From First Planner to Last Planner

Applying a Capability Model to Measure the Maturity of the Planning Process in ETO

verfasst von : Gabriele Hofinger Jünge, Kristina Kjersem, Mikhail Shlopak, Erlend Alfnes, Lise Lillebrygfjeld Halse

Erschienen in: Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Engineered-to-order (ETO) networks are dynamic and hard to define, and their planning and control functionalities are commonly affected by the actions of suppliers and customers. Frequently, projects experience delays, budget overruns, and quality defects. Consequently, there is a need for project management that synchronizes engineering and production processes throughout the network.
The aim of this study is to develop a project planning maturity model (MMPP) in order to improve project performance in ETO manufacturing networks. Moreover, a multiple case study approach is used to test the applicability of the developed maturity model. The results of the case studies from three ETO case companies show that there is (1) no or low degree of standardization of the planning processes, and (2) there is little or no integration between engineering and production planning processes.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Pinto, J.K., Slevin, D.P.: Critical success factors accross the project life cycle. Proj. Manage. J. 19, 67–75 (1988) Pinto, J.K., Slevin, D.P.: Critical success factors accross the project life cycle. Proj. Manage. J. 19, 67–75 (1988)
2.
Zurück zum Zitat Cook-Davies, T.: The “real” success factors on projects. Int. J. Proj. Manage. 2002, 185–190 (2002)CrossRef Cook-Davies, T.: The “real” success factors on projects. Int. J. Proj. Manage. 2002, 185–190 (2002)CrossRef
3.
Zurück zum Zitat Andersen, E.S., Jessen, S.A.: Project maturity in organisations. Int. J. Proj. Manage. 21, 457–461 (2003)CrossRef Andersen, E.S., Jessen, S.A.: Project maturity in organisations. Int. J. Proj. Manage. 21, 457–461 (2003)CrossRef
4.
Zurück zum Zitat Hicks, C., McGovern, T., Earl, C.F.: Supply chain management: a strategic issue in engineer to order manufacturing. Int. J. Prod. Econ. 65, 179–190 Hicks, C., McGovern, T., Earl, C.F.: Supply chain management: a strategic issue in engineer to order manufacturing. Int. J. Prod. Econ. 65, 179–190
5.
Zurück zum Zitat Hao, Q., Shen, W., Neelamkavil, J., Thomas, R.: Change management in construction projects: NRC Institute for Research in Construction, NRCC-50325 (2008) Hao, Q., Shen, W., Neelamkavil, J., Thomas, R.: Change management in construction projects: NRC Institute for Research in Construction, NRCC-50325 (2008)
6.
Zurück zum Zitat Wasmer, A., Staub, G., Vroom, W.: An industry approach to shared, cross-organisational engineering change handling-the road towards standards for product data processing. Comput. Aided Des. 43, 533–545 (2011)CrossRef Wasmer, A., Staub, G., Vroom, W.: An industry approach to shared, cross-organisational engineering change handling-the road towards standards for product data processing. Comput. Aided Des. 43, 533–545 (2011)CrossRef
7.
Zurück zum Zitat Huang, G., Yee, W., Mak, K.: Development of a web-based system for engineering change management. Robot. Comput. Integr. Manuf. 17, 255–267 (2001)CrossRef Huang, G., Yee, W., Mak, K.: Development of a web-based system for engineering change management. Robot. Comput. Integr. Manuf. 17, 255–267 (2001)CrossRef
8.
Zurück zum Zitat Little, D., Rollings, R., Peck, M., Porter, J.K.: Integrated planning and scheduling in the engineering-to-order sector. Int. J. Comput. Integr. Manuf. 13, 545–554 (2000)CrossRef Little, D., Rollings, R., Peck, M., Porter, J.K.: Integrated planning and scheduling in the engineering-to-order sector. Int. J. Comput. Integr. Manuf. 13, 545–554 (2000)CrossRef
9.
Zurück zum Zitat Hicks, C., Braiden, P.: Computer-aided production management issues in the engineering-to-order production of complex capital goods explored using a simulation approach. Int. J. Prod. Res. 38, 4783–4810 (2000)MATHCrossRef Hicks, C., Braiden, P.: Computer-aided production management issues in the engineering-to-order production of complex capital goods explored using a simulation approach. Int. J. Prod. Res. 38, 4783–4810 (2000)MATHCrossRef
10.
Zurück zum Zitat Arica, E., Alfnes, E.: A concept for project manufacturing planning and control. In: Seventeenth International Working Seminar on Production Economics, Innsbruck, Austria (2012) Arica, E., Alfnes, E.: A concept for project manufacturing planning and control. In: Seventeenth International Working Seminar on Production Economics, Innsbruck, Austria (2012)
