Skip to main content
Top
Published in: The International Journal of Life Cycle Assessment 2/2017

05-07-2016 | UNCERTAINTIES IN LCA

Uncertainty in life cycle costing for long-range infrastructure. Part I: leveling the playing field to address uncertainties

Authors: Patrick Ilg, Christoph Scope, Stefan Muench, Edeltraud Guenther

Published in: The International Journal of Life Cycle Assessment | Issue 2/2017

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Purpose

Life cycle costing (LCC) is a state-of-the-art method to analyze investment decisions in infrastructure projects. However, uncertainties inherent in long-term planning question the credibility of LCC results. Previous research has not systematically linked sources and methods to address this uncertainty. Part I of this series develops a framework to collect and categorize different sources of uncertainty and addressing methods. This systematization is a prerequisite to further analyze the suitability of methods and levels the playing field for part II.

Methods

Past reviews have dealt with selected issues of uncertainty in LCC. However, none has systematically collected uncertainties and linked methods to address them. No comprehensive categorization has been published to date. Part I addresses these two research gaps by conducting a systematic literature review. In a rigorous four-step approach, we first scrutinized major databases. Second, we performed a practical and methodological screening to identify in total 115 relevant publications, mostly case studies. Third, we applied content analysis using MAXQDA. Fourth, we illustrated results and concluded upon the research gaps.

Results and discussion

We identified 33 sources of uncertainty and 24 addressing methods. Sources of uncertainties were categorized according to (i) its origin, i.e., parameter, model, and scenario uncertainty and (ii) the nature of uncertainty, i.e., aleatoric or epistemic uncertainty. The methods to address uncertainties were classified into deterministic, probabilistic, possibilistic, and other methods. With regard to sources of uncertainties, lack of data and data quality was analyzed most often. Most uncertainties having been discussed were located in the use stage. With regard to methods, sensitivity analyses were applied most widely, while more complex methods such as Bayesian models were used less frequently. Data availability and the individual expertise of LCC practitioner foremost influence the selection of methods.

Conclusions

This article complements existing research by providing a thorough systematization of uncertainties in LCC. However, an unambiguous categorization of uncertainties is difficult and overlapping occurs. Such a systemizing approach is nevertheless necessary for further analyses and levels the playing field for readers not yet familiar with the topic. Part I concludes the following: First, an investigation about which methods are best suited to address a certain type of uncertainty is still outstanding. Second, an analysis of types of uncertainty that have been insufficiently addressed in previous LCC cases is still missing. Part II will focus on these research gaps.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Appendix
Available only for authorised users
Footnotes
1
Political, economic, social, technological, environmental, and legal aspects
 
Literature
go back to reference Aissani A, Chateauneuf A, Fontaine J-P, Audebert P (2014) Cost model for optimum thicknesses of insulated walls considering indirect impacts and uncertainties. Energy Build 84:21–32CrossRef Aissani A, Chateauneuf A, Fontaine J-P, Audebert P (2014) Cost model for optimum thicknesses of insulated walls considering indirect impacts and uncertainties. Energy Build 84:21–32CrossRef
go back to reference Allacker K (2012) Environmental and economic optimisation of the floor on grade in residential buildings. Int J Life Cycle Assess 17:813–827CrossRef Allacker K (2012) Environmental and economic optimisation of the floor on grade in residential buildings. Int J Life Cycle Assess 17:813–827CrossRef
go back to reference American Society of Civil Engineers (2015) J Infrastruct Syst American Society of Civil Engineers (2015) J Infrastruct Syst
go back to reference Ammar M, Zayed T, Moselhi O (2013) Fuzzy-based life-cycle cost model for decision making under subjectivity. J Constr Eng Manage 139:556–563CrossRef Ammar M, Zayed T, Moselhi O (2013) Fuzzy-based life-cycle cost model for decision making under subjectivity. J Constr Eng Manage 139:556–563CrossRef
go back to reference Andrade AR, Teixeira PF (2012) A Bayesian model to assess rail track geometry degradation through its life-cycle. Res Transp Econ 36:1–8CrossRef Andrade AR, Teixeira PF (2012) A Bayesian model to assess rail track geometry degradation through its life-cycle. Res Transp Econ 36:1–8CrossRef
go back to reference Anwari M, Rashid M, Muhyiddin H, Ali A (2012) An evaluation of hybrid wind/diesel energy potential in Pemanggil Island Malaysia. IEEE, pp 1–5 Anwari M, Rashid M, Muhyiddin H, Ali A (2012) An evaluation of hybrid wind/diesel energy potential in Pemanggil Island Malaysia. IEEE, pp 1–5
go back to reference Apostolakis G (1990) The concept of probability in safety assessments of technological systems. Science 250:1359–1364CrossRef Apostolakis G (1990) The concept of probability in safety assessments of technological systems. Science 250:1359–1364CrossRef
go back to reference Asiedu Y, Besant RW (2000) Simulation-based cost estimation under economic uncertainty using kernel estimators. Int J Prod Res 38:2023–2035CrossRef Asiedu Y, Besant RW (2000) Simulation-based cost estimation under economic uncertainty using kernel estimators. Int J Prod Res 38:2023–2035CrossRef
go back to reference Asiedu Y, Gu P (1998) Product life cycle cost analysis: state of the art review. Int J Prod Res 36:883–908CrossRef Asiedu Y, Gu P (1998) Product life cycle cost analysis: state of the art review. Int J Prod Res 36:883–908CrossRef
