Erschienen in: Rock Mechanics and Rock Engineering 2/2021

12.11.2020 | Original Paper

Ground Saturation Response During First Filling of Lined Pressure Tunnels: A Case Study

verfasst von: Saeed Ahmad, Abdul Muntaqim Naji, Ijaz Hussain, Hafeezur Rehman, Hankyu Yoo

Erschienen in: Rock Mechanics and Rock Engineering | Ausgabe 2/2021

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The Neelum–Jhelum Hydropower Project, commissioned in April 2018 and located in the Azad Kashmir region of northeast Pakistan, is one of the most challenging and technically complex projects in the region. The project’s 28.6 km headrace tunnels are constructed in a highly mountainous region with relatively complex geology that includes various sedimentary rocks of Murree formation. The hydro-mechanical behavior of the deep headrace tunnels with a maximum overburden of 2000 m and underground powerhouse at a depth of 450 m are of particular interest. The project generates electricity by diverting water from the Neelum River to an underground powerhouse through a tunnel system crossing beneath the Jhelum River. The pressurization of the hydraulic tunnels was an important milestone and necessitated intentional planning down to the smallest detail for the first filling. Successful filling was a governing criterion for proper functioning of the tunnel lining that was supplemented by monitoring instruments, a drainage system, and ground treatments during construction of the project. Ground re-saturation during the first filling of the concrete and shotcrete-lined waterways constructed in the diversified rock mass is interesting to study. The rock mass in this area is sheared and fractured, with open fissures. In this study, we investigated the ground re-saturation and water leakages in adits, plugs, and surface outflow after the first filling of the headrace tunnel. A load rejection test was conducted to evaluate overall fitness of the power waterways, plant, and to study any change in leakages due to sudden oscillation in the waterway tunnels. Surfer3D software was used to analyze the data collected from the piezometers, which showed abnormal water pressure built up in a localized zone between penstocks three and four. This study was also supported with two-dimensional finite element modeling of the project, at a location where the tunnel has minimum rock cover susceptible to hydrojacking. Numerical analysis results were compared with field data results during the first filling process and both showed close proximity.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Abbasi AH (2014) Pakistan energy vision, 2035, SDPI Abbasi AH (2014) Pakistan energy vision, 2035, SDPI
Zurück zum Zitat Esteves C, Plasencia N, Pinto P, Marques T (2017) First filling of hydraulic tunnels of Venda Nova III hydropower scheme. In: Proceedings of the World Tunnel Congress. Bergen, Norway Esteves C, Plasencia N, Pinto P, Marques T (2017) First filling of hydraulic tunnels of Venda Nova III hydropower scheme. In: Proceedings of the World Tunnel Congress. Bergen, Norway
Zurück zum Zitat Fernández G (1994) Behavior of pressure tunnels and guidelines for liner design. J Geotech Eng 120:1768–1791CrossRef Fernández G (1994) Behavior of pressure tunnels and guidelines for liner design. J Geotech Eng 120:1768–1791CrossRef
Zurück zum Zitat Golden Software (2010) Surfer 3D. Golden, Colorado: Golden Software, LLC Golden Software (2010) Surfer 3D. Golden, Colorado: Golden Software, LLC
Zurück zum Zitat Holmøy KH (2008) Significance of geologicalparameters for predicting waterleakage in hard rock tunnels Holmøy KH (2008) Significance of geologicalparameters for predicting waterleakage in hard rock tunnels
Zurück zum Zitat Lamas LN, Leitão NS, Esteves C, Plasencia N (2014) First infilling of the Venda Nova II unlined high-pressure tunnel: observed behaviour and numerical modelling. Rock Mech Rock Eng 47:885–904CrossRef Lamas LN, Leitão NS, Esteves C, Plasencia N (2014) First infilling of the Venda Nova II unlined high-pressure tunnel: observed behaviour and numerical modelling. Rock Mech Rock Eng 47:885–904CrossRef