11.
Zurück zum Zitat Sumara, J., Goodpasture, J.: Earned value-the next generation - a practical application for commercial projects. In: Project Management Institute 28th annual Seminars and Symposium, Chicago (1997) Sumara, J., Goodpasture, J.: Earned value-the next generation - a practical application for commercial projects. In: Project Management Institute 28th annual Seminars and Symposium, Chicago (1997)
12.
Zurück zum Zitat Flemming, Q.W., Koppelman, J.M.: Using earned value management. Cost Eng. 44, 32–36 (2002) Flemming, Q.W., Koppelman, J.M.: Using earned value management. Cost Eng. 44, 32–36 (2002)
13.
Zurück zum Zitat Koskela, L.: Application of the new production philosophy to construction. Standford University, CIFE (1992) Koskela, L.: Application of the new production philosophy to construction. Standford University, CIFE (1992)
14.
Zurück zum Zitat Halse Lillebrydfjeld, L., Kjersem, K., Emblemsvåg, J.: Implementation of lean project planning: a knowledge transfer perspective. In: APMS (2001) Halse Lillebrydfjeld, L., Kjersem, K., Emblemsvåg, J.: Implementation of lean project planning: a knowledge transfer perspective. In: APMS (2001)
15.
Zurück zum Zitat Ballard, H.G.: The last planner system of production control. PhD, Faculty of Engineering, University of Birmingham, Birmingham (2000) Ballard, H.G.: The last planner system of production control. PhD, Faculty of Engineering, University of Birmingham, Birmingham (2000)
16.
Zurück zum Zitat Kjersem, K., Emblemsvåg, J.: Literature review on planning design and engineering activities in shipbuilding. In: 22nd Annual Conference of the International Group for Lean Construction, pp. 677–688, Oslo, Norway (2014) Kjersem, K., Emblemsvåg, J.: Literature review on planning design and engineering activities in shipbuilding. In: 22nd Annual Conference of the International Group for Lean Construction, pp. 677–688, Oslo, Norway (2014)
17.
Zurück zum Zitat Kalsaas, B.T.: Integration of collaborative LPS-inspired and rationalistic planning processes in mechanical engineering of offshore drilling constructions. In: Annual Conference of the International Group for Lean Construction (2013) Kalsaas, B.T.: Integration of collaborative LPS-inspired and rationalistic planning processes in mechanical engineering of offshore drilling constructions. In: Annual Conference of the International Group for Lean Construction (2013)
18.
Zurück zum Zitat Emblemsvåg, J.: Lean project planning in shipbuilding. J. Ship Prod. Des. 30, 1–10 (2014)CrossRef Emblemsvåg, J.: Lean project planning in shipbuilding. J. Ship Prod. Des. 30, 1–10 (2014)CrossRef
19.
Zurück zum Zitat Wendler, R.: The maturity of maturity model research: a systematic mapping study. Inf. Softw. Technol. 54, 1317–1339 (2012)CrossRef Wendler, R.: The maturity of maturity model research: a systematic mapping study. Inf. Softw. Technol. 54, 1317–1339 (2012)CrossRef
20.
Zurück zum Zitat Becker, J., Knackstedt, J., Pöppelbuss, J.: Developing maturity models for IT management - a procedure model and its application. Bus. Inf. Syst. Eng. 1, 213–222 (2009)CrossRef Becker, J., Knackstedt, J., Pöppelbuss, J.: Developing maturity models for IT management - a procedure model and its application. Bus. Inf. Syst. Eng. 1, 213–222 (2009)CrossRef
21.
Zurück zum Zitat Yin, R.K.: Case Study Research: Design and Method. Sage Publications, Los Angeles (2009) Yin, R.K.: Case Study Research: Design and Method. Sage Publications, Los Angeles (2009)
22.
Zurück zum Zitat Ellram, L.M.: The use of the case study method in logistics research. J. Bus. Logistics 17, 93–138 (1996) Ellram, L.M.: The use of the case study method in logistics research. J. Bus. Logistics 17, 93–138 (1996)
23.
Zurück zum Zitat Bitici, U.S., Garengo, P., Ates, A., Nudurupati, S.S.: Value of maturity models in performance measurement. Int. J. Prod. Res. 53(10), 3062–3085 (2015)CrossRef Bitici, U.S., Garengo, P., Ates, A., Nudurupati, S.S.: Value of maturity models in performance measurement. Int. J. Prod. Res. 53(10), 3062–3085 (2015)CrossRef
Metadaten
Titel
From First Planner to Last Planner
verfasst von
Gabriele Hofinger Jünge
Kristina Kjersem
Mikhail Shlopak
Erlend Alfnes
Lise Lillebrygfjeld Halse
Copyright-Jahr
2015
DOI
https://doi.org/10.1007/978-3-319-22759-7_28