go back to reference Ayyub BM (2001) Elicitation of expert opinions for uncertainty and risks. CRC Press Ayyub BM (2001) Elicitation of expert opinions for uncertainty and risks. CRC Press
go back to reference Battke B, Schmidt TS, Grosspietsch D, Hoffmann VH (2013) A review and probabilistic model of lifecycle costs of stationary batteries in multiple applications. Renew Sustain Energy Rev 25:240–250CrossRef Battke B, Schmidt TS, Grosspietsch D, Hoffmann VH (2013) A review and probabilistic model of lifecycle costs of stationary batteries in multiple applications. Renew Sustain Energy Rev 25:240–250CrossRef
go back to reference Becheikh N, Landry R, Amara N (2006) Lessons from innovation empirical studies in the manufacturing sector: a systematic review of the literature from 1993–2003. Technovation 26:644–664CrossRef Becheikh N, Landry R, Amara N (2006) Lessons from innovation empirical studies in the manufacturing sector: a systematic review of the literature from 1993–2003. Technovation 26:644–664CrossRef
go back to reference Bedford T, Cooke R (2001) Probabilistic risk analysis: foundations and methods. Cambridge University Press Bedford T, Cooke R (2001) Probabilistic risk analysis: foundations and methods. Cambridge University Press
go back to reference Bevington PR, Robinson DK (1992) Error analysis. Data Reduct Error Anal Phys Sci 38–48 Bevington PR, Robinson DK (1992) Error analysis. Data Reduct Error Anal Phys Sci 38–48
go back to reference Björklund AE (2002) Survey of approaches to improve reliability in LCA. Int J Life Cycle Assess 7:64–72CrossRef Björklund AE (2002) Survey of approaches to improve reliability in LCA. Int J Life Cycle Assess 7:64–72CrossRef
go back to reference Book SA (1999) Why correlation matters in cost estimating. pp 2–5 Book SA (1999) Why correlation matters in cost estimating. pp 2–5
go back to reference Boussabaine HA, Kirkham RJ (2004) Whole life risk analysis techniques. In: Whole life-cycle costing: risk and risk responses. Blackwell Publishing Ltd, pp 56–83 Boussabaine HA, Kirkham RJ (2004) Whole life risk analysis techniques. In: Whole life-cycle costing: risk and risk responses. Blackwell Publishing Ltd, pp 56–83
go back to reference Budnitz RJ, Apostolakis G, Boore DM et al (1997) Recommendations for probabilistic seismic hazard analysis: guidance on uncertainty and use of experts Budnitz RJ, Apostolakis G, Boore DM et al (1997) Recommendations for probabilistic seismic hazard analysis: guidance on uncertainty and use of experts
go back to reference Butry D (2009) Economic performance of residential fire sprinkler systems. Fire Technol 45:117–143CrossRef Butry D (2009) Economic performance of residential fire sprinkler systems. Fire Technol 45:117–143CrossRef
go back to reference Cavalieri S, Maccarrone P, Pinto R (2004) Parametric vs. neural network models for the estimation of production costs: a case study in the automotive industry. Int J Prod Econ 91:165–177CrossRef Cavalieri S, Maccarrone P, Pinto R (2004) Parametric vs. neural network models for the estimation of production costs: a case study in the automotive industry. Int J Prod Econ 91:165–177CrossRef
go back to reference Chen C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management Chen C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management
go back to reference Chien SI-J, Ding Y, Wei C (2002) Dynamic bus arrival time prediction with artificial neural networks. J Transp Eng 128:429–438CrossRef Chien SI-J, Ding Y, Wei C (2002) Dynamic bus arrival time prediction with artificial neural networks. J Transp Eng 128:429–438CrossRef
go back to reference Cole RJ, Sterner E (2000) Reconciling theory and practice of life-cycle costing. Build Res Inf 28:368–375CrossRef Cole RJ, Sterner E (2000) Reconciling theory and practice of life-cycle costing. Build Res Inf 28:368–375CrossRef
go back to reference Cole RC, Morandi F, Avenell J, Daniel GB (2005) Trans-splenic portal scintigraphy in normal dogs. Vet Radiol Ultrasound 46:146–152CrossRef Cole RC, Morandi F, Avenell J, Daniel GB (2005) Trans-splenic portal scintigraphy in normal dogs. Vet Radiol Ultrasound 46:146–152CrossRef
go back to reference Dalkey N, Helmer O (1963) An experimental application of the DELPHI method to the use of experts. Manag Sci 9:458–467CrossRef Dalkey N, Helmer O (1963) An experimental application of the DELPHI method to the use of experts. Manag Sci 9:458–467CrossRef
go back to reference Danaher AC (2012) Incorporating externalities and uncertainty into life-cycle cost analysis. DTIC document Danaher AC (2012) Incorporating externalities and uncertainty into life-cycle cost analysis. DTIC document
go back to reference De Leon D, Diaz Camacho S, Gonzalez Perez CA (2013) Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration. Rev Tec Fac Ing Univ Zulia 36:114–121 De Leon D, Diaz Camacho S, Gonzalez Perez CA (2013) Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration. Rev Tec Fac Ing Univ Zulia 36:114–121
go back to reference Der Kiureghian A, Ditlevsen O (2007) Aleatory or epistemic? Does it matter? Special workshop on risk acceptance and risk communication, March 26–27, 2007. Stanford University, Stanford Der Kiureghian A, Ditlevsen O (2007) Aleatory or epistemic? Does it matter? Special workshop on risk acceptance and risk communication, March 26–27, 2007. Stanford University, Stanford
go back to reference Dhillon BS (1981) Life cycle cost: a survey. Microelectron Reliab 21:495–511CrossRef Dhillon BS (1981) Life cycle cost: a survey. Microelectron Reliab 21:495–511CrossRef
go back to reference Domínguez-Muñoz F, Cejudo-López JM, Carrillo-Andrés A (2010) Uncertainty in peak cooling load calculations. Energy Build 42:1010–1018CrossRef Domínguez-Muñoz F, Cejudo-López JM, Carrillo-Andrés A (2010) Uncertainty in peak cooling load calculations. Energy Build 42:1010–1018CrossRef
go back to reference Durango-Cohen P, Tadepalli N (2006) Using advanced inspection technologies to support investments in maintenance and repair of transportation infrastructure facilities. J Transp Eng 132:60–68CrossRef Durango-Cohen P, Tadepalli N (2006) Using advanced inspection technologies to support investments in maintenance and repair of transportation infrastructure facilities. J Transp Eng 132:60–68CrossRef
