Skip to main content

2023 | OriginalPaper | Buchkapitel

How has COVID-19 Pandemic Influenced the Quality Assurance of Cross-Border Construction Logistics and Supply Chain? A Conceptual Analysis Based on Ishikawa Diagram

verfasst von : Frank Ato Ghansah, Weisheng Lu, Benjamin Kwaku Ababio, Jinfeng Lou

Erschienen in: Proceedings of the 27th International Symposium on Advancement of Construction Management and Real Estate

Verlag: Springer Nature Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The coronavirus disease (COVID-19) has momentously affected the construction industry. The COVID-19 mitigation measures, in as much as they minimise the pandemic infections, likewise have disrupted the supply of materials, manufacturing, human resource availability, the workers’ close coordination, communications, and work execution. To this end, how the COVID-19 mitigation measures have affected the quality assurance (QA) of cross-border construction logistics and supply chain (Cb-CLSC) is not known clearly. This study addresses this knowledge gap. A conceptual analysis research method is adopted by engaging a desk literature review approach and Ishikawa diagram to identify and map the COVID-19 mitigation measures to their impacts on the QA of Cb-CLSC. The study identified COVID-19 mitigation measures and reaffirmed their negative and positive influences on the QA of Cb-CLSC toward developing an adequate QA system of Cb-CLSC for post-pandemic actions and to survive future pandemics. The COVID-19 mitigation measures include “lockdown”, “social distancing”, “travelling restrictions”, “workplace capacity Limit”, “use of personal protective equipment”, and “quarantine days”. Finally, an Ishikawa diagram-oriented conceptual framework is proposed by mapping the six COVID-19 mitigation measures to their potential impacts (positive and negative) on the QA of Cb-CLSC. The study makes a unique contribution to the body of knowledge by (1) evaluating the COVID-19 mitigation measures to illustrate how they have impacted the QA of Cb-CLSC and (2) proposing a conceptual framework based on the Ishikawa diagram that maps to understand how the COVID-19 mitigations measures have positively and negatively impacted the QA of CB-CLSC. The results of this study can assist practitioners in formulating a collaborative effort to embrace the pandemic for the post-pandemic era and successfully endure the risks of future pandemics.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Mawhinney, M.: International Construction. Wiley, Hoboken (2008) Mawhinney, M.: International Construction. Wiley, Hoboken (2008)
2.
Zurück zum Zitat International Organisation for Standardisation (ISO). Quality management and quality assurance—Vocabulary, International Organization for Standardization (1994) International Organisation for Standardisation (ISO). Quality management and quality assurance—Vocabulary, International Organization for Standardization (1994)
3.
Zurück zum Zitat Khan, A.H., Azhar, S., Mahmood, A.: Quality assurance and control in the construction of infrastructure services in developing countries–a case study of Pakistan. In: First International Conference on Construction in Developing Countries (ICCIDC-I) (2008) Khan, A.H., Azhar, S., Mahmood, A.: Quality assurance and control in the construction of infrastructure services in developing countries–a case study of Pakistan. In: First International Conference on Construction in Developing Countries (ICCIDC-I) (2008)
4.
Zurück zum Zitat Chung, H.W.: Understanding Quality Assurance in Construction: A Practical Guide to ISO 9000 for Contractors.Routledge. Building Designs (51154), pp. 1–6. IEEE (2002) Chung, H.W.: Understanding Quality Assurance in Construction: A Practical Guide to ISO 9000 for Contractors.Routledge. Building Designs (51154), pp. 1–6. IEEE (2002)
10.
Zurück zum Zitat Liliana, L.: A new model of Ishikawa diagram for quality assessment. In: IOP Conference Series: Materials Science and Engineering, vol. 161, no. 1, p. 012099. IOP Publishing (2016) Liliana, L.: A new model of Ishikawa diagram for quality assessment. In: IOP Conference Series: Materials Science and Engineering, vol. 161, no. 1, p. 012099. IOP Publishing (2016)
11.
Zurück zum Zitat PMBOK (2017), A Guide to the Project Management Body of Knowledge (PMBOK Guide) (Project Management Institute), Project Management Institute, 6th Edition, Inc. USA. PMBOK (2017), A Guide to the Project Management Body of Knowledge (PMBOK Guide) (Project Management Institute), Project Management Institute, 6th Edition, Inc. USA.
