Skip to main content
Top

2021 | OriginalPaper | Chapter

10. The Operation of BF Blowing on (in)

Author : Yuncai Liu

Published in: The Operation of Contemporary Blast Furnaces

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The main target of blowing on (BF on steam/BF starting up) is safe and smooth. Usually, some equipment faulty would happen in the blow-in process, but less human injury. A lot of BFs started up in China frequently to accumulate rich experience to operate smoothly and realize the designed standard very soon. It was indicated that irregular situation generally came from less preparing, not enough burden, wrong operating, especially unqualified united test run for facilities.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference G. Li, The Formation and Development of Iron-making Technology in An Steel (Metallurgical Industry Press, Beijing, 1998), pp. 387–391 G. Li, The Formation and Development of Iron-making Technology in An Steel (Metallurgical Industry Press, Beijing, 1998), pp. 387–391
2.
go back to reference S. Ma, Capital Steel Sci. Technol. Inf. 6, 24–36 (1973) S. Ma, Capital Steel Sci. Technol. Inf. 6, 24–36 (1973)
3.
go back to reference X. Guo, H. Yu, S. Gu et al., Innovative practice of full-focus boiler opening in Anyang Steel 2000 m3 grade blast furnace. Iron-Making 3, 17–20 (2011) X. Guo, H. Yu, S. Gu et al., Innovative practice of full-focus boiler opening in Anyang Steel 2000 m3 grade blast furnace. Iron-Making 3, 17–20 (2011)
4.
go back to reference C. Guan, G. Liu, Y. Mo, et al., Innovative practice of full-focus boiler opening in Xin Steel No. 6 blast furnace. Iron-Making 2, 28–30 (2010) C. Guan, G. Liu, Y. Mo, et al., Innovative practice of full-focus boiler opening in Xin Steel No. 6 blast furnace. Iron-Making 2, 28–30 (2010)
5.
go back to reference Q. Tang, Problems worthy of attention in the operation of newly built blast furnace, in Compilation of Materials for the Expert Committee of Blast Furnace Production Technology (2013), pp. 40–45 Q. Tang, Problems worthy of attention in the operation of newly built blast furnace, in Compilation of Materials for the Expert Committee of Blast Furnace Production Technology (2013), pp. 40–45
6.
go back to reference B.B. Kaserolin, Some problems in the blast furnace opening process. Foreign Iron-making Steel-Making 3, 11–14 (1990) B.B. Kaserolin, Some problems in the blast furnace opening process. Foreign Iron-making Steel-Making 3, 11–14 (1990)
7.
go back to reference T. Wang, W. Zhang, L. Ren, et al., Practice on startup of No. 1 blast furnace of Capital Steel Jingtang Joint Co., Ltd. Iron-Making 2, 7–10 (2012) T. Wang, W. Zhang, L. Ren, et al., Practice on startup of No. 1 blast furnace of Capital Steel Jingtang Joint Co., Ltd. Iron-Making 2, 7–10 (2012)
8.
go back to reference H. Zhang, S. Sheng, H. Ma, Practice on startup of No. 2 blast furnace of Capital Steel. Iron-Making, 2, 1 (2009) H. Zhang, S. Sheng, H. Ma, Practice on startup of No. 2 blast furnace of Capital Steel. Iron-Making, 2, 1 (2009)
9.
go back to reference Z. Zhang, D. Zhang, L. Dong et al., Practices of achieving target output in 3200 m3 blast furnace of Ji Steel. Iron-Making 1, 16–19 (2011) Z. Zhang, D. Zhang, L. Dong et al., Practices of achieving target output in 3200 m3 blast furnace of Ji Steel. Iron-Making 1, 16–19 (2011)
Metadata
Title
The Operation of BF Blowing on (in)
Author
Yuncai Liu
Copyright Year
2021
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-15-7074-2_10

Premium Partners