Skip to main content
Top

2015 | OriginalPaper | Chapter

The Role of Life Cycle Cost in Engineering Asset Management

Authors : Khaled El-Akruti, Richard Dwight, Tieling Zhang, Mujbil Al-Marsumi

Published in: Engineering Asset Management - Systems, Professional Practices and Certification

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper presents a case study demonstrating life cycle cost (LCC) analysis as a major and critical activity of engineering asset management decisions and control. The objective is to develop a maintenance policy to control the economics of replacement and repair practice of refractory lining of an electric arc furnace (EAF). The replacement and repair policies involve the optimum life policy, the repair versus replacement policies, the repair limit method and the comparison of lining material types from different suppliers. The developed models provide a method for defining the most important factors involved in decision making with respect to operational and managerial levels. The approach also involves deciding the remaining age value as the repair limit criteria while avoid lining failure due to unavoidable deterioration caused by variation in operation conditions. The decision criteria are established as: (a) what type of lining material is better to use? (b) When to replace lining in a cyclic manner? (c) At what sequence is hot repair required and (d) whether to replace or use cold repair between replacements. Finally, the model output values for the decision criteria are presented in tables and graphs to guide decision making in operation and maintenance.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Amelsberg J (2002) Systemic performance and cost management. American Society for Quality, Denver Amelsberg J (2002) Systemic performance and cost management. American Society for Quality, Denver
2.
go back to reference Asset Management Council (2009) Asset management. Asset Management Council and MESA Newsletter, April–May, p 4 Asset Management Council (2009) Asset management. Asset Management Council and MESA Newsletter, April–May, p 4
3.
go back to reference Barringer P (1998) Life cycle costs and good practices. In: NPRA maintenance conference, San Antonio, Texas, 19–22 May 1998 Barringer P (1998) Life cycle costs and good practices. In: NPRA maintenance conference, San Antonio, Texas, 19–22 May 1998
4.
go back to reference Blanchard BS, Fabryky (2011) Systems engineering and analysis. Prentice Hall, Englewood Cliffs, p 585 Blanchard BS, Fabryky (2011) Systems engineering and analysis. Prentice Hall, Englewood Cliffs, p 585
5.
go back to reference Buys A, Bendewald M, Tupper K (2011) Life cycle cost analysis: is it worth the effort? ASHRAE Trans 117(1):541–548 Buys A, Bendewald M, Tupper K (2011) Life cycle cost analysis: is it worth the effort? ASHRAE Trans 117(1):541–548
6.
go back to reference Castella PS, Blanc I, Ferrer MG, Ecabert B, Wakeman M, Manson J-A, Emery D, Han SH, Hong J, Jolliet O (2009) Integrating life cycle costs and environmental impacts of composite rail car-bodies for a Korean train. Int J Life Cycle Assess. Springer, New York, pp 429–442 Castella PS, Blanc I, Ferrer MG, Ecabert B, Wakeman M, Manson J-A, Emery D, Han SH, Hong J, Jolliet O (2009) Integrating life cycle costs and environmental impacts of composite rail car-bodies for a Korean train. Int J Life Cycle Assess. Springer, New York, pp 429–442
7.
go back to reference Charles AS, Alan CB (2005) Asset life cycle management: towards improving physical asset performance in the process industry. Int J Oper Prod Manag 25:566–579CrossRef Charles AS, Alan CB (2005) Asset life cycle management: towards improving physical asset performance in the process industry. Int J Oper Prod Manag 25:566–579CrossRef
8.
go back to reference Du Preez ND, Louw L (2008) A framework for managing the innovation process. Institution of Electrical and Engineering Computer Society, Cape Town Du Preez ND, Louw L (2008) A framework for managing the innovation process. Institution of Electrical and Engineering Computer Society, Cape Town
9.
go back to reference Dwight R, El-Akruti, K (2009) The role of asset management in enterprise strategy success. In: 13th annual ICOMS asset management conference. ICOMS, Sydney Dwight R, El-Akruti, K (2009) The role of asset management in enterprise strategy success. In: 13th annual ICOMS asset management conference. ICOMS, Sydney
10.
