Skip to main content
Erschienen in:
Buchtitelbild

2017 | OriginalPaper | Buchkapitel

Hard Planning and Scheduling Problems in the Digital Factory

verfasst von : Tamás Kis, Márton Drótos

Erschienen in: Math for the Digital Factory

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Production planning and scheduling with the aid of software tools in today’s manufacturing industries have become a common practice which is indispensable for providing high level customer service, and at the same time to utilize the production resources, like workforce, machine tools, raw materials, energy, etc., efficiently. To meet the new requirements, problem modeling tools, optimization techniques, and visualization of data and results have become part of the software packages. In this chapter some recent developments in problem modeling and optimization techniques applied to important and challenging industrial planning and scheduling problems are presented. We will focus on new problem areas which are still at the edge of current theoretical research, but they are motivated by practical needs. On the one hand, we will discuss project based production planning, and on the other hand, we will tackle a resource leveling problems in a machine environment. We will present the problems, some modeling and solution approaches, and various extensions and applications.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Alfieri, A., Tolio, T., Urgo, M.: A project scheduling approach to production planning with feeding precedence relations. Int. J. Prod. Res. 49, 995–1020 (2011)CrossRef Alfieri, A., Tolio, T., Urgo, M.: A project scheduling approach to production planning with feeding precedence relations. Int. J. Prod. Res. 49, 995–1020 (2011)CrossRef
2.
Zurück zum Zitat Ballestín, F., Schwindt, C., Zimmermann, J.: Resource leveling in make-to-order production: modeling and heuristic solution method. Int. J. Oper. Res. 4, 50–62 (2007)MATH Ballestín, F., Schwindt, C., Zimmermann, J.: Resource leveling in make-to-order production: modeling and heuristic solution method. Int. J. Oper. Res. 4, 50–62 (2007)MATH
3.
Zurück zum Zitat Barnhart, C., Johnson, E.E., Nemhauser, G.E., Savelsbergh, M.W.P., Vance, P.H.: Branch-and-price: column generation for solving huge integer programs. Oper. Res. 46, 316–329 (1998)CrossRefMathSciNetMATH Barnhart, C., Johnson, E.E., Nemhauser, G.E., Savelsbergh, M.W.P., Vance, P.H.: Branch-and-price: column generation for solving huge integer programs. Oper. Res. 46, 316–329 (1998)CrossRefMathSciNetMATH
4.
Zurück zum Zitat Bianco, L., Caramia, M.: Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound. 4OR-Q. J. Oper. Res. 9, 371–389 (2011) Bianco, L., Caramia, M.: Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound. 4OR-Q. J. Oper. Res. 9, 371–389 (2011)
5.
Zurück zum Zitat Blazewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., Weglarz, J.: Handbook on Scheduling. From Theory to Applications. Springer, Berlin (2007)MATH Blazewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., Weglarz, J.: Handbook on Scheduling. From Theory to Applications. Springer, Berlin (2007)MATH
6.
Zurück zum Zitat Bracht, U., Masurat, T.: The digital factory between vision and reality. Comput. Ind. 56 325–333 (2005)CrossRef Bracht, U., Masurat, T.: The digital factory between vision and reality. Comput. Ind. 56 325–333 (2005)CrossRef
7.
Zurück zum Zitat Brucker, P.: Scheduling Algorithms, 5th edn. Springer, Berlin (2007)MATH Brucker, P.: Scheduling Algorithms, 5th edn. Springer, Berlin (2007)MATH
8.
Zurück zum Zitat de Boer, R., Schutten, J.M.J.: Multi-project rough-cut capacity planning. In: Ashayeri, J., Sullivan, W.G., Munir Ahmad, M. (eds.) Flexible Automation and Intelligent Manufacturing, pp. 631–644, Begell House, New York (1999) de Boer, R., Schutten, J.M.J.: Multi-project rough-cut capacity planning. In: Ashayeri, J., Sullivan, W.G., Munir Ahmad, M. (eds.) Flexible Automation and Intelligent Manufacturing, pp. 631–644, Begell House, New York (1999)
9.
Zurück zum Zitat Demeulemeester, E.L., Herroelen, W.S.: Project Scheduling: A Research Handbook. International Series in Operations Research & Management Science, vol. 49 (Kluwer Academic, Dordrecht, 2002) Demeulemeester, E.L., Herroelen, W.S.: Project Scheduling: A Research Handbook. International Series in Operations Research & Management Science, vol. 49 (Kluwer Academic, Dordrecht, 2002)
11.