go back to reference Ehlen MA, Marshall HE (1996) The economics of new-technology materials: a case study of FRP bridge decking. US Department of Commerce, Technology Administration, National Institute of Standards and Technology, Office of Applied Economics, Building and Fire Research Laboratory Ehlen MA, Marshall HE (1996) The economics of new-technology materials: a case study of FRP bridge decking. US Department of Commerce, Technology Administration, National Institute of Standards and Technology, Office of Applied Economics, Building and Fire Research Laboratory
go back to reference El-Diraby TE, Rasic I (2004) Framework for managing life-cycle cost of smart infrastructure systems. J Comput Civ Eng 18:115–119CrossRef El-Diraby TE, Rasic I (2004) Framework for managing life-cycle cost of smart infrastructure systems. J Comput Civ Eng 18:115–119CrossRef
go back to reference Emblemsvåg J, Bras B (1997) Method for life-cycle design cost assessments using activity-based costing and uncertainty. Eng Des Autom 3:339–354 Emblemsvåg J, Bras B (1997) Method for life-cycle design cost assessments using activity-based costing and uncertainty. Eng Des Autom 3:339–354
go back to reference Fernandes P, Roy R, Mehnen J, Harrison A (2011) An overview on degradation modelling for service cost estimation. In: Functional thinking for value creation. Springer, pp 309–314 Fernandes P, Roy R, Mehnen J, Harrison A (2011) An overview on degradation modelling for service cost estimation. In: Functional thinking for value creation. Springer, pp 309–314
go back to reference Fink A (2013) Conducting research literature reviews: from the internet to paper. Sage Publications, Thousand Oaks Fink A (2013) Conducting research literature reviews: from the internet to paper. Sage Publications, Thousand Oaks
go back to reference Francis R, Falconi S, Nateghi R, Guikema S (2011) Probabilistic life cycle analysis model for evaluating electric power infrastructure risk mitigation investments. Clim Change 106:31–55CrossRef Francis R, Falconi S, Nateghi R, Guikema S (2011) Probabilistic life cycle analysis model for evaluating electric power infrastructure risk mitigation investments. Clim Change 106:31–55CrossRef
go back to reference Funtowicz SO, Ravetz JR (1990) Uncertainty and quality in science for policy. Springer Science & Business Media Funtowicz SO, Ravetz JR (1990) Uncertainty and quality in science for policy. Springer Science & Business Media
go back to reference Fwa TF, Tan CY, Chan WT (1994) Road-maintenance planning using genetic algorithms. II: analysis Fwa TF, Tan CY, Chan WT (1994) Road-maintenance planning using genetic algorithms. II: analysis
go back to reference GAO (2007) Cost assessment guide best practices for estimating and managing program costs. US Government Accountability Office, Washington, DC GAO (2007) Cost assessment guide best practices for estimating and managing program costs. US Government Accountability Office, Washington, DC
go back to reference Geisler G, Hellweg S, Hungerbühler K (2005) Uncertainty analysis in life cycle assessment (LCA): case study on plant-protection products and implications for decision making. Int J Life Cycle Assess 10:184–192CrossRef Geisler G, Hellweg S, Hungerbühler K (2005) Uncertainty analysis in life cycle assessment (LCA): case study on plant-protection products and implications for decision making. Int J Life Cycle Assess 10:184–192CrossRef
go back to reference Gluch P, Baumann H (2004) The life cycle costing (LCC) approach: a conceptual discussion of its usefulness for environmental decision-making. Build Environ 39:571–580CrossRef Gluch P, Baumann H (2004) The life cycle costing (LCC) approach: a conceptual discussion of its usefulness for environmental decision-making. Build Environ 39:571–580CrossRef
go back to reference Goh YM, Newnes LB, Mileham AR et al (2010) Uncertainty in through-life costing—review and perspectives. IEEE Trans Eng Manag 57:689–701CrossRef Goh YM, Newnes LB, Mileham AR et al (2010) Uncertainty in through-life costing—review and perspectives. IEEE Trans Eng Manag 57:689–701CrossRef
go back to reference Greenberg M, Mayer H, Lewis D (2004) Life‐cycle cost in a highly uncertain economic environment: the case of managing the US Department of Energy’s nuclear waste legacy. Fed Facil Environ J 15:67–82CrossRef Greenberg M, Mayer H, Lewis D (2004) Life‐cycle cost in a highly uncertain economic environment: the case of managing the US Department of Energy’s nuclear waste legacy. Fed Facil Environ J 15:67–82CrossRef
go back to reference Guo T, Liu T, Li A (2012) Pavement rehabilitation strategy selection for steel suspension bridges based on probabilistic life-cycle cost analysis. J Perform Constr Facil 26:76–83CrossRef Guo T, Liu T, Li A (2012) Pavement rehabilitation strategy selection for steel suspension bridges based on probabilistic life-cycle cost analysis. J Perform Constr Facil 26:76–83CrossRef
go back to reference Halog A (2004) An approach to selection of sustainable product improvement alternatives with data uncertainty. J Sustain Prod Des 4:3–19CrossRef Halog A (2004) An approach to selection of sustainable product improvement alternatives with data uncertainty. J Sustain Prod Des 4:3–19CrossRef
go back to reference Han G, Srebric J, Enache-Pommer E (2014) Variability of optimal solutions for building components based on comprehensive life cycle cost analysis. Energy Build 79:223–231CrossRef Han G, Srebric J, Enache-Pommer E (2014) Variability of optimal solutions for building components based on comprehensive life cycle cost analysis. Energy Build 79:223–231CrossRef
go back to reference Heijungs R, Huijbregts MA (2004) A review of approaches to treat uncertainty in LCA. Osnabruck, Germany Heijungs R, Huijbregts MA (2004) A review of approaches to treat uncertainty in LCA. Osnabruck, Germany
go back to reference Hellweg S (2001) Time-and site-dependent life cycle assessment of thermal waste treatment processes. Int J Life Cycle Assess 6:46–46CrossRef Hellweg S (2001) Time-and site-dependent life cycle assessment of thermal waste treatment processes. Int J Life Cycle Assess 6:46–46CrossRef