13.
Zurück zum Zitat Charehzehi, A., Chai, C., Md Yusof, A., Chong, H.Y., Loo, S.C.: Building information modelling in construction conflict management. Int. J. Eng. Bus. Manage. 9, 1847979017746257 (2017)CrossRef Charehzehi, A., Chai, C., Md Yusof, A., Chong, H.Y., Loo, S.C.: Building information modelling in construction conflict management. Int. J. Eng. Bus. Manage. 9, 1847979017746257 (2017)CrossRef
14.
Zurück zum Zitat Chua, Y.S., Liew, J.Y.R., Pang, S.D.: Robustness of prefabricated prefinished volumetric construction (PPVC) high-rise building. In: Proceedings of the 12th International Conference on Advances in Steel-Concrete Composite Structures. ASCCS 2018, pp. 913–919. Editorial Universitat Politècnica de València (2018) Chua, Y.S., Liew, J.Y.R., Pang, S.D.: Robustness of prefabricated prefinished volumetric construction (PPVC) high-rise building. In: Proceedings of the 12th International Conference on Advances in Steel-Concrete Composite Structures. ASCCS 2018, pp. 913–919. Editorial Universitat Politècnica de València (2018)
15.
Zurück zum Zitat Zeng, S.: Cross-border supply chain changes, opportunities and countermeasures. In: E3S Web of Conferences, vol. 253. EDP Sciences (2021) Zeng, S.: Cross-border supply chain changes, opportunities and countermeasures. In: E3S Web of Conferences, vol. 253. EDP Sciences (2021)
17.
Zurück zum Zitat Arditi, D., Gutierrez, A.E.: Performance of US contractors in foreign markets. Constr. Manag. Econ. 9(5), 431–449 (1991)CrossRef Arditi, D., Gutierrez, A.E.: Performance of US contractors in foreign markets. Constr. Manag. Econ. 9(5), 431–449 (1991)CrossRef
20.
Zurück zum Zitat Thorpe, B., Sumner, P.: Quality assurance in construction. Routledge, Milton Park (2017)CrossRef Thorpe, B., Sumner, P.: Quality assurance in construction. Routledge, Milton Park (2017)CrossRef
21.
Zurück zum Zitat Lu, W., Wu, L., Xu, J., Lou, J.: Construction E-inspection 2.0 in the COVID-19 pandemic era: a blockchain-based technical solution. J. Manage. Eng. 38(4), 04022032 (2022)CrossRef Lu, W., Wu, L., Xu, J., Lou, J.: Construction E-inspection 2.0 in the COVID-19 pandemic era: a blockchain-based technical solution. J. Manage. Eng. 38(4), 04022032 (2022)CrossRef
24.
Zurück zum Zitat American Industrial Hygiene Association (AIHA). Focus on Construction Health: COVID-19 Guidance Document, Version 1, AIHA, VA (2020) American Industrial Hygiene Association (AIHA). Focus on Construction Health: COVID-19 Guidance Document, Version 1, AIHA, VA (2020)
25.
Zurück zum Zitat Ling, F.Y., Zhang, Z., Yew, A.Y.: Impact of COVID-19 pandemic on demand, output, and outcomes of construction projects in Singapore. J. Manag. Eng. 38(2), 04021097 (2022)CrossRef Ling, F.Y., Zhang, Z., Yew, A.Y.: Impact of COVID-19 pandemic on demand, output, and outcomes of construction projects in Singapore. J. Manag. Eng. 38(2), 04021097 (2022)CrossRef
26.
Zurück zum Zitat Stiles, S., Golightly, D., Ryan, B.: Impact of COVID-19 on health and safety in the construction sector. Hum. Factors Ergon. Manuf. Serv. Ind. 31(4), 425–437 (2021)CrossRef Stiles, S., Golightly, D., Ryan, B.: Impact of COVID-19 on health and safety in the construction sector. Hum. Factors Ergon. Manuf. Serv. Ind. 31(4), 425–437 (2021)CrossRef
27.
Zurück zum Zitat Allan-Blitz, L.T., Turner, I., Hertlein, F., Klausner, J.D.: High frequency and prevalence of community-based asymptomatic SARS-CoV-2 infection (2020). MedRxiv Allan-Blitz, L.T., Turner, I., Hertlein, F., Klausner, J.D.: High frequency and prevalence of community-based asymptomatic SARS-CoV-2 infection (2020). MedRxiv
28.
