Skip to main content
Top

2024 | OriginalPaper | Chapter

The Identical Parallel Machine Scheduling Problem with Setups and Additional Resources

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper studies a real world dedicated parallel machine scheduling problem with sequence dependent setups, different machine release dates and additional resources (PMSR). To solve this problem, two previously proposed models have been adapted and a novel objective function, the minimisation of the sum of the machine completion times, is proposed to reflect the real conditions of the manufacturing environment that motivates this work. One model follows the strip-packing approach and the other is time-indexed. The solutions obtained show that the new objective function provides a compact production schedule that allows the simultaneous minimisation of machine idle times and setup times. In conclusion, this study provides valuable insights into the effectiveness of different models for solving PMSR problems in real-world contexts and gives directions for future research in this area using complementary approaches such as matheuristics.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Blazewicz, J., Lenstra, J.K., Kan, A.R.: Scheduling subject to resource constraints: classification and complexity. Discret. Appl. Math. 5, 11–24 (1983)MathSciNetCrossRef Blazewicz, J., Lenstra, J.K., Kan, A.R.: Scheduling subject to resource constraints: classification and complexity. Discret. Appl. Math. 5, 11–24 (1983)MathSciNetCrossRef
3.
go back to reference Ventura, J.A., Kim, D.: Parallel machine scheduling about an unrestricted due date and additional resource constraints. IIE Trans. 32, 147–153 (2000)CrossRef Ventura, J.A., Kim, D.: Parallel machine scheduling about an unrestricted due date and additional resource constraints. IIE Trans. 32, 147–153 (2000)CrossRef
4.
go back to reference Akyol Ozer, E., Sarac, T.: MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints. TOP 27, 94–124 (2019)MathSciNetCrossRef Akyol Ozer, E., Sarac, T.: MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints. TOP 27, 94–124 (2019)MathSciNetCrossRef
5.
go back to reference Bektur, G., Saraç, T.: A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server. Comput. Oper. Res. 103, 46–63 (2019)MathSciNetCrossRef Bektur, G., Saraç, T.: A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server. Comput. Oper. Res. 103, 46–63 (2019)MathSciNetCrossRef
6.
go back to reference Pinheiro, J.C., Arroyo, J.E.C., Fialho, L.B.: Scheduling unrelated parallel machines with family setups and resource constraints to minimize total tardiness. In: Proceedings of the 2020 Genetic and Evolutionary Computation Conference Companion, pp. 1409–1417 (2020) Pinheiro, J.C., Arroyo, J.E.C., Fialho, L.B.: Scheduling unrelated parallel machines with family setups and resource constraints to minimize total tardiness. In: Proceedings of the 2020 Genetic and Evolutionary Computation Conference Companion, pp. 1409–1417 (2020)
7.
go back to reference Fanjul-Peyro, L.: Models and an exact method for the unrelated parallel machine scheduling problem with setups and resources. Expert Syst. Appl. 5, 100022 (2020) Fanjul-Peyro, L.: Models and an exact method for the unrelated parallel machine scheduling problem with setups and resources. Expert Syst. Appl. 5, 100022 (2020)
8.
go back to reference Yepes-Borrero, J.C., Villa, F., Perea, F., Caballero-Villalobos, J.P.: GRASP algorithm for the unrelated parallel machine scheduling problem with setup times and additional resources. Expert Syst. Appl. 141, 112959 (2020)CrossRef Yepes-Borrero, J.C., Villa, F., Perea, F., Caballero-Villalobos, J.P.: GRASP algorithm for the unrelated parallel machine scheduling problem with setup times and additional resources. Expert Syst. Appl. 141, 112959 (2020)CrossRef
9.
go back to reference Yepes-Borrero, J.C., Perea, F., Ruiz, R., Villa, F.: Bi-objective parallel machine scheduling with additional resources during setups. Eur. J. Oper. Res. 292, 443–455 (2021)MathSciNetCrossRef Yepes-Borrero, J.C., Perea, F., Ruiz, R., Villa, F.: Bi-objective parallel machine scheduling with additional resources during setups. Eur. J. Oper. Res. 292, 443–455 (2021)MathSciNetCrossRef
10.
go back to reference Zhang, L., Deng, Q., Lin, R., Gong, G., Han, W.: A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect. Expert Syst. Appl. 175, 114843 (2021)CrossRef Zhang, L., Deng, Q., Lin, R., Gong, G., Han, W.: A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect. Expert Syst. Appl. 175, 114843 (2021)CrossRef
11.
go back to reference Lopez-Esteve, A., Perea, F., Yepes-Borrero, J.C.: GRASP algorithms for the unrelated parallel machines scheduling problem with additional resources during processing and setups. Int. J. Prod. Res. 1–17 (2022) Lopez-Esteve, A., Perea, F., Yepes-Borrero, J.C.: GRASP algorithms for the unrelated parallel machines scheduling problem with additional resources during processing and setups. Int. J. Prod. Res. 1–17 (2022)
12.
go back to reference Yunusoglu, P., Topaloglu Yildiz, S.: Constraint programming approach for multi-resource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times. Int. J. Prod. Res. 60, 2212–2229 (2022)CrossRef Yunusoglu, P., Topaloglu Yildiz, S.: Constraint programming approach for multi-resource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times. Int. J. Prod. Res. 60, 2212–2229 (2022)CrossRef
13.
go back to reference Afzalirad, M., Rezaeian, J.: Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions. Comput. Ind. Eng. 98, 40–52 (2016)CrossRef Afzalirad, M., Rezaeian, J.: Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions. Comput. Ind. Eng. 98, 40–52 (2016)CrossRef
Metadata
Title
The Identical Parallel Machine Scheduling Problem with Setups and Additional Resources
Authors
Ângelo Soares
Ana Rita Ferreira
Manuel Pereira Lopes
Copyright Year
2024
DOI
https://doi.org/10.1007/978-3-031-38165-2_34

Premium Partner