go back to reference Helton JC (1994) Treatment of uncertainty in performance assessments for complex systems. Risk Anal 14:483–511CrossRef Helton JC (1994) Treatment of uncertainty in performance assessments for complex systems. Risk Anal 14:483–511CrossRef
go back to reference Henrion M, Fischhoff B (2013) Assessing uncertainty in physical constants. Judgm Decis Mak 146 Henrion M, Fischhoff B (2013) Assessing uncertainty in physical constants. Judgm Decis Mak 146
go back to reference Hinow M, Mevissen M (2011) Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm. IEEE Trans Power Deliv 26:197–204CrossRef Hinow M, Mevissen M (2011) Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm. IEEE Trans Power Deliv 26:197–204CrossRef
go back to reference Hofstetter P (1998) Perspectives in life cycle impact assessment: a structured approach to combine models of the technosphere, ecosphere, and valuesphere. Springer Science & Business Media Hofstetter P (1998) Perspectives in life cycle impact assessment: a structured approach to combine models of the technosphere, ecosphere, and valuesphere. Springer Science & Business Media
go back to reference Hong T, Han S, Lee S (2007) Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels. Autom Constr 16:140–152CrossRef Hong T, Han S, Lee S (2007) Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels. Autom Constr 16:140–152CrossRef
go back to reference Huijbregts MA (1998) Application of uncertainty and variability in LCA. Int J Life Cycle Assess 3:273–280CrossRef Huijbregts MA (1998) Application of uncertainty and variability in LCA. Int J Life Cycle Assess 3:273–280CrossRef
go back to reference Huijbregts MA, Gilijamse W, Ragas AM, Reijnders L (2003) Evaluating uncertainty in environmental life-cycle assessment. A case study comparing two insulation options for a Dutch one-family dwelling. Environ Sci Technol 37:2600–2608CrossRef Huijbregts MA, Gilijamse W, Ragas AM, Reijnders L (2003) Evaluating uncertainty in environmental life-cycle assessment. A case study comparing two insulation options for a Dutch one-family dwelling. Environ Sci Technol 37:2600–2608CrossRef
go back to reference Hunkeler DJ, Lichtenvort K, Rebitzer G (2008) Environmental life cycle costing. CRC Press, Boca RatonCrossRef Hunkeler DJ, Lichtenvort K, Rebitzer G (2008) Environmental life cycle costing. CRC Press, Boca RatonCrossRef
go back to reference Ilg P, Hoehne C, Guenther E (2016) High-performance materials in infrastructure: a review of applied life cycle costing and its drivers—the case of fiber-reinforced composites. J Clean Prod 12:926–945CrossRef Ilg P, Hoehne C, Guenther E (2016) High-performance materials in infrastructure: a review of applied life cycle costing and its drivers—the case of fiber-reinforced composites. J Clean Prod 12:926–945CrossRef
go back to reference Iman RL, Shortencarier MJ (1984) FORTRAN 77 program and user’s guide for the generation of Latin hypercube and random samples for use with computer models. Sandia National Labs, AlbuquerqueCrossRef Iman RL, Shortencarier MJ (1984) FORTRAN 77 program and user’s guide for the generation of Latin hypercube and random samples for use with computer models. Sandia National Labs, AlbuquerqueCrossRef
go back to reference ISO 15686–5 (2008) Buildings and constructed assets—service-life planning—part 5: life-cycle costing ISO 15686–5 (2008) Buildings and constructed assets—service-life planning—part 5: life-cycle costing
go back to reference Isukapalli SS (1999) Uncertainty analysis of transport-transformation models. The State University of New Jersey, Rutgers Isukapalli SS (1999) Uncertainty analysis of transport-transformation models. The State University of New Jersey, Rutgers
go back to reference Jochimsen R (1966) Theorie der Infrastrucktur: Grundlagen der marktwirtschaftlichen Entwicklung. Mohr Siebeck Jochimsen R (1966) Theorie der Infrastrucktur: Grundlagen der marktwirtschaftlichen Entwicklung. Mohr Siebeck
go back to reference Johnson DR, Willis HH, Curtright AE et al (2011) Incorporating uncertainty analysis into life cycle estimates of greenhouse gas emissions from biomass production. Biomass Bioenergy 35:2619–2626CrossRef Johnson DR, Willis HH, Curtright AE et al (2011) Incorporating uncertainty analysis into life cycle estimates of greenhouse gas emissions from biomass production. Biomass Bioenergy 35:2619–2626CrossRef
go back to reference Jung P, Seo J, Lee J (2009) Probabilistic value analysis methodology for public water supply systems. Civ Eng Environ Syst 26:141–155CrossRef Jung P, Seo J, Lee J (2009) Probabilistic value analysis methodology for public water supply systems. Civ Eng Environ Syst 26:141–155CrossRef
go back to reference Kahneman D, Tversky A (1982) Variants of uncertainty. Cognition 11:143–157CrossRef Kahneman D, Tversky A (1982) Variants of uncertainty. Cognition 11:143–157CrossRef
go back to reference Kantola M, Saari A (2013) Renewable vs. traditional energy management solutions—a Finnish hospital facility case. Renew Energy Int J 57:539–545CrossRef Kantola M, Saari A (2013) Renewable vs. traditional energy management solutions—a Finnish hospital facility case. Renew Energy Int J 57:539–545CrossRef
go back to reference Kavousi-Fard A, Niknam T, Khooban MH (2014) Intelligent stochastic framework to solve the reconfiguration problem from the reliability view. IET Sci Meas Technol 8:245–259CrossRef Kavousi-Fard A, Niknam T, Khooban MH (2014) Intelligent stochastic framework to solve the reconfiguration problem from the reliability view. IET Sci Meas Technol 8:245–259CrossRef
go back to reference Kayrbekova D, Markeset T, Ghodrati B (2011) Activity-based life cycle cost analysis as an alternative to conventional LCC in engineering design. Int J Syst Assur Eng Manag 2:218–225CrossRef Kayrbekova D, Markeset T, Ghodrati B (2011) Activity-based life cycle cost analysis as an alternative to conventional LCC in engineering design. Int J Syst Assur Eng Manag 2:218–225CrossRef
