. This fact suggests that different types of methods are demanded for solving management problems in mega infrastructure construction. Thus, the exploration and introduction of new methods directed by theoretical methodology of mega infrastructure construction management are required. Accordingly, four points must be emphasized:
1.
Regarding the management problems of mega infrastructure construction, there is a group of problems concerned with engineering technology and natural laws that can be solved by quantitative methods that are widely used in other fields. However, people may also create and implement new quantitative methods in mega infrastructure construction management, but these methods are usually regarded as improvements of existing mature methods rather than new methods. In other words, in the theoretical research of mega infrastructure construction management, there are few completely new and unique quantitative systems. Therefore, there is no need to provide a list of these mature quantitative methods.
 
2.
There are many qualitative methods in the theoretical field of mega infrastructure construction that are identical to those used in social science research. However, because the management problems of mega infrastructure construction have unique properties, there must be a class of new methods other than the ordinary quantitative methods that demonstrate this feature. Hence, the panoramic qualitative analysis is introduced.
 
3.
In recent years, the information and computer technology field gains increasingly more weight in the research of mega infrastructure construction management. For example, technologies such as computer simulations and computational experiments provide new means for the managerial activities to reconstruct and discover scenarios. In particular, it provides new methods to characterize and describe the complex wholeness of management problems, which cannot be achieved using the traditional quantitative and qualitative methods. Therefore, scenarios farming is selected as a new typical method to illustrate.
 
4.
Models must be built that represent the entirety of the managerial activities in mega infrastructure construction. The models must be of various complexities, and they must conceptualize, to some degree, the active entity and refine the essential property of the active entity at a theoretical level. This is the process of mega infrastructure construction management modeling. Based on the integration of current advanced modeling thinking, especially that based on information technology, and on the reflection of the complex wholeness of mega infrastructure construction, the new method of federation modeling is introduced.
 

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Footnotes
1
According to the calculation of per capita GDP data in dollars from 1990 to 2014.
 
Literature
go back to reference Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252.CrossRef Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252.CrossRef
go back to reference Baccarini, D. (1996). The concept of project complexity – A review. International Journal of Project Management, 14(4), 201–204.CrossRef Baccarini, D. (1996). The concept of project complexity – A review. International Journal of Project Management, 14(4), 201–204.CrossRef
go back to reference Banuls, V. A., Turoff, M., & Hiltz, S. R. (2013). Collaborative scenario modeling in emergency management through cross-impact. Technological Forecasting and Social Change, 80(9), 1756–1774.CrossRef Banuls, V. A., Turoff, M., & Hiltz, S. R. (2013). Collaborative scenario modeling in emergency management through cross-impact. Technological Forecasting and Social Change, 80(9), 1756–1774.CrossRef
go back to reference Baškarada, S. (2014). Qualitative case study guidelines. The Qualitative Report, 19(40), 1–25. Baškarada, S. (2014). Qualitative case study guidelines. The Qualitative Report, 19(40), 1–25.
go back to reference Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2011). Application areas and data requirements for BIM-enabled facilities management. Journal of Construction Engineering and Management, 138(3), 431–442. Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2011). Application areas and data requirements for BIM-enabled facilities management. Journal of Construction Engineering and Management, 138(3), 431–442.
go back to reference Beltratti, A., Consiglio, A., & Zenios, S. A. (1999). Scenario modeling for the management of international bond portfolios. Annals of Operations Research, 85, 227–247.CrossRef Beltratti, A., Consiglio, A., & Zenios, S. A. (1999). Scenario modeling for the management of international bond portfolios. Annals of Operations Research, 85, 227–247.CrossRef
go back to reference Bjørnholt, M., & Farstad, G. R. (2012). Am I rambling? On the advantages of interviewing couples together. Qualitative Research, 14(1), 3–19.CrossRef Bjørnholt, M., & Farstad, G. R. (2012). Am I rambling? On the advantages of interviewing couples together. Qualitative Research, 14(1), 3–19.CrossRef
go back to reference Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011a). Grasping project complexity in large engineering projects: The TOE (technical, organizational and environmental) framework. International Journal of Project Management, 29, 728–739.CrossRef Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011a). Grasping project complexity in large engineering projects: The TOE (technical, organizational and environmental) framework. International Journal of Project Management, 29, 728–739.CrossRef
go back to reference Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011b). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6), 728–739. Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011b). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6), 728–739.