Zurück zum Zitat Easa, S.M.: Resource leveling in construction by optimization. J. Constr. Eng. Manag. 115, 302–316 (1998)CrossRef Easa, S.M.: Resource leveling in construction by optimization. J. Constr. Eng. Manag. 115, 302–316 (1998)CrossRef
12.
Zurück zum Zitat Gademann, N., Schutten, M.: Linear-programming-based heuristics for project capacity planning. IIE Trans. 37, 153–165 (2005)CrossRef Gademann, N., Schutten, M.: Linear-programming-based heuristics for project capacity planning. IIE Trans. 37, 153–165 (2005)CrossRef
13.
Zurück zum Zitat Gahm, C., Dünnwald, B., Sahamie, R.: A multi-criteria master production scheduling approach for special purpose machinery. Int. J. Prod. Econ. 149, 89–101 (2014)CrossRef Gahm, C., Dünnwald, B., Sahamie, R.: A multi-criteria master production scheduling approach for special purpose machinery. Int. J. Prod. Econ. 149, 89–101 (2014)CrossRef
14.
Zurück zum Zitat Hans, E.W.: Resource loading by branch-and-price techniques. Ph.D. Thesis, Twente University Press (2001) Hans, E.W.: Resource loading by branch-and-price techniques. Ph.D. Thesis, Twente University Press (2001)
15.
Zurück zum Zitat Kis, T.: A branch-and-cut algorithm for scheduling of projects with variable intensity activities. Math. Program. 103, 515–539 (2005)CrossRefMathSciNetMATH Kis, T.: A branch-and-cut algorithm for scheduling of projects with variable intensity activities. Math. Program. 103, 515–539 (2005)CrossRefMathSciNetMATH
16.
Zurück zum Zitat Kis, T.: RCPS with variable intensity activities and feeding precedence constraints, In: Józefowska, J., Weglarz, J. (eds.) Perspectives in Modern Project Scheduling, pp. 105–129. Springer, New York (2006) Kis, T.: RCPS with variable intensity activities and feeding precedence constraints, In: Józefowska, J., Weglarz, J. (eds.) Perspectives in Modern Project Scheduling, pp. 105–129. Springer, New York (2006)
17.
Zurück zum Zitat Monostori, L.: Cyber-physical production systems: roots, expectations and R&D challenges. Proc. CIRP 17 9–13 (2014)CrossRef Monostori, L.: Cyber-physical production systems: roots, expectations and R&D challenges. Proc. CIRP 17 9–13 (2014)CrossRef
18.
Zurück zum Zitat Naber, A., Kolisch, R.: MIP models for resource-constrained project scheduling with flexible resource profiles. Eur. J. Oper. Res. 239, 335–348 (2014)CrossRefMathSciNetMATH Naber, A., Kolisch, R.: MIP models for resource-constrained project scheduling with flexible resource profiles. Eur. J. Oper. Res. 239, 335–348 (2014)CrossRefMathSciNetMATH
19.
Zurück zum Zitat Neuamm, K., Zimmermann, J.: Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur. J. Oper. Res. 127, 425–443 (2000)CrossRefMATH Neuamm, K., Zimmermann, J.: Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur. J. Oper. Res. 127, 425–443 (2000)CrossRefMATH
20.
Zurück zum Zitat Rager, M., Gahm, C., Denz, F.: Energy-oriented scheduling based on evolutionary algorithms. Comput. Oper. Res. 54, 218–231 (2015)CrossRefMathSciNetMATH Rager, M., Gahm, C., Denz, F.: Energy-oriented scheduling based on evolutionary algorithms. Comput. Oper. Res. 54, 218–231 (2015)CrossRefMathSciNetMATH
21.
Zurück zum Zitat Ranjbar, M.: A path-relinking metaheuristic for the resource levelling problem. J. Oper. Res. Soc. 64, 1071–1078 (2013)CrossRef Ranjbar, M.: A path-relinking metaheuristic for the resource levelling problem. J. Oper. Res. Soc. 64, 1071–1078 (2013)CrossRef
22.
Zurück zum Zitat Wolsey, L.A.: Integer Programming. Wiley-Interscience Series in Discrete Mathematics and Optimization. Wiley, New York (1998)MATH Wolsey, L.A.: Integer Programming. Wiley-Interscience Series in Discrete Mathematics and Optimization. Wiley, New York (1998)MATH
23.
Zurück zum Zitat Wörn, H., Frey, D., Keitel, J.: Digital factory – planning and running enterprises of the future. In: Proceedings of IECON 2000, 26th Annual symposium of the IEEE, Nagoya, 22 Oct 2000–28 Oct 2000, vol 2, pp. 1286–1291 Wörn, H., Frey, D., Keitel, J.: Digital factory – planning and running enterprises of the future. In: Proceedings of IECON 2000, 26th Annual symposium of the IEEE, Nagoya, 22 Oct 2000–28 Oct 2000, vol 2, pp. 1286–1291
24.
Zurück zum Zitat Wullink, G.: Resource loading under uncertainty. PhD Thesis, Twente University Press (2005) Wullink, G.: Resource loading under uncertainty. PhD Thesis, Twente University Press (2005)
Metadaten
Titel
Hard Planning and Scheduling Problems in the Digital Factory
verfasst von
Tamás Kis
Márton Drótos
Copyright-Jahr
2017
DOI
https://doi.org/10.1007/978-3-319-63957-4_1

Neuer Inhalt