Skip to main content

1994 | OriginalPaper | Buchkapitel

Generating System Adequacy Assessment

verfasst von : Roy Billinton, Wenyuan Li

Erschienen in: Reliability Assessment of Electric Power Systems Using Monte Carlo Methods

Verlag: Springer US

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Generating system adequacy assessment (HL1) is used to evaluate the ability of the system generating capacity to satisfy the total system load. This assessment can be conducted using either an analytical technique or the Monte Carlo method. A considerable number of papers involving analytical techniques are listed in References.(1–7) This chapter does not attempt to reiterate these analytical techniques but focuses an application of the Monte Carlo method in generating system adequacy assessment. Monte Carlo simulation can be considered to be more preferable than an analytical approach in situations which involve, for example, the following considerations: 1.Time-dependent or chronological issues are considered.2.The duty cycle of peaking units are modeled.3.Nonexponential component state duration distributions are considered.4.Distributions of reliability indices are required.5.A large unacceptable set of states (unfeasible range) in multi-area generation system studies is involved.

Metadaten
Titel
Generating System Adequacy Assessment
verfasst von
Roy Billinton
Wenyuan Li
Copyright-Jahr
1994
Verlag
Springer US
DOI
https://doi.org/10.1007/978-1-4899-1346-3_4

Neuer Inhalt