go back to reference Brown, T., Beyeler, W., & Barton, D. (2004). Assessing infrastructure interdependencies: The challenge of risk analysis for complex adaptive systems. International Journal of Critical Infrastructures, 1(1), 108–117.CrossRef Brown, T., Beyeler, W., & Barton, D. (2004). Assessing infrastructure interdependencies: The challenge of risk analysis for complex adaptive systems. International Journal of Critical Infrastructures, 1(1), 108–117.CrossRef
go back to reference Cheng, X. (1996). Qualitative research method in social sciences in China. Social Sciences in China, 6, 94–106. Cheng, X. (1996). Qualitative research method in social sciences in China. Social Sciences in China, 6, 94–106.
go back to reference Creswell, J. W. (2003). Research design: Qualitative, quantitative, and mixed method approaches. Thousand Oaks, CA: Sage Publications. [请核对次文献]. Creswell, J. W. (2003). Research design: Qualitative, quantitative, and mixed method approaches. Thousand Oaks, CA: Sage Publications. [请核对次文献].
go back to reference Dahmann, J. S., Fujimoto, R. M., & Weatherly, R. M. (1997, December). The department of defense high level architecture. In Proceedings of the 29th conference on Winter simulation (pp. 142–149). IEEE Computer Society. Dahmann, J. S., Fujimoto, R. M., & Weatherly, R. M. (1997, December). The department of defense high level architecture. In Proceedings of the 29th conference on Winter simulation (pp. 142–149). IEEE Computer Society.
go back to reference Dahmann, J. S., Fujimoto, R. M., & Weatherly, R. M. (1998, December). The DoD high level architecture: an update. In Simulation Conference Proceedings (Vol. 1, pp. 797–804). IEEE. Dahmann, J. S., Fujimoto, R. M., & Weatherly, R. M. (1998, December). The DoD high level architecture: an update. In Simulation Conference Proceedings (Vol. 1, pp. 797–804). IEEE.
go back to reference Dai, Z. J., & Hou, C. Z. (2005). The development example of distributed interactive simulation system based on HLA. Systems Engineering-Theory & Practice, 1(1), 106–109. (Chinese). Dai, Z. J., & Hou, C. Z. (2005). The development example of distributed interactive simulation system based on HLA. Systems Engineering-Theory & Practice, 1(1), 106–109. (Chinese).
go back to reference Denzin, N. K., & Lincoln, Y. S. (2005). The sage handbook of qualitative research (3rd ed.). Thousand Oaks: Sage. Denzin, N. K., & Lincoln, Y. S. (2005). The sage handbook of qualitative research (3rd ed.). Thousand Oaks: Sage.
go back to reference Ducot, C., & Lubben, H. J. (1980). A typology for scenarios. Futures, 12(1), 15–57. Ducot, C., & Lubben, H. J. (1980). A typology for scenarios. Futures, 12(1), 15–57.
go back to reference Eastman, C. M. (1999). Building product models: Computer environments, supporting design and construction. Boca Raton: CRC Press. Eastman, C. M. (1999). Building product models: Computer environments, supporting design and construction. Boca Raton: CRC Press.
go back to reference Evans, J., Gideon, K., & Stephen, B. (2004). Beach time, bridge time and billable hours: The temporal structure of temporal contracting. Administrative Science Quarterly, 49, 1–38. Evans, J., Gideon, K., & Stephen, B. (2004). Beach time, bridge time and billable hours: The temporal structure of temporal contracting. Administrative Science Quarterly, 49, 1–38.
