Skip to main content

2014 | OriginalPaper | Buchkapitel

Incorporating the Work Pace Concept into the MMSP-W

verfasst von : Joaquín Bautista, Rocío Alfaro, Cristina Batalla, Alberto Cano

Erschienen in: Managing Complexity

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This work proposes an extension for the MMSP-W (Mixed-Model Sequencing Problem with Work overload Minimization) with variable processing times by the incorporation of the work pace or work speed concept. A computational experience, linked to a case study of Nissan Powertrain plant in Barcelona, is carried out to compare the performance of the reference model with the new proposed model.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Bautista J, Cano A (2011) Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules. Eur J Oper Res 210(3):495–513CrossRefMATH Bautista J, Cano A (2011) Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules. Eur J Oper Res 210(3):495–513CrossRefMATH
2.
Zurück zum Zitat Bautista J, Cano A, Alfaro R (2012) Models for MMSP-W considering workstation dependencies: a case study of Nissan’s Barcelona plant. Eur J Oper Res 223(3):669–679CrossRef Bautista J, Cano A, Alfaro R (2012) Models for MMSP-W considering workstation dependencies: a case study of Nissan’s Barcelona plant. Eur J Oper Res 223(3):669–679CrossRef
3.
Zurück zum Zitat Boysen N, Fliedner M, Scholl A (2009) Sequencing mixed-model assembly lines: survey, classification and model critique. Eur J Oper Res 192(2):349–373CrossRefMATHMathSciNet Boysen N, Fliedner M, Scholl A (2009) Sequencing mixed-model assembly lines: survey, classification and model critique. Eur J Oper Res 192(2):349–373CrossRefMATHMathSciNet
4.
Zurück zum Zitat Lawrence S Aft (2001) Measurement of work. In: Maynard’s industrial engineering handbook, fifth edition. McGraw-Hill, New York, pp 5.3–5.22 Lawrence S Aft (2001) Measurement of work. In: Maynard’s industrial engineering handbook, fifth edition. McGraw-Hill, New York, pp 5.3–5.22
5.
Zurück zum Zitat Muse LA, Harris SG, Feild HS (2003) Has the inverted-U theory of stress and job performance had a fair test? Hum Perform 16(4):349–364.CrossRef Muse LA, Harris SG, Feild HS (2003) Has the inverted-U theory of stress and job performance had a fair test? Hum Perform 16(4):349–364.CrossRef
6.
Zurück zum Zitat Scholl A, Klein R, Domschke W (1998) Pattern based vocabulary building for effectively sequencing mixed-model assembly lines. J Heuristics 4(4):359–381CrossRefMATH Scholl A, Klein R, Domschke W (1998) Pattern based vocabulary building for effectively sequencing mixed-model assembly lines. J Heuristics 4(4):359–381CrossRefMATH
7.
Zurück zum Zitat Yano CA, Rachamadugu R (1991) Sequencing to minimize work overload in assembly lines with product options. Manage Sci 37(5):572–586CrossRef Yano CA, Rachamadugu R (1991) Sequencing to minimize work overload in assembly lines with product options. Manage Sci 37(5):572–586CrossRef
Metadaten
Titel
Incorporating the Work Pace Concept into the MMSP-W
verfasst von
Joaquín Bautista
Rocío Alfaro
Cristina Batalla
Alberto Cano
Copyright-Jahr
2014
DOI
https://doi.org/10.1007/978-3-319-04705-8_30