Skip to main content
Erschienen in: Innovative Infrastructure Solutions 1/2022

01.02.2022 | Practice-oriented paper

Facilitating claims settlement using building information modeling in the school building projects

verfasst von: Rehab Abdul Razzaq Ibraheem, Ahmed Mohammed Raoof Mahjoob

Erschienen in: Innovative Infrastructure Solutions | Ausgabe 1/2022

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Claims have a lot of space in construction projects, as they can have a considerable monetary value and thus negatively affect the final amount and duration of the project. This study seeks to suggest a building information modeling (BIM) approach to reduce most of the root causes of claims during the design phase. Thus, claims can be reduced during the project implementation phase. A questionnaire form was designed and distributed to 28 experts to obtain expert opinions on construction claims’ most important causes. In return, data were collected for 128 projects in Iraq, and the reasons for claims were extracted from them. After making the match between experts’ opinions and real projects, it was found that the match rate is high and that there are sixteen critical reasons for construction claims in Iraqi projects. After matching these causes with the BIM functions, a flowchart of each cause is drawn, and the inputs, tools, and outputs of the process are identified. The results showed the ability of BIM to prevent eight significant causes of claims (inaccurate quantities, excessive change orders, errors and design changes, flaws in drawings and specifications, and poor coordination between designers (structural, architectural, MEP)) through these BIM functions (3D visualization, clash detection, coordination, and take-off). The main results applied to a realistic case study show that BIM technology can be used as a precautionary approach during the design stage to reduce claims during implementation by (55.2%) so that the functions of this technology can solve the fundamental causes of claims in the construction projects sector in Iraq.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Abdul-Malak MAU, El-Saadi MMH, Abou-Zeid MG (2002) Process model for administrating construction claims. J Manag Eng 18(2):84–94CrossRef Abdul-Malak MAU, El-Saadi MMH, Abou-Zeid MG (2002) Process model for administrating construction claims. J Manag Eng 18(2):84–94CrossRef
3.
Zurück zum Zitat Alshdiefat A (2013) Evaluation of claims management, causes, impacts and resolution in building projects in Jordan. MSc Thesis, Al Isra University, Jordan Alshdiefat A (2013) Evaluation of claims management, causes, impacts and resolution in building projects in Jordan. MSc Thesis, Al Isra University, Jordan
5.
Zurück zum Zitat Love P, Davis P, Ellis J, Cheung SO (2010) Dispute causation: identification of pathogenic influences in construction. Eng Constr Archit Manag 17(4):404–423CrossRef Love P, Davis P, Ellis J, Cheung SO (2010) Dispute causation: identification of pathogenic influences in construction. Eng Constr Archit Manag 17(4):404–423CrossRef
6.
Zurück zum Zitat Brooker P, Lavers A (1997) Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Constr Manag Econ 15(6):519–526CrossRef Brooker P, Lavers A (1997) Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Constr Manag Econ 15(6):519–526CrossRef
7.
Zurück zum Zitat Al-Zwainy FMS, Jaber FK, Hachem SW (2018) Diagnostic of the claims and disputes between the contractor and owner in construction project using narrative analysis approach. Int J Civ Eng Technol 9(12):619–626 Al-Zwainy FMS, Jaber FK, Hachem SW (2018) Diagnostic of the claims and disputes between the contractor and owner in construction project using narrative analysis approach. Int J Civ Eng Technol 9(12):619–626
8.
Zurück zum Zitat Ali B, Zahoor H, Nasir AR, Maqsoom A, Khan RWA, Mazher KM (2020) BIM-based claims management system: a centralized information repository for extension of time claims. Autom Constr 110:102937CrossRef Ali B, Zahoor H, Nasir AR, Maqsoom A, Khan RWA, Mazher KM (2020) BIM-based claims management system: a centralized information repository for extension of time claims. Autom Constr 110:102937CrossRef
9.
Zurück zum Zitat Jalal MP, Roushan TY, Noorzai E, Alizadeh M (2020) A BIM-based construction claim management model for early identification and visualization of claims. Smart Sustain Built Environ 10(2):227–257CrossRef Jalal MP, Roushan TY, Noorzai E, Alizadeh M (2020) A BIM-based construction claim management model for early identification and visualization of claims. Smart Sustain Built Environ 10(2):227–257CrossRef
10.
Zurück zum Zitat Mahdi MM, Wali KI, Yuosif BA (2020) Minimizing time and cost in the Iraqi AEC industry by adopting building information modeling (BIM) technique. Zanco J Pure Appl Sci 32(6):185–196 Mahdi MM, Wali KI, Yuosif BA (2020) Minimizing time and cost in the Iraqi AEC industry by adopting building information modeling (BIM) technique. Zanco J Pure Appl Sci 32(6):185–196
11.
Zurück zum Zitat Dastyar B, Esfahani AF, Askarifard M, Abbasi AM (2018) Identification, prioritization and management of construction project claims. J Eng Proj Prod Manag 8(2):90–96 Dastyar B, Esfahani AF, Askarifard M, Abbasi AM (2018) Identification, prioritization and management of construction project claims. J Eng Proj Prod Manag 8(2):90–96
13.
Zurück zum Zitat Bakhary NA, Adnan H, Ibrahim A (2015) A study of construction claim management problems in Malaysia. Procedia Econ Finance 23:63–70CrossRef Bakhary NA, Adnan H, Ibrahim A (2015) A study of construction claim management problems in Malaysia. Procedia Econ Finance 23:63–70CrossRef
14.
Zurück zum Zitat Chou J-S, Hsu S-C, Lin C-W, Chang Y-C (2016) Classifying influential information to discover rule sets for project disputes and possible resolutions. Int J Proj Manag 34(8):1706–1716CrossRef Chou J-S, Hsu S-C, Lin C-W, Chang Y-C (2016) Classifying influential information to discover rule sets for project disputes and possible resolutions. Int J Proj Manag 34(8):1706–1716CrossRef
15.
Zurück zum Zitat Ibraheem RAR, Mahjoob AMR (2021) Exploring the causes of claims during the project life cycle in the Iraqi construction sector. Des Eng 2021(4):382–400 Ibraheem RAR, Mahjoob AMR (2021) Exploring the causes of claims during the project life cycle in the Iraqi construction sector. Des Eng 2021(4):382–400
16.
Zurück zum Zitat Vandezande J, Read P, Krygiel E (2011) Mastering autodesk revit architecture 2012. Wiley, Hoboken Vandezande J, Read P, Krygiel E (2011) Mastering autodesk revit architecture 2012. Wiley, Hoboken
17.
Zurück zum Zitat Rasheed RH, Rezouki SE (2012) Application of geographic information system for preparing the bill of quantities of construction projects. J Eng 18(8):979–988 Rasheed RH, Rezouki SE (2012) Application of geographic information system for preparing the bill of quantities of construction projects. J Eng 18(8):979–988
Metadaten
Titel
Facilitating claims settlement using building information modeling in the school building projects
verfasst von
Rehab Abdul Razzaq Ibraheem
Ahmed Mohammed Raoof Mahjoob
Publikationsdatum
01.02.2022
Verlag
Springer International Publishing
Erschienen in
Innovative Infrastructure Solutions / Ausgabe 1/2022
Print ISSN: 2364-4176
Elektronische ISSN: 2364-4184
DOI
https://doi.org/10.1007/s41062-021-00646-2

Weitere Artikel der Ausgabe 1/2022

Innovative Infrastructure Solutions 1/2022 Zur Ausgabe