go back to reference Eginhard JM (1977) An optimal decision rule for repair versus replacement. IEEE Trans Reliab R-26(3):179–181 Eginhard JM (1977) An optimal decision rule for repair versus replacement. IEEE Trans Reliab R-26(3):179–181
11.
go back to reference El-Akruti K (2012) The strategic role of engineering asset management in capital intensive organisations. Doctorate of Philosophy, Mechanical Engineering, University of Wollongong, Wollongong, p 247 El-Akruti K (2012) The strategic role of engineering asset management in capital intensive organisations. Doctorate of Philosophy, Mechanical Engineering, University of Wollongong, Wollongong, p 247
12.
go back to reference Esveld C (2001) Life cycle cost analysis. In: Modern railway track, 2nd edn. MRT Productions, The Netherlands, pp 615–629 Esveld C (2001) Life cycle cost analysis. In: Modern railway track, 2nd edn. MRT Productions, The Netherlands, pp 615–629
13.
go back to reference Farran M, Zayed T (2009) Comparative analysis of life-cycle costing for rehabilitating infrastructure systems. J Perform Constr Facil 23(5):320–326CrossRef Farran M, Zayed T (2009) Comparative analysis of life-cycle costing for rehabilitating infrastructure systems. J Perform Constr Facil 23(5):320–326CrossRef
14.
go back to reference Garcia FP, Lewis RW, Tobias AM, Roberts C (2008) Life cycle costs for railway condition monitoring. Transp Res Part E 44(6):1175–1187. ISSN:1366-5545 Garcia FP, Lewis RW, Tobias AM, Roberts C (2008) Life cycle costs for railway condition monitoring. Transp Res Part E 44(6):1175–1187. ISSN:1366-5545
15.
go back to reference Ge Z, Wei W (2011) The research of comprehensive evaluation model for thermal power equipment based on life cycle cost. Syst Eng Procedia 4:68–78 Ge Z, Wei W (2011) The research of comprehensive evaluation model for thermal power equipment based on life cycle cost. Syst Eng Procedia 4:68–78
16.
go back to reference Girsch G, Heyder R, Kumpfmuller N, Belz R (2005) Comparing the life-cycle costs of standard and head-hardened rail. Railway Gazette Int 161(9):549–551 Girsch G, Heyder R, Kumpfmuller N, Belz R (2005) Comparing the life-cycle costs of standard and head-hardened rail. Railway Gazette Int 161(9):549–551
18.
go back to reference Hartman (2004) Multiple asset replacement analysis under variable utilization and stochastic demand. Eur J Oper Res 159:145–165CrossRefMATH Hartman (2004) Multiple asset replacement analysis under variable utilization and stochastic demand. Eur J Oper Res 159:145–165CrossRefMATH
19.
go back to reference Herbert M, Gordon P (1979) Operations research techniques for management. Prentice-hall, Englewood Cliffs Herbert M, Gordon P (1979) Operations research techniques for management. Prentice-hall, Englewood Cliffs
20.
go back to reference Holland CP, Shaw DR, Kawalek P (2005) BP’s multi-enterprise asset management system. Inf Softw Technol 47(15):999–1007CrossRef Holland CP, Shaw DR, Kawalek P (2005) BP’s multi-enterprise asset management system. Inf Softw Technol 47(15):999–1007CrossRef
21.
go back to reference ISO/IEC Standard 15288 (2008) Systems and software engineering—system life cycle processes ISO/IEC Standard 15288 (2008) Systems and software engineering—system life cycle processes
22.
go back to reference Janz D, Westkamper E (2008) Value-oriented decision support for design to life cycle. In: LCE 2008: 15th CIRP international conference on life cycle engineering: conference proceedings. Sydney, Australia, pp 512–516 Janz D, Westkamper E (2008) Value-oriented decision support for design to life cycle. In: LCE 2008: 15th CIRP international conference on life cycle engineering: conference proceedings. Sydney, Australia, pp 512–516
23.
go back to reference Jardaine AKS (1970) Operation research in maintenance. Manchester University Press, Bannes and Noble, Inc. New York Jardaine AKS (1970) Operation research in maintenance. Manchester University Press, Bannes and Noble, Inc. New York
24.