go back to reference Flyvbjerg, B., Mette, K., Skamris, H., & Soren, L. B. (2002). Underestimating cost in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295.CrossRef Flyvbjerg, B., Mette, K., Skamris, H., & Soren, L. B. (2002). Underestimating cost in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295.CrossRef
go back to reference Godet, M., & Roubelat, F. (1996). Creating the future: The use and misuse of scenarios. Long Range Planning, 29(2), 164–171.CrossRef Godet, M., & Roubelat, F. (1996). Creating the future: The use and misuse of scenarios. Long Range Planning, 29(2), 164–171.CrossRef
go back to reference Guba, E. G., & Lincoln, Y. S. (2005). Paradigmatic controversies, contradictions, and emerging influences. In The sage handbook of qualitative research (3rd ed., pp. 191–215). Thousand Oaks: Sage. Guba, E. G., & Lincoln, Y. S. (2005). Paradigmatic controversies, contradictions, and emerging influences. In The sage handbook of qualitative research (3rd ed., pp. 191–215). Thousand Oaks: Sage.
go back to reference Guo, J. L., Teng, J. Y., Wu, X. G., Cao, J., & Yan, Y. (2012). Study on the collaborative management technique of IPD construction project based on building information modeling. Construction Technology, 22, 75–79. (Chinese). Guo, J. L., Teng, J. Y., Wu, X. G., Cao, J., & Yan, Y. (2012). Study on the collaborative management technique of IPD construction project based on building information modeling. Construction Technology, 22, 75–79. (Chinese).
go back to reference He, Q. H., Qian, L. L., Duan, Y. F., & Li, Y. K. (2012). Current situation and barriers of BIM implementation. Journal of Engineering Management, 1, 12–16. He, Q. H., Qian, L. L., Duan, Y. F., & Li, Y. K. (2012). Current situation and barriers of BIM implementation. Journal of Engineering Management, 1, 12–16.
go back to reference He, Q., Luo, L., Hu, Y., & Chan, A. P. (2014). Measuring the complexity of mega infrastructure construction projects in China – A fuzzy analytic network process analysis. International Journal of Project Management. doi:10.1016/j.ijproman.2014.07.009. He, Q., Luo, L., Hu, Y., & Chan, A. P. (2014). Measuring the complexity of mega infrastructure construction projects in China – A fuzzy analytic network process analysis. International Journal of Project Management. doi:10.​1016/​j.​ijproman.​2014.​07.​009.
go back to reference Hu, X. X., & Minghui, R. (2012). The robust decision-making method for corporate strategic decision-making. Chinese Journal of Management Science, 20, 659–663. (in Chinese). Hu, X. X., & Minghui, R. (2012). The robust decision-making method for corporate strategic decision-making. Chinese Journal of Management Science, 20, 659–663. (in Chinese).
go back to reference Ishida, T. Q. (2002). A scenario description language for interactive agents. IEEE Computer, 35(11), 54–59.CrossRef Ishida, T. Q. (2002). A scenario description language for interactive agents. IEEE Computer, 35(11), 54–59.CrossRef
go back to reference Kahn, H., & Wiener, A. (1967). The year 2000. New York: MacMillan. Kahn, H., & Wiener, A. (1967). The year 2000. New York: MacMillan.
go back to reference Kuhl, F., Weatherly, R., & Dahmann, J. (1999). Creating computer simulation systems: An introduction to the high level architecture. Upper Saddle River: Prentice Hall PTR. Kuhl, F., Weatherly, R., & Dahmann, J. (1999). Creating computer simulation systems: An introduction to the high level architecture. Upper Saddle River: Prentice Hall PTR.
go back to reference Lai, F., & Wen, Y. (1997). Mathematical model and mathematical modeling. Beijing Normal University Publishing House. (Chinese). Lai, F., & Wen, Y. (1997). Mathematical model and mathematical modeling. Beijing Normal University Publishing House. (Chinese).
go back to reference Laiserin, J. (2002). Comparing pommes and naranjas. Laiserin, J. (2002). Comparing pommes and naranjas.
go back to reference Leifler, O., & Eriksson, H. (2012). Analysis tools in the study of distributed decision-making: A meta-study of command and control research. Cognition, Technology & Work, 14, 157–168.CrossRef Leifler, O., & Eriksson, H. (2012). Analysis tools in the study of distributed decision-making: A meta-study of command and control research. Cognition, Technology & Work, 14, 157–168.CrossRef
go back to reference Li, H., Guo, H. L., Huang, T., Chen, J. Y., & Chen, J. J. (2010). Research on the application architecture of BIM in building projects. Journal of Engineering Management, 24(5), 525–529. (Chinese). Li, H., Guo, H. L., Huang, T., Chen, J. Y., & Chen, J. J. (2010). Research on the application architecture of BIM in building projects. Journal of Engineering Management, 24(5), 525–529. (Chinese).