Zurück zum Zitat Pasco, R.F., Fox, S.J., Johnston, S.C., Pignone, M., Meyers, L.A.: Estimated association of construction work with risks of COVID-19 infection and hospitalisation in Texas. JAMA Netw. Open 3(10), e2026373–e2026373 (2020)CrossRef Pasco, R.F., Fox, S.J., Johnston, S.C., Pignone, M., Meyers, L.A.: Estimated association of construction work with risks of COVID-19 infection and hospitalisation in Texas. JAMA Netw. Open 3(10), e2026373–e2026373 (2020)CrossRef
29.
Zurück zum Zitat Baker, M.G., Peckham, T.K., Seixas, N.S.: Estimating the burden of United States workers exposed to infection or disease: a key factor in containing risk of COVID-19 infection. PLoS ONE 15(4), e0232452 (2020)CrossRef Baker, M.G., Peckham, T.K., Seixas, N.S.: Estimating the burden of United States workers exposed to infection or disease: a key factor in containing risk of COVID-19 infection. PLoS ONE 15(4), e0232452 (2020)CrossRef
30.
Zurück zum Zitat Ogunnusi, M., Hamma-Adama, M., Salman, H., Kouider, T.: COVID-19 pandemic: the effects and prospects in the construction industry. Int. J. Real Estate Stud. 14(Special Issue 2) (2020) Ogunnusi, M., Hamma-Adama, M., Salman, H., Kouider, T.: COVID-19 pandemic: the effects and prospects in the construction industry. Int. J. Real Estate Stud. 14(Special Issue 2) (2020)
31.
Zurück zum Zitat Pamidimukkala, A., Kermanshachi, S., Jahan Nipa, T.: Impacts of COVID-19 on health and safety of workforce in the construction industry. In: International Conference on Transportation and Development, pp. 418–430 (2021) Pamidimukkala, A., Kermanshachi, S., Jahan Nipa, T.: Impacts of COVID-19 on health and safety of workforce in the construction industry. In: International Conference on Transportation and Development, pp. 418–430 (2021)
32.
Zurück zum Zitat Leontie, V., Maha, L.G., Stoian, I.C.: COVID-19 pandemic and its effects on the usage of information technologies in the construction industry: the case of Romania. Buildings 12(2), 166 (2022)CrossRef Leontie, V., Maha, L.G., Stoian, I.C.: COVID-19 pandemic and its effects on the usage of information technologies in the construction industry: the case of Romania. Buildings 12(2), 166 (2022)CrossRef
33.
Zurück zum Zitat Elrefaey, O., Ahmed, S., Ahmad, I., El-Sayegh, S.: Impacts of COVID-19 on the use of digital technology in construction projects in the UAE. Buildings 12(4), 489 (2022)CrossRef Elrefaey, O., Ahmed, S., Ahmad, I., El-Sayegh, S.: Impacts of COVID-19 on the use of digital technology in construction projects in the UAE. Buildings 12(4), 489 (2022)CrossRef
35.
Zurück zum Zitat Herens, M.C., et al.: Commercially viable agriculture and consumption of nutritious foods: a framework for identifying development pathways: a desk review (No. 18–039). Wageningen Centre for Development Innovation (2018) Herens, M.C., et al.: Commercially viable agriculture and consumption of nutritious foods: a framework for identifying development pathways: a desk review (No. 18–039). Wageningen Centre for Development Innovation (2018)
36.
Zurück zum Zitat Iuliano, A., et al.: The burden and risks of pediatric pneumonia in Nigeria: a desk-based review of existing literature and data. Pediatr. Pulmonol. 55, S10–S21 (2020)CrossRef Iuliano, A., et al.: The burden and risks of pediatric pneumonia in Nigeria: a desk-based review of existing literature and data. Pediatr. Pulmonol. 55, S10–S21 (2020)CrossRef
37.
Zurück zum Zitat Sarker, M.N.I., Peng, Y., Yiran, C., Shouse, R.C.: Disaster resilience through big data: Way to environmental sustainability. Int. J. Disaster Risk Reduction 51, 101769 (2020)CrossRef Sarker, M.N.I., Peng, Y., Yiran, C., Shouse, R.C.: Disaster resilience through big data: Way to environmental sustainability. Int. J. Disaster Risk Reduction 51, 101769 (2020)CrossRef
39.
