Skip to main content
Top

2025 | OriginalPaper | Chapter

System Theoretic Process Analysis (STPA) on Assessing Risks of Shield Tunneling Undercrossing Railway Subgrade

Authors : Guankai Wang, Yao Shan, Chengyu Liu

Published in: Proceedings of the 5th International Conference on Transportation Geotechnics (ICTG) 2024, Volume 2

Publisher: Springer Nature Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The excavation process of shield tunnel involves many unsafe actions, which inevitably affect the safety of existing railway subgrades. Traditional safety analysis methods, such as Fault Tree Analysis (FTA), mainly assume that the probabilities of different factors are independent and it can’t fully consider accidents caused by the interaction among these factors. In order to effectively assess the safety risk of shield tunnel under existing railways, this study applies the Systems-Theoretic Process Analysis (STPA) method to shield tunneling projects under existing railway subgrade. The safety issues in shield tunneling project under existing railways are treated as control problems. Taking an actual project as an example, the unsafe control actions during the construction process are identified, and the causal factors leading to these unsafe control actions are analyzed. Finally, a numerical simulation model of shield tunneling undercrossing existing railways is established to conduct a quantitative safety analysis of typical unsafe control actions. The results indicate that the STPA method can effectively analyze the safety of shield tunneling undercrossing existing railways and reveal risks that traditional methods may not discover.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Gong CJ, Xie CR, Lin ZQ, Xie DW, Zhou Z (2023) Ground deformation prediction induced by shield tunnelling considering existing multi-story buildings. J Cent South Univ 30(4):1373–1387CrossRef Gong CJ, Xie CR, Lin ZQ, Xie DW, Zhou Z (2023) Ground deformation prediction induced by shield tunnelling considering existing multi-story buildings. J Cent South Univ 30(4):1373–1387CrossRef
2.
go back to reference Hamidi JK, Shahriar K, Rezai B, Rostami J, Bejari H (2010) Risk assessment based selection of rock TBM for adverse geological conditions using fuzzy-AHP. Bull Eng Geol Env 69(4):523–532CrossRef Hamidi JK, Shahriar K, Rezai B, Rostami J, Bejari H (2010) Risk assessment based selection of rock TBM for adverse geological conditions using fuzzy-AHP. Bull Eng Geol Env 69(4):523–532CrossRef
3.
go back to reference Li K, Xiahou X, Huang H, Tang LY, Huang J, Li QM, Feng P (2022) AHP-FSE-based risk assessment and mitigation for slurry balancing shield tunnel construction. J Environ Public Health 2022:1666950CrossRef Li K, Xiahou X, Huang H, Tang LY, Huang J, Li QM, Feng P (2022) AHP-FSE-based risk assessment and mitigation for slurry balancing shield tunnel construction. J Environ Public Health 2022:1666950CrossRef
4.
go back to reference Hyun KC, Min S, Park J, Lee IM (2015) Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels. Tunn Undergr Space Technol 49:121–129CrossRef Hyun KC, Min S, Park J, Lee IM (2015) Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels. Tunn Undergr Space Technol 49:121–129CrossRef
5.
go back to reference Leveson NG (2004) A new accident model for engineering safer systems. Saf Sci 42(4):237–270CrossRef Leveson NG (2004) A new accident model for engineering safer systems. Saf Sci 42(4):237–270CrossRef
6.
go back to reference Leveson NG (2015) A systems approach to risk management through leading safety indicators. Reliab Eng Syst Saf 136:17–34CrossRef Leveson NG (2015) A systems approach to risk management through leading safety indicators. Reliab Eng Syst Saf 136:17–34CrossRef
7.
go back to reference Leveson NG, Thomas JP (2018) STPA handbook. Massachusetts Institute of Technology Leveson NG, Thomas JP (2018) STPA handbook. Massachusetts Institute of Technology
8.