Zurück zum Zitat Lipponen A, Manninen S, Niini H, Rönkä E (2005) Effect of water and geological factors on the long-term stability of fracture zones in the Päijänne Tunnel, Finland: a case study. Int J Rock Mech Min Sci 42:3–12CrossRef Lipponen A, Manninen S, Niini H, Rönkä E (2005) Effect of water and geological factors on the long-term stability of fracture zones in the Päijänne Tunnel, Finland: a case study. Int J Rock Mech Min Sci 42:3–12CrossRef
Zurück zum Zitat Marence M (2008) Numerical modelling and design of pressure tunnels. In: Proceedings of the international conference HYDRO, 2008 Marence M (2008) Numerical modelling and design of pressure tunnels. In: Proceedings of the international conference HYDRO, 2008
Zurück zum Zitat Merritt AH (1999) Geologic and geotechnical considerations for pressure tunnel design. In: Geo-engineering for underground facilities, 1999, ASCE, pp 66–81 Merritt AH (1999) Geologic and geotechnical considerations for pressure tunnel design. In: Geo-engineering for underground facilities, 1999, ASCE, pp 66–81
Zurück zum Zitat Naji AM, Emad MZ, Rehman H, Yoo H (2019) Geological and geomechanical heterogeneity in deep hydropower tunnels: a rock burst failure case study. Tunn Undergr Space Technol 84:507–521CrossRef Naji AM, Emad MZ, Rehman H, Yoo H (2019) Geological and geomechanical heterogeneity in deep hydropower tunnels: a rock burst failure case study. Tunn Undergr Space Technol 84:507–521CrossRef
Zurück zum Zitat Panthi KK (2006) Analysis of engineering geological uncertainties related to tunnelling in Himalayan rock mass conditions Panthi KK (2006) Analysis of engineering geological uncertainties related to tunnelling in Himalayan rock mass conditions
Zurück zum Zitat Panthi KK, Basnet CB (2019) Leakage potential through a shotcrete lined high-pressure headrace tunnel-An analysis on a case from Nepal. In: Rock mechanics for natural resources and infrastructure development Panthi KK, Basnet CB (2019) Leakage potential through a shotcrete lined high-pressure headrace tunnel-An analysis on a case from Nepal. In: Rock mechanics for natural resources and infrastructure development
Zurück zum Zitat ROCSCIENCE (1998) Phase2 User's Guide. Toronto, Ontario, Canada (1998): Rocscience Inc. ROCSCIENCE (1998) Phase2 User's Guide. Toronto, Ontario, Canada (1998): Rocscience Inc.
Zurück zum Zitat Rothfuss BD, Bednarz SL, Clarke ES (2010) Water tunnel condition assessment: a comprehensive approach to evaluating reliability. Jacobs Associates Rothfuss BD, Bednarz SL, Clarke ES (2010) Water tunnel condition assessment: a comprehensive approach to evaluating reliability. Jacobs Associates
Zurück zum Zitat Schleiss A (1986) Design of pervious pressure tunnels. Water Power Dam Constr 38:21–26 Schleiss A (1986) Design of pervious pressure tunnels. Water Power Dam Constr 38:21–26
Zurück zum Zitat Sharp JC, Gonano LP (1982) Rock engineering aspects of the concrete lined pressure tunnels of the Drakensberg pumped storage scheme. In: ISRM International Symposium, 1982. International Society for Rock Mechanics and Rock Engineering Sharp JC, Gonano LP (1982) Rock engineering aspects of the concrete lined pressure tunnels of the Drakensberg pumped storage scheme. In: ISRM International Symposium, 1982. International Society for Rock Mechanics and Rock Engineering
Zurück zum Zitat Sinha RS (2012) Underground structures: design and instrumentation. Elsevier, Amsterdam Sinha RS (2012) Underground structures: design and instrumentation. Elsevier, Amsterdam
Zurück zum Zitat Wang T, Hu W, Wu H, Zhou W, Su K, Cheng L (2018) Seepage analysis of a diversion tunnel with high pressure in different periods: a case study. Eur J Environ Civ Eng 22:386–404CrossRef Wang T, Hu W, Wu H, Zhou W, Su K, Cheng L (2018) Seepage analysis of a diversion tunnel with high pressure in different periods: a case study. Eur J Environ Civ Eng 22:386–404CrossRef
Metadaten
Titel
Ground Saturation Response During First Filling of Lined Pressure Tunnels: A Case Study
verfasst von
Saeed Ahmad
Abdul Muntaqim Naji
Ijaz Hussain
Hafeezur Rehman
Hankyu Yoo
Publikationsdatum
12.11.2020
Verlag
Springer Vienna
Erschienen in
Rock Mechanics and Rock Engineering / Ausgabe 2/2021
Print ISSN: 0723-2632
Elektronische ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-020-02296-9

Weitere Artikel der Ausgabe 2/2021

Rock Mechanics and Rock Engineering 2/2021 Zur Ausgabe