go back to reference Kim S, Frangopol DM (2011) Inspection and monitoring planning for RC structures based on minimization of expected damage detection delay. Probab Eng Mech 26:308–320CrossRef Kim S, Frangopol DM (2011) Inspection and monitoring planning for RC structures based on minimization of expected damage detection delay. Probab Eng Mech 26:308–320CrossRef
go back to reference Kirkham RJ, Boussabaine AH, Kirkham MP (2002) Stochastic time series forecasting of electricity costs in an NHS acute care hospital building, for use in whole life cycle costing. Eng Constr Archit Manag 9:38–52CrossRef Kirkham RJ, Boussabaine AH, Kirkham MP (2002) Stochastic time series forecasting of electricity costs in an NHS acute care hospital building, for use in whole life cycle costing. Eng Constr Archit Manag 9:38–52CrossRef
go back to reference Kishk M (2004) Combining various facets of uncertainty in whole‐life cost modelling. Constr Manag Econ 22:429–435CrossRef Kishk M (2004) Combining various facets of uncertainty in whole‐life cost modelling. Constr Manag Econ 22:429–435CrossRef
go back to reference Klauer B, Manstetten R, Petersen T, Schiller J (2013) The art of long-term thinking: a bridge between sustainability science and politics. Ecol Econ 93:79–84CrossRef Klauer B, Manstetten R, Petersen T, Schiller J (2013) The art of long-term thinking: a bridge between sustainability science and politics. Ecol Econ 93:79–84CrossRef
go back to reference Klir GJ (1996) Uncertainty theories, measures, and principles: an overview of personal views and contributions. In: Natke H, Ben-Haim Y (eds.) Uncertainty: a discussion from various points of view Klir GJ (1996) Uncertainty theories, measures, and principles: an overview of personal views and contributions. In: Natke H, Ben-Haim Y (eds.) Uncertainty: a discussion from various points of view
go back to reference Klöpffer W, Ciroth A (2011) Is LCC relevant in a sustainability assessment? Int J Life Cycle Assess 16:99–101CrossRef Klöpffer W, Ciroth A (2011) Is LCC relevant in a sustainability assessment? Int J Life Cycle Assess 16:99–101CrossRef
go back to reference Koopmans TC (1959) Three essays on the state of economic science. A. M. Kelley Publishers Koopmans TC (1959) Three essays on the state of economic science. A. M. Kelley Publishers
go back to reference Kostka G, Anzinger N (2015) Large infrastructure projects in Germany—between ambition and realities. Hertie School of Governance, pp 1–3 Kostka G, Anzinger N (2015) Large infrastructure projects in Germany—between ambition and realities. Hertie School of Governance, pp 1–3
go back to reference Kumar R, Gardoni P, SanchezSilva M (2009) Effect of cumulative seismic damage and corrosion on the lifecycle cost of reinforced concrete bridges. Earthq Eng Struct Dyn 38:887–905CrossRef Kumar R, Gardoni P, SanchezSilva M (2009) Effect of cumulative seismic damage and corrosion on the lifecycle cost of reinforced concrete bridges. Earthq Eng Struct Dyn 38:887–905CrossRef
go back to reference Lai J, Zhang L, Duffield CF, Aye L (2013) Engineering reliability analysis in risk management framework: development and application in infrastructure project. Int J Appl Math 43:242–249 Lai J, Zhang L, Duffield CF, Aye L (2013) Engineering reliability analysis in risk management framework: development and application in infrastructure project. Int J Appl Math 43:242–249
go back to reference Lee J-Y, Yoo M, Cha K et al (2009) Life cycle cost analysis to examine the economical feasibility of hydrogen as an alternative fuel. Int J Hydrog Energy 34:4243–4255CrossRef Lee J-Y, Yoo M, Cha K et al (2009) Life cycle cost analysis to examine the economical feasibility of hydrogen as an alternative fuel. Int J Hydrog Energy 34:4243–4255CrossRef
go back to reference Levander E, Schade J, Stehn L (2009) Life cycle cost calculation models for buildings & addressing uncertainties about timber housing by whole life costing Levander E, Schade J, Stehn L (2009) Life cycle cost calculation models for buildings & addressing uncertainties about timber housing by whole life costing
go back to reference Li Z, Madanu S (2009) Highway project level life-cycle benefit/cost analysis under certainty, risk, and uncertainty: methodology with case study. J Transp Eng 135:516–526CrossRef Li Z, Madanu S (2009) Highway project level life-cycle benefit/cost analysis under certainty, risk, and uncertainty: methodology with case study. J Transp Eng 135:516–526CrossRef
go back to reference Lindholm A, Suomala P (2007) Learning by costing: sharpening cost image through life cycle costing? Int J Product Perform Manag 56:651–672CrossRef Lindholm A, Suomala P (2007) Learning by costing: sharpening cost image through life cycle costing? Int J Product Perform Manag 56:651–672CrossRef
go back to reference Liu G (2014) Development of a general sustainability indicator for renewable energy systems: a review. Renew Sustain Energy Rev 31:611–621CrossRef Liu G (2014) Development of a general sustainability indicator for renewable energy systems: a review. Renew Sustain Energy Rev 31:611–621CrossRef
go back to reference Mata É, Sasic Kalagasidis A, Johnsson F (2014) Cost-effective retrofitting of Swedish residential buildings: effects of energy price developments and discount rates. Energy Effic 8:223–327CrossRef Mata É, Sasic Kalagasidis A, Johnsson F (2014) Cost-effective retrofitting of Swedish residential buildings: effects of energy price developments and discount rates. Energy Effic 8:223–327CrossRef
go back to reference Mavrotas G, Florios K, Vlachou D (2010) Energy planning of a hospital using mathematical programming and Monte Carlo simulation for dealing with uncertainty in the economic parameters. Energy Convers Manag 51:722–731CrossRef Mavrotas G, Florios K, Vlachou D (2010) Energy planning of a hospital using mathematical programming and Monte Carlo simulation for dealing with uncertainty in the economic parameters. Energy Convers Manag 51:722–731CrossRef
go back to reference Mayring P (2015) Qualitative Inhaltsanalyse. Beltz Pädagogik Mayring P (2015) Qualitative Inhaltsanalyse. Beltz Pädagogik