go back to reference Lin, X. Y. (2015). Revised analytic induction and constant comparative method: Approaches to qualitative research. Peking University Education Review, 13(1), 16–40. Lin, X. Y. (2015). Revised analytic induction and constant comparative method: Approaches to qualitative research. Peking University Education Review, 13(1), 16–40.
go back to reference Liu, Q., & Wang, J. P. (2010). The research on building lifecycle management based on the technology of BIM. Journal of Information Technology in Civil Engineering and Architecture, 3, 40–45. (Chinese). Liu, Q., & Wang, J. P. (2010). The research on building lifecycle management based on the technology of BIM. Journal of Information Technology in Civil Engineering and Architecture, 3, 40–45. (Chinese).
go back to reference Loseke, D. R., & Cahil, S. E. (2007). Publishing qualitative manuscripts: Lessons learned. In Qualitative research practice: Concise paperback edition (pp. 491–506). Los Angeles: Sage. Loseke, D. R., & Cahil, S. E. (2007). Publishing qualitative manuscripts: Lessons learned. In Qualitative research practice: Concise paperback edition (pp. 491–506). Los Angeles: Sage.
go back to reference Ma, Z. L., Zhang, D. D., & Ma, J. K. (2014). BIM-based collaborative work model and information utilization framework for IPD the projects. Journal of Tong Ji University (Natural Science), 42(9), 1325–1332. (Chinese). Ma, Z. L., Zhang, D. D., & Ma, J. K. (2014). BIM-based collaborative work model and information utilization framework for IPD the projects. Journal of Tong Ji University (Natural Science), 42(9), 1325–1332. (Chinese).
go back to reference Mahoney, J., & Goertz, G. (2006). A tale of two cultures: Contrasting quantitative and qualitative research. Political Analysis, 14, 227–249.CrossRef Mahoney, J., & Goertz, G. (2006). A tale of two cultures: Contrasting quantitative and qualitative research. Political Analysis, 14, 227–249.CrossRef
go back to reference Major, B., Mendes, W. B., & Dovidio, J. F. (2013). Intergroup relations and health disparities: A social psychological perspective. Health Psychology, 32(5), 514–524.CrossRef Major, B., Mendes, W. B., & Dovidio, J. F. (2013). Intergroup relations and health disparities: A social psychological perspective. Health Psychology, 32(5), 514–524.CrossRef
go back to reference Mannay, D. (2010). Making the familiar strange: Can visual research methods render the familiar setting more perceptible? Qualitative Research, 10(1), 91–111.CrossRef Mannay, D. (2010). Making the familiar strange: Can visual research methods render the familiar setting more perceptible? Qualitative Research, 10(1), 91–111.CrossRef
go back to reference Masera, M., & Wilkens, M. (2001). Interdependencies with the information infrastructure: dependability and complexity issues. The Fifth International Conference on Technology, Policy and Innovation, Netherlands. Masera, M., & Wilkens, M. (2001). Interdependencies with the information infrastructure: dependability and complexity issues. The Fifth International Conference on Technology, Policy and Innovation, Netherlands.
go back to reference Morning, A. (2008). Reconstructing race in science and society: Biology textbooks. American Journal of Sociology, 1952–2002. Morning, A. (2008). Reconstructing race in science and society: Biology textbooks. American Journal of Sociology, 1952–2002.
go back to reference Rhodes, M. L., Murphy, J., & Muir, J. (2010). Public management and complexity theory: Richer decision-making in public service. London: Routledge. Rhodes, M. L., Murphy, J., & Muir, J. (2010). Public management and complexity theory: Richer decision-making in public service. London: Routledge.
go back to reference Ringland, G. (1998). Scenario planning: Managing for the future. New York: John Wiley. Ringland, G. (1998). Scenario planning: Managing for the future. New York: John Wiley.