go back to reference Jeromin I, Balzer G, Backes J, Huber R (2009) Life cycle cost analysis of transmission and distribution systems. In: PowerTech, IEEE Bucharest, 28 June 28–2 July, pp 1–6 Jeromin I, Balzer G, Backes J, Huber R (2009) Life cycle cost analysis of transmission and distribution systems. In: PowerTech, IEEE Bucharest, 28 June 28–2 July, pp 1–6
25.
go back to reference Jun HK, Kim JH (2007) Life cycle cost modelling for railway vehicle. In: Proceeding of international conference on electrical machines and system, pp 1989–1994 Jun HK, Kim JH (2007) Life cycle cost modelling for railway vehicle. In: Proceeding of international conference on electrical machines and system, pp 1989–1994
26.
go back to reference Khan F (2001) Equipment reliability: a life-cycle approach. Eng Manag J 11(3):127–135CrossRef Khan F (2001) Equipment reliability: a life-cycle approach. Eng Manag J 11(3):127–135CrossRef
27.
go back to reference Kim GU, Kim KT, Lee DH, Han CH, Kim HB, Jun JT (2009) Development of a life cycle cost estimate system for structures of light rail transit infrastructure. Autom Constr 19(2010):308–325 Kim GU, Kim KT, Lee DH, Han CH, Kim HB, Jun JT (2009) Development of a life cycle cost estimate system for structures of light rail transit infrastructure. Autom Constr 19(2010):308–325
28.
go back to reference Liu H-S (2012) Analysis of LCC model of high voltage transmission system. In: Power and energy engineering conference (APPEEC), Asia Pacific, 2012 Liu H-S (2012) Analysis of LCC model of high voltage transmission system. In: Power and energy engineering conference (APPEEC), Asia Pacific, 2012
29.
go back to reference Mahapatra D (2008) Life cycle costs and electricity market equilibrium: a policy assessment for India. In: 5th international conference on european electricity market, 28–30 May, pp 1, 6 Mahapatra D (2008) Life cycle costs and electricity market equilibrium: a policy assessment for India. In: 5th international conference on european electricity market, 28–30 May, pp 1, 6
30.
go back to reference Muchiri P, Pintelon L (2007) Modelling the effects of maintenance on manufacturing performance. Int J Prod Res 45:3741–3761 Muchiri P, Pintelon L (2007) Modelling the effects of maintenance on manufacturing performance. Int J Prod Res 45:3741–3761
31.
go back to reference Narayanamurthy G, Arora S (2008) An integrated maintenance and asset management system (IMAMS). Institute of Electrical and Electronics Engineers Computer Society, Bethesda Narayanamurthy G, Arora S (2008) An integrated maintenance and asset management system (IMAMS). Institute of Electrical and Electronics Engineers Computer Society, Bethesda
32.
go back to reference Norris GA (2001) Integrating life cycle cost analysis and LCA. Int J Life Cycle Assess 6(2):118–120 Norris GA (2001) Integrating life cycle cost analysis and LCA. Int J Life Cycle Assess 6(2):118–120
33.
go back to reference Nyuk JW, Su FT, Raymond W, Chui LO, Angelia S (2002) Life cycle analysis of Rooftop Gardens in Singapore. Build Environ 38:499–509 Nyuk JW, Su FT, Raymond W, Chui LO, Angelia S (2002) Life cycle analysis of Rooftop Gardens in Singapore. Build Environ 38:499–509
34.
go back to reference Omar A, El-Akruti K, Afshouk A, Salama M, Barasi M, Treki S, Mansour R (1996) A company report: product unit cost of semifinished and long products Omar A, El-Akruti K, Afshouk A, Salama M, Barasi M, Treki S, Mansour R (1996) A company report: product unit cost of semifinished and long products
35.
go back to reference Patra S, Kumar S (2009) Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration. IMechE vol 223 Part F. Rail and Rapid Transit, pp 285–293 Patra S, Kumar S (2009) Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration. IMechE vol 223 Part F. Rail and Rapid Transit, pp 285–293
36.
go back to reference Pinjala SK, Pintelon L, Vereecke A (2006) An empirical investigation on the relationship between business and maintenance strategies. Int J Prod Econ 104(1):214–229CrossRef Pinjala SK, Pintelon L, Vereecke A (2006) An empirical investigation on the relationship between business and maintenance strategies. Int J Prod Econ 104(1):214–229CrossRef
37.