go back to reference McDonald M, Madanat S (2012) Life-cycle cost minimization and sensitivity analysis for mechanistic-empirical pavement design. J Transp Eng 138:706–713CrossRef McDonald M, Madanat S (2012) Life-cycle cost minimization and sensitivity analysis for mechanistic-empirical pavement design. J Transp Eng 138:706–713CrossRef
go back to reference Menikpura SNM, Gheewala S, Bonnet S (2012) Sustainability assessment of municipal solid waste management in Sri Lanka: problems and prospects. J Mater Cycles Waste Manage 14:181–192CrossRef Menikpura SNM, Gheewala S, Bonnet S (2012) Sustainability assessment of municipal solid waste management in Sri Lanka: problems and prospects. J Mater Cycles Waste Manage 14:181–192CrossRef
go back to reference Mishalani RG, Gong L (2009a) Optimal Sampling of Infrastructure condition: motivation, formulation, and evaluation. J Infrastruct Syst 15:313–320CrossRef Mishalani RG, Gong L (2009a) Optimal Sampling of Infrastructure condition: motivation, formulation, and evaluation. J Infrastruct Syst 15:313–320CrossRef
go back to reference Mishalani RG, Gong L (2009b) Optimal infrastructure condition sampling over space and time for maintenance decision-making under uncertainty. Transp Res B Methodol 43:311–324CrossRef Mishalani RG, Gong L (2009b) Optimal infrastructure condition sampling over space and time for maintenance decision-making under uncertainty. Transp Res B Methodol 43:311–324CrossRef
go back to reference Mitropoulou CC, Lagaros ND, Papadrakakis M (2011) Life-cycle cost assessment of optimally designed reinforced concrete buildings under seismic actions. Reliab Eng Syst Saf 96:1311–1331CrossRef Mitropoulou CC, Lagaros ND, Papadrakakis M (2011) Life-cycle cost assessment of optimally designed reinforced concrete buildings under seismic actions. Reliab Eng Syst Saf 96:1311–1331CrossRef
go back to reference Moher D, Klassen TP, Schulz KF et al (2000) What contributions do languages other than English make on the results of meta-analyses? J Clin Epidemiol 53:964–972CrossRef Moher D, Klassen TP, Schulz KF et al (2000) What contributions do languages other than English make on the results of meta-analyses? J Clin Epidemiol 53:964–972CrossRef
go back to reference Moore T, Morrissey J (2014) Lifecycle costing sensitivities for zero energy housing in Melbourne, Australia. Energy Build 79:1–11CrossRef Moore T, Morrissey J (2014) Lifecycle costing sensitivities for zero energy housing in Melbourne, Australia. Energy Build 79:1–11CrossRef
go back to reference Morcous G, Lounis Z (2005) Maintenance optimization of infrastructure networks using genetic algorithms. Autom Constr 14:129–142CrossRef Morcous G, Lounis Z (2005) Maintenance optimization of infrastructure networks using genetic algorithms. Autom Constr 14:129–142CrossRef
go back to reference Morgan MG, Henrion M (1990) Uncertainty: a guide to dealing with uncertainty in quantitative risk and policy analysis. Cambridge University Press Morgan MG, Henrion M (1990) Uncertainty: a guide to dealing with uncertainty in quantitative risk and policy analysis. Cambridge University Press
go back to reference Mullard JA, Stewart MG (2012) Life-cycle cost assessment of maintenance strategies for RC structures in chloride environments. J Bridge Eng 17:353–362CrossRef Mullard JA, Stewart MG (2012) Life-cycle cost assessment of maintenance strategies for RC structures in chloride environments. J Bridge Eng 17:353–362CrossRef
go back to reference US National Research Council (2000) Risk analysis and uncertainty in flood damage reduction studies. Committee on Risk-Based Analysis for Flood Damage Reduction US National Research Council (2000) Risk analysis and uncertainty in flood damage reduction studies. Committee on Risk-Based Analysis for Flood Damage Reduction
go back to reference Natke HG, Ben-Haim Y (1997) Uncertainty—a discussion from various points of view. Math Res 99:267–276 Natke HG, Ben-Haim Y (1997) Uncertainty—a discussion from various points of view. Math Res 99:267–276
go back to reference Oberkampf WL, Helton JC, Sentz K (2001) Mathematical representation of uncertainty. In: AIAA non-deterministic approaches forum. pp 16–19 Oberkampf WL, Helton JC, Sentz K (2001) Mathematical representation of uncertainty. In: AIAA non-deterministic approaches forum. pp 16–19
go back to reference Park CS, Sharp-Bette GP (1990) Advanced engineering economics. Wiley Park CS, Sharp-Bette GP (1990) Advanced engineering economics. Wiley
go back to reference Patra AP, Söderholm P, Kumar U (2009) Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration. Proc Inst Mech Eng F J Rail Rapid Transit 223:285–293CrossRef Patra AP, Söderholm P, Kumar U (2009) Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration. Proc Inst Mech Eng F J Rail Rapid Transit 223:285–293CrossRef
go back to reference Pesonen H-L, Horn S (2013) Evaluating the Sustainability SWOT as a streamlined tool for life cycle sustainability assessment. Int J Life Cycle Assess 18:1780–1792CrossRef Pesonen H-L, Horn S (2013) Evaluating the Sustainability SWOT as a streamlined tool for life cycle sustainability assessment. Int J Life Cycle Assess 18:1780–1792CrossRef
go back to reference Rathore C, Roy R (2014) A novel modified GBMO algorithm based static transmission network expansion planning. Int J Electr Power Energy Syst 62:519–531CrossRef Rathore C, Roy R (2014) A novel modified GBMO algorithm based static transmission network expansion planning. Int J Electr Power Energy Syst 62:519–531CrossRef
go back to reference Reich MC (2005) Economic assessment of municipal waste management systems—case studies using a combination of life cycle assessment (LCA) and life cycle costing (LCC). J Clean Prod 13:253–263CrossRef Reich MC (2005) Economic assessment of municipal waste management systems—case studies using a combination of life cycle assessment (LCA) and life cycle costing (LCC). J Clean Prod 13:253–263CrossRef
