Skip to main content
Top
Published in: Cluster Computing 2/2019

10-03-2018

The improved AFSA algorithm for the berth allocation and quay crane assignment problem

Authors: Yi Liu, Jian Wang, Sabina Shahbazzade

Published in: Cluster Computing | Special Issue 2/2019

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In the practical situation, the QC setup time cannot be negligible in the decision making process due to the QC speed limitations of shifting along the quay. This paper established the deterministic model of the berth allocation and quay crane assignment problem considered the QC setup time of shifting along the quay. This paper proposed the artificial fish swarm algorithm (AFSA) with the heuristic adjusted strategies to optimize the priority list of vessels served and allocate the QC numbers. The experiment results show the improved AFSA algorithm has more efficiency and competitive quality of solution than the CPLEX.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Park, Y.M., Kim, K.H.: A scheduling method for berth and quay cranes. OR Spectr. Quant. Approaches Manag. 25, 1–23 (2003) Park, Y.M., Kim, K.H.: A scheduling method for berth and quay cranes. OR Spectr. Quant. Approaches Manag. 25, 1–23 (2003)
2.
go back to reference Imai, A., Nishimura, E., Papadimitriou, S., et al.: The simultaneous berth and quay crane allocation problem. Transp. Res. Part E 44, 900–920 (2008) Imai, A., Nishimura, E., Papadimitriou, S., et al.: The simultaneous berth and quay crane allocation problem. Transp. Res. Part E 44, 900–920 (2008)
3.
go back to reference Meisel, F., Bierwirth, C.: Heuristics for the integration of crane productivity in the berth allocation problem. Transp. Res. Part E Logist. Transp. Rev. 45, 196–209 (2009) Meisel, F., Bierwirth, C.: Heuristics for the integration of crane productivity in the berth allocation problem. Transp. Res. Part E Logist. Transp. Rev. 45, 196–209 (2009)
4.
go back to reference Lee, D.H., Wang, H.Q.: Integrated discrete berth allocation and quay crane scheduling in port container terminals. Eng. Optim. 42, 747–761 (2010) Lee, D.H., Wang, H.Q.: Integrated discrete berth allocation and quay crane scheduling in port container terminals. Eng. Optim. 42, 747–761 (2010)
5.
go back to reference Yang, C.X., Wang, X.J., Li, Z.F.: An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal. Comput. Ind. Eng. 63, 243–253 (2012) Yang, C.X., Wang, X.J., Li, Z.F.: An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal. Comput. Ind. Eng. 63, 243–253 (2012)
6.
go back to reference Liang, X.L, Li, W.F., Zhao, W., et al.: Multistage collaborative scheduling of berth and quay crane based on heuristic strategies and particle swarm optimistic algorithm. In: 2012 IEEE 16th International Conference on Computer Supported Cooperative Work in Design, China, pp. 913–918 (2012) Liang, X.L, Li, W.F., Zhao, W., et al.: Multistage collaborative scheduling of berth and quay crane based on heuristic strategies and particle swarm optimistic algorithm. In: 2012 IEEE 16th International Conference on Computer Supported Cooperative Work in Design, China, pp. 913–918 (2012)
7.
go back to reference Turkogullari, Y.B., Taskin, Z.C., Aras, N., Altinel, I.K.: Optimal berth allocation and time-invariant quay crane assignment in container terminals. Eur. J. Oper. Res. 235, 88–101 (2014) Turkogullari, Y.B., Taskin, Z.C., Aras, N., Altinel, I.K.: Optimal berth allocation and time-invariant quay crane assignment in container terminals. Eur. J. Oper. Res. 235, 88–101 (2014)
8.
go back to reference Iris, C., Pacino, D., Ropke, S., Larsen, A.: Integrated berth allocation and quay crane assignment problem: set partitioning models and computational results. Transp. Res. Part E 81, 75–97 (2015) Iris, C., Pacino, D., Ropke, S., Larsen, A.: Integrated berth allocation and quay crane assignment problem: set partitioning models and computational results. Transp. Res. Part E 81, 75–97 (2015)
9.
go back to reference Li, X.L.: A new intelligent optimization algorithm: artificial fish school algorithm. Zhejiang University, Hang Zhou (2003) Li, X.L.: A new intelligent optimization algorithm: artificial fish school algorithm. Zhejiang University, Hang Zhou (2003)
10.
go back to reference Liu, Y.: Improved artificial fish swarm algorithm for vehicle routing problem with backhaul and fuzzy demand. Patt. Recog. Artif. Intell. 23, 560–564 (2010) Liu, Y.: Improved artificial fish swarm algorithm for vehicle routing problem with backhaul and fuzzy demand. Patt. Recog. Artif. Intell. 23, 560–564 (2010)
11.
go back to reference Han, X., Lu, Z., Xi, L.: A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time. Eur. J. Oper. Res. 207, 1327–1340 (2010) Han, X., Lu, Z., Xi, L.: A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time. Eur. J. Oper. Res. 207, 1327–1340 (2010)
12.
go back to reference Zhang, Z.Y., Lu, Z., Han, X.L.: Robust integrated scheduling for berth and quay crane based on proactive-reactive method. Comput. Integr. Manuf. Syst. 20, 1181–1190 (2014) Zhang, Z.Y., Lu, Z., Han, X.L.: Robust integrated scheduling for berth and quay crane based on proactive-reactive method. Comput. Integr. Manuf. Syst. 20, 1181–1190 (2014)
Metadata
Title
The improved AFSA algorithm for the berth allocation and quay crane assignment problem
Authors
Yi Liu
Jian Wang
Sabina Shahbazzade
Publication date
10-03-2018
Publisher
Springer US
Published in
Cluster Computing / Issue Special Issue 2/2019
Print ISSN: 1386-7857
Electronic ISSN: 1573-7543
DOI
https://doi.org/10.1007/s10586-018-2216-x

Other articles of this Special Issue 2/2019

Cluster Computing 2/2019 Go to the issue

Premium Partner