go back to reference Robinson, J. (2002). Personal communication. 25 July, 2002. Robinson, J. (2002). Personal communication. 25 July, 2002.
go back to reference Sarjoughian, H., & Zeigler, B. P. (2000). DEVS and HLA. Transaction of the Society for Computer Simulation, 17(4), 187–197. Sarjoughian, H., & Zeigler, B. P. (2000). DEVS and HLA. Transaction of the Society for Computer Simulation, 17(4), 187–197.
go back to reference Schwartz, P. (1991). The art of the long view: Planning for the future in an uncertain world. New York: Currency Doubleday. Schwartz, P. (1991). The art of the long view: Planning for the future in an uncertain world. New York: Currency Doubleday.
go back to reference Sheng, Z. H., You, Z. Q., Chen, S. P., & Yao, B. (2009). Sutong bridge engineering system analysis and management system. Beijing: Science Press. Sheng, Z. H., You, Z. Q., Chen, S. P., & Yao, B. (2009). Sutong bridge engineering system analysis and management system. Beijing: Science Press.
go back to reference Shi, Y. (2013). Qualitative research method and Chinese sociology. The Journal of Humanities, 4, 101–107. Shi, Y. (2013). Qualitative research method and Chinese sociology. The Journal of Humanities, 4, 101–107.
go back to reference Strang, T., & Linnhoff-Popien, C. (2004, September). A context modeling survey. In Workshop Proceedings. Strang, T., & Linnhoff-Popien, C. (2004, September). A context modeling survey. In Workshop Proceedings.
go back to reference Tan, Y. J., Cai, Z. J., & Yu, W. (2005). The mathematical model. Shanghai: Fudan University Press. Tan, Y. J., Cai, Z. J., & Yu, W. (2005). The mathematical model. Shanghai: Fudan University Press.
go back to reference Tian, G., Liu, Y., Wang, Y., & F. (2015). Exploring new pathway of management: Qualitative research methods in business anthropology. Chinese Journal of Management, 12(1), 1–10. Tian, G., Liu, Y., Wang, Y., & F. (2015). Exploring new pathway of management: Qualitative research methods in business anthropology. Chinese Journal of Management, 12(1), 1–10.
go back to reference Van der Heijden, K. (1996). Scenarios: The art of strategic conversation. Chichester: Wiley. Van der Heijden, K. (1996). Scenarios: The art of strategic conversation. Chichester: Wiley.
go back to reference Van Notten, P., & Rotmans, J. (2001). The future of scenarios. Scenario and Strategy Planning, 1(3), 4–8. Van Notten, P., & Rotmans, J. (2001). The future of scenarios. Scenario and Strategy Planning, 1(3), 4–8.
go back to reference Wang, F. W. (2015). Generalization strategies of qualitative research. Peking University Education Review, 13(1), 40–78. Wang, F. W. (2015). Generalization strategies of qualitative research. Peking University Education Review, 13(1), 40–78.
go back to reference Wang, X. H., Zhang, D. Q., Gu, T., & Pung, H. K. (2004, March). Ontology based context modeling and reasoning using OWL. In Pervasive Computing and Communications Workshops, 2004. Proceedings of the Second IEEE Annual Conference on (pp. 18–22). IEEE. Wang, X. H., Zhang, D. Q., Gu, T., & Pung, H. K. (2004, March). Ontology based context modeling and reasoning using OWL. In Pervasive Computing and Communications Workshops, 2004. Proceedings of the Second IEEE Annual Conference on (pp. 18–22). IEEE.
go back to reference Weinan, E. (2011). Principles of multiscale modeling. Cambridge: Cambridge University Press. Weinan, E. (2011). Principles of multiscale modeling. Cambridge: Cambridge University Press.
go back to reference Weinan, E., & Engquist, B. (2003). Multiscale modeling and computation. Notices of the AMS, 50(9), 1062–1070. Weinan, E., & Engquist, B. (2003). Multiscale modeling and computation. Notices of the AMS, 50(9), 1062–1070.