go back to reference Robert F, Gosselin L (2014) New methodology to design ground coupled heat pump systems based on total cost minimization. Appl Therm Eng 62:481–491CrossRef Robert F, Gosselin L (2014) New methodology to design ground coupled heat pump systems based on total cost minimization. Appl Therm Eng 62:481–491CrossRef
go back to reference Rodríguez Rivero EJ, Emblemsvåg J (2007) Activity-based life-cycle costing in long-range planning. Rev Account Finance 6:370–390CrossRef Rodríguez Rivero EJ, Emblemsvåg J (2007) Activity-based life-cycle costing in long-range planning. Rev Account Finance 6:370–390CrossRef
go back to reference Roy R (2003) Cost engineering: why, what and how? Cranfield University, ISBN 1-861940-96-3 Roy R (2003) Cost engineering: why, what and how? Cranfield University, ISBN 1-861940-96-3
go back to reference Russell AD (1981) Economic risks in energy conservation strategies. Build Environ 16:109–121CrossRef Russell AD (1981) Economic risks in energy conservation strategies. Build Environ 16:109–121CrossRef
go back to reference Saassouh B, Lounis Z (2012) Probabilistic modeling of chloride-induced corrosion in concrete structures using first- and second-order reliability methods. Cem Concr Compos 34:1082–1093CrossRef Saassouh B, Lounis Z (2012) Probabilistic modeling of chloride-induced corrosion in concrete structures using first- and second-order reliability methods. Cem Concr Compos 34:1082–1093CrossRef
go back to reference Sanyé-Mengual E, Oliver-Solà J, Montero J, Rieradevall J (2015) An environmental and economic life cycle assessment of rooftop greenhouse (RTG) implementation in Barcelona, Spain. Assessing new forms of urban agriculture from the greenhouse structure to the final product level. Int J Life Cycle Assess 20:350–366CrossRef Sanyé-Mengual E, Oliver-Solà J, Montero J, Rieradevall J (2015) An environmental and economic life cycle assessment of rooftop greenhouse (RTG) implementation in Barcelona, Spain. Assessing new forms of urban agriculture from the greenhouse structure to the final product level. Int J Life Cycle Assess 20:350–366CrossRef
go back to reference Schmidt W-P (2003) Life cycle costing as part of design for environment environmental business cases. Int J Life Cycle Assess 8:167–174CrossRef Schmidt W-P (2003) Life cycle costing as part of design for environment environmental business cases. Int J Life Cycle Assess 8:167–174CrossRef
go back to reference Scope C, Ilg P, Muench S, Guenther E (2016) Uncertainty in life cycle costing for long-range infrastructure. Part II: guidance and suitability of applied methods to address uncertainty. Int J Life Cycle Assess. doi:10.1007/s11367-016-1086-9 Scope C, Ilg P, Muench S, Guenther E (2016) Uncertainty in life cycle costing for long-range infrastructure. Part II: guidance and suitability of applied methods to address uncertainty. Int J Life Cycle Assess. doi:10.​1007/​s11367-016-1086-9
go back to reference Settanni E, Emblemsvåg J (2010) Applying a non-deterministic conceptual life cycle costing model to manufacturing processes. J Model Manag 5:220–262CrossRef Settanni E, Emblemsvåg J (2010) Applying a non-deterministic conceptual life cycle costing model to manufacturing processes. J Model Manag 5:220–262CrossRef
go back to reference Seuring S, Müller M (2008) From a literature review to a conceptual framework for sustainable supply chain management. J Clean Prod 16:1699–1710CrossRef Seuring S, Müller M (2008) From a literature review to a conceptual framework for sustainable supply chain management. J Clean Prod 16:1699–1710CrossRef
go back to reference Shin H, Singh MP (2014) Minimum failure cost-based energy dissipation system designs for buildings in three seismic regions—part I: elements of failure cost analysis. Eng Struct 74:266–274CrossRef Shin H, Singh MP (2014) Minimum failure cost-based energy dissipation system designs for buildings in three seismic regions—part I: elements of failure cost analysis. Eng Struct 74:266–274CrossRef
go back to reference Simões C, Costa Pinto L, Simoes R, Bernardo CA (2013) Integrating environmental and economic life cycle analysis in product development: a material selection case study. Int J Life Cycle Assess 18:1734–1746CrossRef Simões C, Costa Pinto L, Simoes R, Bernardo CA (2013) Integrating environmental and economic life cycle analysis in product development: a material selection case study. Int J Life Cycle Assess 18:1734–1746CrossRef
go back to reference Sterner E (2000) Life-cycle costing and its use in the Swedish building sector. Build Res Inf 28:387–393CrossRef Sterner E (2000) Life-cycle costing and its use in the Swedish building sector. Build Res Inf 28:387–393CrossRef
go back to reference Stützle T, Hoos HH (2000) MAX–MIN ant system. Futur Gener Comput Syst 16:889–914CrossRef Stützle T, Hoos HH (2000) MAX–MIN ant system. Futur Gener Comput Syst 16:889–914CrossRef
go back to reference Sullivan WG, Claycombe WW (1977) Fundamentals of forecasting. Prentice Hall Sullivan WG, Claycombe WW (1977) Fundamentals of forecasting. Prentice Hall
go back to reference Swarr TE, Hunkeler D, Klöpffer W et al (2011) Environmental life-cycle costing: a code of practice. Int J Life Cycle Assess 16:389–391CrossRef Swarr TE, Hunkeler D, Klöpffer W et al (2011) Environmental life-cycle costing: a code of practice. Int J Life Cycle Assess 16:389–391CrossRef
go back to reference Tatikonda MV, Rosenthal SR (2000) Technology novelty, project complexity, and product development project execution success: a deeper look at task uncertainty in product innovation. IEEE Trans Eng Manag 47:74–87CrossRef Tatikonda MV, Rosenthal SR (2000) Technology novelty, project complexity, and product development project execution success: a deeper look at task uncertainty in product innovation. IEEE Trans Eng Manag 47:74–87CrossRef
go back to reference Terzi S, Serin S (2014) Planning maintenance works on pavements through ant colony optimization. Neural Comput Appl 25:143–153CrossRef Terzi S, Serin S (2014) Planning maintenance works on pavements through ant colony optimization. Neural Comput Appl 25:143–153CrossRef
go back to reference Tighe S (2001) Guidelines for probabilistic pavement life cycle cost analysis. Transp Res Rec 1769:28–38CrossRef Tighe S (2001) Guidelines for probabilistic pavement life cycle cost analysis. Transp Res Rec 1769:28–38CrossRef