Zurück zum Zitat Ghansah, F.A., Chen, J., Lu, W.: Developing a user perception model for smart living: A partial least squares structural equation modelling approach. Build. Environ. 222, 109399 (2022)CrossRef Ghansah, F.A., Chen, J., Lu, W.: Developing a user perception model for smart living: A partial least squares structural equation modelling approach. Build. Environ. 222, 109399 (2022)CrossRef
40.
Zurück zum Zitat Saunders, B., et al.: Saturation in qualitative research: exploring its conceptualisation and operationalisation. Qual. Quant. 52(4), 1893–1907 (2018)CrossRef Saunders, B., et al.: Saturation in qualitative research: exploring its conceptualisation and operationalisation. Qual. Quant. 52(4), 1893–1907 (2018)CrossRef
41.
Zurück zum Zitat Gawdzińska, K.: Application of the Pareto chart and Ishikawa diagram for the Identification of major defects in metal composite castings. Arch. Foundry Eng. 11(2), 23–28 (2011). ISSN (1897–3310) Gawdzińska, K.: Application of the Pareto chart and Ishikawa diagram for the Identification of major defects in metal composite castings. Arch. Foundry Eng. 11(2), 23–28 (2011). ISSN (1897–3310)
42.
Zurück zum Zitat Stefanovic, S., Kiss, I., Stanojevic, D., Janjic, N.: Analysis of technological process of cutting logs using Ishikawa diagram. Acta Technica. Corviniensis-Bull. Eng. 7(4), 93 (2014) Stefanovic, S., Kiss, I., Stanojevic, D., Janjic, N.: Analysis of technological process of cutting logs using Ishikawa diagram. Acta Technica. Corviniensis-Bull. Eng. 7(4), 93 (2014)
43.
Zurück zum Zitat Luca, L., Pasare, M., Stancioiu, A., Brancu, C.: Study to determine a new model of the Ishikawa diagram for quality improvement. Fiability Durability 1, 249–254 (2017) Luca, L., Pasare, M., Stancioiu, A., Brancu, C.: Study to determine a new model of the Ishikawa diagram for quality improvement. Fiability Durability 1, 249–254 (2017)
44.
Zurück zum Zitat Hsiang, S., et al.: The effect of large-scale anti-contagion policies on the COVID-19 pandemic. Nature 584(7820), 262–267 (2020)CrossRef Hsiang, S., et al.: The effect of large-scale anti-contagion policies on the COVID-19 pandemic. Nature 584(7820), 262–267 (2020)CrossRef
45.
Zurück zum Zitat Lau, H., et al.: The positive impact of lockdown in Wuhan on containing the COVID-19 outbreak in China. J. Travel Med. 27, 3 (2020)CrossRef Lau, H., et al.: The positive impact of lockdown in Wuhan on containing the COVID-19 outbreak in China. J. Travel Med. 27, 3 (2020)CrossRef
51.
Zurück zum Zitat Brooks, S.K., et al.: The psychological impact of quarantine and how to reduce it: rapid review of the evidence. Lancet 395(10227), 912–920 (2020)CrossRef Brooks, S.K., et al.: The psychological impact of quarantine and how to reduce it: rapid review of the evidence. Lancet 395(10227), 912–920 (2020)CrossRef
52.
Zurück zum Zitat Raoufi, M., Fayek, A.R.: New modes of operating for construction organisations during the COVID-19 pandemic: challenges, actions, and future best practices. J. Manag. Eng. 38(2), 04021091 (2022)CrossRef Raoufi, M., Fayek, A.R.: New modes of operating for construction organisations during the COVID-19 pandemic: challenges, actions, and future best practices. J. Manag. Eng. 38(2), 04021091 (2022)CrossRef
53.
Zurück zum Zitat Suzumura, T., et al.: The impact of COVID-19 on flight networks. In: 2020 IEEE International Conference on Big Data (Big Data), pp. 2443–2452. IEEE (2020) Suzumura, T., et al.: The impact of COVID-19 on flight networks. In: 2020 IEEE International Conference on Big Data (Big Data), pp. 2443–2452. IEEE (2020)
54.