go back to reference Werner, R. (2008). Innovations in the planning of mega-projects, decision making on mega-projects. Cheltenham/Northampton: Edward Elgar Publishing. Werner, R. (2008). Innovations in the planning of mega-projects, decision making on mega-projects. Cheltenham/Northampton: Edward Elgar Publishing.
go back to reference Wilcox, P. A., Burger, A. G., & Hoare, P. (2000). Advanced distributed simulation: A review of developments and their implication for data collection and analysis. Simulation Practice and Theory, 8(3), 201–231.CrossRef Wilcox, P. A., Burger, A. G., & Hoare, P. (2000). Advanced distributed simulation: A review of developments and their implication for data collection and analysis. Simulation Practice and Theory, 8(3), 201–231.CrossRef
go back to reference Willemsen, P. J. (2000). Behavior and scenario modeling for real-time virtual environments. Doctoral dissertation: The University of Iowa. Willemsen, P. J. (2000). Behavior and scenario modeling for real-time virtual environments. Doctoral dissertation: The University of Iowa.
go back to reference Williams, T. M. (1999). The need for new paradigms for complex projects. International Journal of Project Management, 17(5), 269–273.CrossRef Williams, T. M. (1999). The need for new paradigms for complex projects. International Journal of Project Management, 17(5), 269–273.CrossRef
go back to reference Xia, W., & Lee, G. (2004). Grasping the complexity of IS development projects. Communications of the ACM, 47(5), 68–74.CrossRef Xia, W., & Lee, G. (2004). Grasping the complexity of IS development projects. Communications of the ACM, 47(5), 68–74.CrossRef
go back to reference Xu, Y. X., Wang, Y. W., & Yao, B. (2010). Study on the construction project IPD collaborative management based on building information model. China Civil Engineering Journal, 44(12), 138–143. (Chinese). Xu, Y. X., Wang, Y. W., & Yao, B. (2010). Study on the construction project IPD collaborative management based on building information model. China Civil Engineering Journal, 44(12), 138–143. (Chinese).
go back to reference Yang, L. H. (2003). Enterprise: The contract organization which produces products traded independently. Social Sciences in Xinjiang, 3, 18–27. (in Chinese). Yang, L. H. (2003). Enterprise: The contract organization which produces products traded independently. Social Sciences in Xinjiang, 3, 18–27. (in Chinese).
go back to reference Zhang, R. Y., Wang, J. (2012). The implication of building information modeling (BIM). Industrial Building, S1:34–36 + 43. (Chinese). Zhang, R. Y., Wang, J. (2012). The implication of building information modeling (BIM). Industrial Building, S1:34–36 + 43. (Chinese).
go back to reference Zhang, H., Wang, H., Chen, D., & Zacharewicz, G. (2010). A model-driven approach to multidisciplinary collaborative simulation for virtual product development. Advanced Engineering Informatics, 24(2), 167–179.CrossRef Zhang, H., Wang, H., Chen, D., & Zacharewicz, G. (2010). A model-driven approach to multidisciplinary collaborative simulation for virtual product development. Advanced Engineering Informatics, 24(2), 167–179.CrossRef
go back to reference Zhang, J. P., Li, D., Lin, J. R., & Yan, G. W. (2012). Application of BIM in engineering construction. Construction Technology, 371(41), 10–17. (Chinese). Zhang, J. P., Li, D., Lin, J. R., & Yan, G. W. (2012). Application of BIM in engineering construction. Construction Technology, 371(41), 10–17. (Chinese).
go back to reference Zhong, Q. Y., Guo, Y. M., Wang, N., Xue, H. F., Cui, L., & Wang, Y. Z. (2012). Research on unconventional emergency scenario model based on knowledge element. Information Science, 1, 024. Zhong, Q. Y., Guo, Y. M., Wang, N., Xue, H. F., Cui, L., & Wang, Y. Z. (2012). Research on unconventional emergency scenario model based on knowledge element. Information Science, 1, 024.
Metadata
Title
Specialized Methods in the Research of Mega Infrastructure Construction Management
Author
Zhaohan Sheng
Copyright Year
2018
DOI
https://doi.org/10.1007/978-3-319-61974-3_9