go back to reference Yousefi A, Hernandez MR (2019) Using a system theory based method (STAMP) for hazard analysis in process industry. J Loss Prev Process Ind 61:305–324CrossRef Yousefi A, Hernandez MR (2019) Using a system theory based method (STAMP) for hazard analysis in process industry. J Loss Prev Process Ind 61:305–324CrossRef
9.
go back to reference Castilho DS, Urbina LMS, de Andrade D (2018) STPA for continuous controls: a flight testing study of aircraft crosswind takeoffs. Saf Sci 108:129–139CrossRef Castilho DS, Urbina LMS, de Andrade D (2018) STPA for continuous controls: a flight testing study of aircraft crosswind takeoffs. Saf Sci 108:129–139CrossRef
10.
go back to reference Ishimatsu T, Leveson NG, Thomas JP, Fleming CH, Katahira M, Miyamoto Y, Ujiie R, Nakao H, Hoshino N (2014) Hazard analysis of complex spacecraft using systems-theoretic process analysis. J Spacecr Rocket 51(2):509–522CrossRef Ishimatsu T, Leveson NG, Thomas JP, Fleming CH, Katahira M, Miyamoto Y, Ujiie R, Nakao H, Hoshino N (2014) Hazard analysis of complex spacecraft using systems-theoretic process analysis. J Spacecr Rocket 51(2):509–522CrossRef
11.
go back to reference Zhang YD, Wang S, Li Y, Guo J, Li KH (2021) Hazard analysis and simulation verification method of train control operation scenarios based on STPA and multi-agent. China Railway Sci 42(1):147–155 (in Chinese) Zhang YD, Wang S, Li Y, Guo J, Li KH (2021) Hazard analysis and simulation verification method of train control operation scenarios based on STPA and multi-agent. China Railway Sci 42(1):147–155 (in Chinese)
12.
go back to reference Wu HT, Li SX (2021) High-speed railway emergency dispatching safety analysis based on STAMP/STPA. China Saf Sci J 31(6):113–120 (in Chinese) Wu HT, Li SX (2021) High-speed railway emergency dispatching safety analysis based on STAMP/STPA. China Saf Sci J 31(6):113–120 (in Chinese)
13.
go back to reference Wu XG, Liu X, Chen HY, Zeng TM, Wang JF, Tao WT (2021) Preassessment of safety risk of shield tunneling underneath existing tunnel based on fuzzy Bayesian networks and evidence theory. Tunnel Constr 41(5):713 (in Chinese) Wu XG, Liu X, Chen HY, Zeng TM, Wang JF, Tao WT (2021) Preassessment of safety risk of shield tunneling underneath existing tunnel based on fuzzy Bayesian networks and evidence theory. Tunnel Constr 41(5):713 (in Chinese)
14.
go back to reference Wang HD, Guan LH (2021) Risk assessment of shield tunneling under existing railway based on rough set and set pair analysis theory. J Liaoning Tech Uni (Nat Sci) 40(5):383–389 (in Chinese) Wang HD, Guan LH (2021) Risk assessment of shield tunneling under existing railway based on rough set and set pair analysis theory. J Liaoning Tech Uni (Nat Sci) 40(5):383–389 (in Chinese)
15.
go back to reference Guo DS, Song ZP, Xu T, Zhang YW, Ding LB (2022) Coupling analysis of tunnel construction risk in complex geology and construction factors. J Constr Eng Manag 148(9):04022097CrossRef Guo DS, Song ZP, Xu T, Zhang YW, Ding LB (2022) Coupling analysis of tunnel construction risk in complex geology and construction factors. J Constr Eng Manag 148(9):04022097CrossRef
16.
go back to reference Zhang MY, Yu DM, Wang TY, Xu C (2023) Coupling analysis of tunnel construction safety risks based on N-K model and SD causality diagram. Buildings 13(4):1081CrossRef Zhang MY, Yu DM, Wang TY, Xu C (2023) Coupling analysis of tunnel construction safety risks based on N-K model and SD causality diagram. Buildings 13(4):1081CrossRef
17.
go back to reference You Q, Zhang ZW, Wang HT, Xu MY (2023) Risk identification of subway tunnel shield construction based on WBS-RBS method. Int J Crit Infrastruct 19(3):261–273CrossRef You Q, Zhang ZW, Wang HT, Xu MY (2023) Risk identification of subway tunnel shield construction based on WBS-RBS method. Int J Crit Infrastruct 19(3):261–273CrossRef
Metadata
Title
System Theoretic Process Analysis (STPA) on Assessing Risks of Shield Tunneling Undercrossing Railway Subgrade
Authors
Guankai Wang
Yao Shan
Chengyu Liu
Copyright Year
2025
Publisher
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-97-8217-8_26