Zurück zum Zitat Kwok, W.C., et al.: Modelling the impact of travel restrictions on COVID-19 cases in Hong Kong in early 2020. BMC Public Health 21(1), 1–8 (2021) Kwok, W.C., et al.: Modelling the impact of travel restrictions on COVID-19 cases in Hong Kong in early 2020. BMC Public Health 21(1), 1–8 (2021)
55.
Zurück zum Zitat International Labour Oragnisation (ILO). In the Face of a Pandemic: Ensuring Safety and Health at Work, ILO, Geneva (2020) International Labour Oragnisation (ILO). In the Face of a Pandemic: Ensuring Safety and Health at Work, ILO, Geneva (2020)
57.
Zurück zum Zitat Rosner, E.: Adverse effects of prolonged mask use among healthcare professionals during COVID-19. J. Infect. Dis. Epidemiol. 6(3), 130 (2020) Rosner, E.: Adverse effects of prolonged mask use among healthcare professionals during COVID-19. J. Infect. Dis. Epidemiol. 6(3), 130 (2020)
60.
Zurück zum Zitat Zhou, M., Chen, Y., Su, X., An, L.: Rapid construction and advanced technology for a Covid-19 field hospital in Wuhan, China. In: Proceedings of the Institution of Civil Engineers-Civil Engineering, vol. 174, no. 1, pp. 29–34. Thomas Telford Ltd. (2020) Zhou, M., Chen, Y., Su, X., An, L.: Rapid construction and advanced technology for a Covid-19 field hospital in Wuhan, China. In: Proceedings of the Institution of Civil Engineers-Civil Engineering, vol. 174, no. 1, pp. 29–34. Thomas Telford Ltd. (2020)
61.
Zurück zum Zitat Wang, W., et al.: Exploring the adoption of BIM amidst the COVID-19 crisis in China. Build. Res. Inf. 49(8), 930–947 (2021)CrossRef Wang, W., et al.: Exploring the adoption of BIM amidst the COVID-19 crisis in China. Build. Res. Inf. 49(8), 930–947 (2021)CrossRef
62.
Zurück zum Zitat Goh, Y.M., Tian, J., Chian, E.Y.T.: Management of safe distancing on construction sites during COVID-19: a smart real-time monitoring system. Comput. Ind. Eng. 163, 107847 (2022)CrossRef Goh, Y.M., Tian, J., Chian, E.Y.T.: Management of safe distancing on construction sites during COVID-19: a smart real-time monitoring system. Comput. Ind. Eng. 163, 107847 (2022)CrossRef
64.
Zurück zum Zitat Assaad, R., El-adaway, I.H.: Guidelines for responding to COVID-19 pandemic: Best practices, impacts, and future research directions. J. Manag. Eng. 37(3), 06021001 (2021)CrossRef Assaad, R., El-adaway, I.H.: Guidelines for responding to COVID-19 pandemic: Best practices, impacts, and future research directions. J. Manag. Eng. 37(3), 06021001 (2021)CrossRef
66.
Zurück zum Zitat Chih, Y.Y., Hsiao, C.Y.L., Zolghadr, A., Naderpajouh, N.: Resilience of organisations in the construction industry in the face of COVID-19 disturbances: dynamic capabilities perspective. J. Manag. Eng. 38(2), 04022002 (2022)CrossRef Chih, Y.Y., Hsiao, C.Y.L., Zolghadr, A., Naderpajouh, N.: Resilience of organisations in the construction industry in the face of COVID-19 disturbances: dynamic capabilities perspective. J. Manag. Eng. 38(2), 04022002 (2022)CrossRef
67.
Zurück zum Zitat AlHanaee, N., AlHanaee, T.: Smart contract using blockchain in construction and infrastructure sector in the COVID-19 pandemic. In: ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, vol. 38, pp. 1018–1024. IAARC Publications (2021) AlHanaee, N., AlHanaee, T.: Smart contract using blockchain in construction and infrastructure sector in the COVID-19 pandemic. In: ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, vol. 38, pp. 1018–1024. IAARC Publications (2021)
Metadaten
Titel
How has COVID-19 Pandemic Influenced the Quality Assurance of Cross-Border Construction Logistics and Supply Chain? A Conceptual Analysis Based on Ishikawa Diagram
verfasst von
Frank Ato Ghansah
Weisheng Lu
Benjamin Kwaku Ababio
Jinfeng Lou
Copyright-Jahr
2023
Verlag
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-99-3626-7_101