go back to reference Töpfer A (2012) Wie kann ich mein wissenschaftliches Arbeiten erfolgreich organisieren? In: Erfolgreich Forschen. Springer, pp 367–402 Töpfer A (2012) Wie kann ich mein wissenschaftliches Arbeiten erfolgreich organisieren? In: Erfolgreich Forschen. Springer, pp 367–402
go back to reference Tranfield D, Denyer D, Smart P (2003) Towards a methodology for developing evidence-informed management knowledge by means of systematic review. Br J Manag 14:207–222CrossRef Tranfield D, Denyer D, Smart P (2003) Towards a methodology for developing evidence-informed management knowledge by means of systematic review. Br J Manag 14:207–222CrossRef
go back to reference Troldborg M, Heslop S, Hough RL (2014) Assessing the sustainability of renewable energy technologies using multi-criteria analysis: suitability of approach for national-scale assessments and associated uncertainties. Renew Sustain Energy Rev 39:1173–1184CrossRef Troldborg M, Heslop S, Hough RL (2014) Assessing the sustainability of renewable energy technologies using multi-criteria analysis: suitability of approach for national-scale assessments and associated uncertainties. Renew Sustain Energy Rev 39:1173–1184CrossRef
go back to reference US Environmental Protection Agency (1997) Exposure factors handbook. Unites States Environmental Protection Agency. Washington, DC US Environmental Protection Agency (1997) Exposure factors handbook. Unites States Environmental Protection Agency. Washington, DC
go back to reference Val DV (2007) Factors affecting life-cycle cost analysis of RC structures in chloride contaminated environments. J Infrastruct Syst 13:135–143CrossRef Val DV (2007) Factors affecting life-cycle cost analysis of RC structures in chloride contaminated environments. J Infrastruct Syst 13:135–143CrossRef
go back to reference van Noortwijk JM, Klatter HE (2004) The use of lifetime distributions in bridge maintenance and replacement modelling. Adv Probabilistic Mech Struct Reliab 82:1091–1099 van Noortwijk JM, Klatter HE (2004) The use of lifetime distributions in bridge maintenance and replacement modelling. Adv Probabilistic Mech Struct Reliab 82:1091–1099
go back to reference von Schomberg R (1993) Controversies and political decision making. In: Science, politics and morality. Springer, pp 7–26 von Schomberg R (1993) Controversies and political decision making. In: Science, politics and morality. Springer, pp 7–26
go back to reference Walker WE, Harremoës P, Rotmans J et al (2003) Defining uncertainty: a conceptual basis for uncertainty management in model-based decision support. Integr Assess 4:5–17CrossRef Walker WE, Harremoës P, Rotmans J et al (2003) Defining uncertainty: a conceptual basis for uncertainty management in model-based decision support. Integr Assess 4:5–17CrossRef
go back to reference Walls J, Smith M (1998) Life-cycle cost analysis in pavement design—interim technical bulletin Walls J, Smith M (1998) Life-cycle cost analysis in pavement design—interim technical bulletin
go back to reference Wen YK, Kang YJ (2001) Minimum building life-cycle cost design criteria. II: applications. J Struct Eng 127:338–346CrossRef Wen YK, Kang YJ (2001) Minimum building life-cycle cost design criteria. II: applications. J Struct Eng 127:338–346CrossRef
go back to reference Willuweit L, O’Sullivan JJ (2013) A decision support tool for sustainable planning of urban water systems: presenting the dynamic urban water simulation model. Water Res 47:7206–7220CrossRef Willuweit L, O’Sullivan JJ (2013) A decision support tool for sustainable planning of urban water systems: presenting the dynamic urban water simulation model. Water Res 47:7206–7220CrossRef
go back to reference Xu Y, Elgh F, Erkoyuncu JA et al (2012a) Cost engineering for manufacturing: current and future research. Int J Comput Integr Manuf 25:300–314CrossRef Xu Y, Elgh F, Erkoyuncu JA et al (2012a) Cost engineering for manufacturing: current and future research. Int J Comput Integr Manuf 25:300–314CrossRef
go back to reference Xu Y, Xie N, Li W et al (2012b) Phase behaviors and ordering dynamics of diblock copolymer self-assembly directed by lateral hexagonal confinement. J Chem Phys 137:194905CrossRef Xu Y, Xie N, Li W et al (2012b) Phase behaviors and ordering dynamics of diblock copolymer self-assembly directed by lateral hexagonal confinement. J Chem Phys 137:194905CrossRef
go back to reference Yoner N (2001) Major weapon systems acquisition and life cycle cost estimation: a case study. M.S. thesis, Naval Postgraduate School, Monterey, CA Yoner N (2001) Major weapon systems acquisition and life cycle cost estimation: a case study. M.S. thesis, Naval Postgraduate School, Monterey, CA
go back to reference Zadeh LA (1973) Outline of a new approach to the analysis of complex systems and decision processes. IEEE Trans Syst Man Cybern 28–44 Zadeh LA (1973) Outline of a new approach to the analysis of complex systems and decision processes. IEEE Trans Syst Man Cybern 28–44
go back to reference Zakeri B, Syri S (2015) Electrical energy storage systems: a comparative life cycle cost analysis. Renew Sustain Energy Rev 42:569–596CrossRef Zakeri B, Syri S (2015) Electrical energy storage systems: a comparative life cycle cost analysis. Renew Sustain Energy Rev 42:569–596CrossRef
go back to reference Zamagni A (2012) Life cycle sustainability assessment. Int J Life Cycle Assess 17:373–376CrossRef Zamagni A (2012) Life cycle sustainability assessment. Int J Life Cycle Assess 17:373–376CrossRef
Metadata
Title
Uncertainty in life cycle costing for long-range infrastructure. Part I: leveling the playing field to address uncertainties
Authors
Patrick Ilg
Christoph Scope
Stefan Muench
Edeltraud Guenther
Publication date
05-07-2016
Publisher
Springer Berlin Heidelberg
Published in
The International Journal of Life Cycle Assessment / Issue 2/2017
Print ISSN: 0948-3349
Electronic ISSN: 1614-7502
DOI
https://doi.org/10.1007/s11367-016-1154-1

Other articles of this Issue 2/2017