go back to reference Porter ME (1985) Competitive advantage: creating and sustaining superior performance. Division of Macmillan Inc, New York Porter ME (1985) Competitive advantage: creating and sustaining superior performance. Division of Macmillan Inc, New York
38.
go back to reference Scarf P, Dwight R, McCusker A, Chan A (2006) Asset replacement for an urban railway using a modified two-cycle replacement model, JORS Scarf P, Dwight R, McCusker A, Chan A (2006) Asset replacement for an urban railway using a modified two-cycle replacement model, JORS
39.
go back to reference Schuman CA, Brent AC (2005) Asset life cycle management: towards improving physical asset performance in the process industry. Int J Oper Prod Manag 25(6):566–579CrossRef Schuman CA, Brent AC (2005) Asset life cycle management: towards improving physical asset performance in the process industry. Int J Oper Prod Manag 25(6):566–579CrossRef
40.
go back to reference Shahata K, Zayed T (2008) Simulation as a tool for life cycle cost analysis. In: Simulation conference, WSC 2008, pp 2497–2503 Shahata K, Zayed T (2008) Simulation as a tool for life cycle cost analysis. In: Simulation conference, WSC 2008, pp 2497–2503
41.
go back to reference Sullivan JL, Young SB (1995) Life cycle analysis assessment. Adv Mater Process 147(2):37 Sullivan JL, Young SB (1995) Life cycle analysis assessment. Adv Mater Process 147(2):37
42.
go back to reference Tähkämö L, Ylinen A, Puolakka M, Halonen L (2011) Life cycle cost analysis of three renewed street lighting installations in Finland. Int J Life Cycle Assess 17(2):154–164CrossRef Tähkämö L, Ylinen A, Puolakka M, Halonen L (2011) Life cycle cost analysis of three renewed street lighting installations in Finland. Int J Life Cycle Assess 17(2):154–164CrossRef
44.
go back to reference Thoft-Christensen P (2012) Infrastructures and life-cycle cost-benefit analysis. Struct Infrastruct Eng 8(5):507–516CrossRef Thoft-Christensen P (2012) Infrastructures and life-cycle cost-benefit analysis. Struct Infrastruct Eng 8(5):507–516CrossRef
45.
go back to reference Tsang AHC (2002) Strategic dimensions of maintenance management. J Qual Maint Eng 8(1):7–39CrossRef Tsang AHC (2002) Strategic dimensions of maintenance management. J Qual Maint Eng 8(1):7–39CrossRef
46.
go back to reference Uppal KB (2009) Cost estimating, project performance and life cycle. AACE Int Trans 3:1–9 Uppal KB (2009) Cost estimating, project performance and life cycle. AACE Int Trans 3:1–9
48.
49.
go back to reference Wijnia YC, Korn MS, de Jager SY, Herder P (2007) Long term optimization of asset replacement in energy infrastructures. In: 2006 IEEE international conference on systems, Man and Cybernetics, Taipai, Taiwan, 8–11 October 2006 Wijnia YC, Korn MS, de Jager SY, Herder P (2007) Long term optimization of asset replacement in energy infrastructures. In: 2006 IEEE international conference on systems, Man and Cybernetics, Taipai, Taiwan, 8–11 October 2006
50.
go back to reference Woodward DG (1997) Life cycle costing–theory, information acquisition and application. Int J Proj Manag 15(6):335–344 Great BritainCrossRef Woodward DG (1997) Life cycle costing–theory, information acquisition and application. Int J Proj Manag 15(6):335–344 Great BritainCrossRef
51.
go back to reference Wubbenhorst K (1986) Life cycle costing for construction projects. Long Range Plan 19(4):87–97CrossRef Wubbenhorst K (1986) Life cycle costing for construction projects. Long Range Plan 19(4):87–97CrossRef
Metadata
Title
The Role of Life Cycle Cost in Engineering Asset Management
Authors
Khaled El-Akruti
Richard Dwight
Tieling Zhang
Mujbil Al-Marsumi
Copyright Year
2015
DOI
https://doi.org/10.1007/978-3-319-09507-3_17