Skip to main content
Erschienen in:
Buchtitelbild

2013 | OriginalPaper | Buchkapitel

1. Introduction

verfasst von : Lars Mönch, John W. Fowler, Scott J. Mason

Erschienen in: Production Planning and Control for Semiconductor Wafer Fabrication Facilities

Verlag: Springer New York

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The purpose of this chapter is to provide an overview of the book. Therefore, we start by discussing motivation for modeling and analysis of semiconductor manufacturing. Semiconductor manufacturing is an extreme environment for production planning and control, scheduling, and simulation models. The enormous size of the facilities and supply chains in the semiconductor industry, the permanent appearance of uncertainty, and rapid technological changes lead to an environment that brings approaches developed for other industries under stress (see Chien et al. [49] for a related discussion). The capital intensive nature of the semiconductor industry requires manufacturing systems to run consistently at high utilization levels, reentrant flows create complex competition for limited resource capacity, and the ever-increasing level of automation reduces the ability to rely solely on people for production planning and control. Models that are successful in the semiconductor industry will likely find reasonable applications in other areas. A second source of academic interest in modeling and analysis of semiconductor manufacturing is the insight that the semiconductor manufacturing environment initiates on the formulation of some problems that had not been widely studied in other industries (cf. Chien et al. [49]).

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Adams, J., Balas, E., Zawack, D.: The shifting bottleneck procedure for job-shop scheduling. Manag. Sci. 34(3), 391–401 (1988) Adams, J., Balas, E., Zawack, D.: The shifting bottleneck procedure for job-shop scheduling. Manag. Sci. 34(3), 391–401 (1988)
2.
Zurück zum Zitat Adelsberger, H.H., Kanet, J.J.: The Leitstand—a new tool in computer-integrated manufacturing. Prod. Inventory Manag. J. 32(1), 43–48 (1991) Adelsberger, H.H., Kanet, J.J.: The Leitstand—a new tool in computer-integrated manufacturing. Prod. Inventory Manag. J. 32(1), 43–48 (1991)
3.
Zurück zum Zitat Agrawal, G.K., Heragu, S.S.: A survey of automated material handling systems in 300-mm semiconductor fabs. IEEE Trans. Semicond. Manuf. 19(1), 112–120 (2006) Agrawal, G.K., Heragu, S.S.: A survey of automated material handling systems in 300-mm semiconductor fabs. IEEE Trans. Semicond. Manuf. 19(1), 112–120 (2006)
4.
Zurück zum Zitat Akali, E., Uzsoy, R.: A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography. In: Proceedings of the Twenty-Sixth IEEE/CPMT International Electronics Manufacturing Technology Symposium, pp. 374–381 (2000) Akali, E., Uzsoy, R.: A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography. In: Proceedings of the Twenty-Sixth IEEE/CPMT International Electronics Manufacturing Technology Symposium, pp. 374–381 (2000)
5.
Zurück zum Zitat Akali, E., Nemoto, K., Uzsoy, R.: Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 14(1), 48–56 (2001) Akali, E., Nemoto, K., Uzsoy, R.: Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 14(1), 48–56 (2001)
6.
Zurück zum Zitat Allen, C.: The impact of network topology on rational-function models of the cycle time-throughput curve. Master’s thesis, Northwestern University (2004) Allen, C.: The impact of network topology on rational-function models of the cycle time-throughput curve. Master’s thesis, Northwestern University (2004)
7.
Zurück zum Zitat Almeder, C., Preusser, M., Hartl, R.F.: Simulation and optimization of supply chains: alternative or complementary approaches? OR Spectrum 31(1), 95–119 (2009) Almeder, C., Preusser, M., Hartl, R.F.: Simulation and optimization of supply chains: alternative or complementary approaches? OR Spectrum 31(1), 95–119 (2009)
8.
Zurück zum Zitat Ankenman, B.E., Bekki, J.M., Fowler, J.W., Mackulak, G.T., Nelson, B.L.: Simulation in production planning—an overview with emphasis on recent developments in cycle time estimation. In: Kempf, K.G., Keskinozak, P., Uzsoy, R. (eds.) Planning Production and Inventories in the Extended Enterprise, pp. 565–591. Springer, Berlin (2011) Ankenman, B.E., Bekki, J.M., Fowler, J.W., Mackulak, G.T., Nelson, B.L.: Simulation in production planning—an overview with emphasis on recent developments in cycle time estimation. In: Kempf, K.G., Keskinozak, P., Uzsoy, R. (eds.) Planning Production and Inventories in the Extended Enterprise, pp. 565–591. Springer, Berlin (2011)
9.
Zurück zum Zitat Appleton-Day, K., Shao, L.: Real-time dispatch gets real-time results in AMD’s Fab 25. In: Proceedings of the 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 444–447 (1997) Appleton-Day, K., Shao, L.: Real-time dispatch gets real-time results in AMD’s Fab 25. In: Proceedings of the 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 444–447 (1997)
11.
Zurück zum Zitat Ashby, J.R., Uzsoy, R.: Scheduling and order release in a single stage production system. J. Manuf. Syst. 14(4), 290–305 (1995) Ashby, J.R., Uzsoy, R.: Scheduling and order release in a single stage production system. J. Manuf. Syst. 14(4), 290–305 (1995)
12.
Zurück zum Zitat Asmundsson, J., Rardin, R.L., Uzsoy, R.: Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(1), 95–111 (2006) Asmundsson, J., Rardin, R.L., Uzsoy, R.: Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(1), 95–111 (2006)
13.
Zurück zum Zitat Asmundsson, J., Rardin, R.L., Turkseven, C.H., Uzsoy, R.: Production planning with resources subject to congestion. Nav. Res. Logist. 56(2), 142–157 (2009) Asmundsson, J., Rardin, R.L., Turkseven, C.H., Uzsoy, R.: Production planning with resources subject to congestion. Nav. Res. Logist. 56(2), 142–157 (2009)
14.
Zurück zum Zitat Atherton, L.F., Atherton, R.W.: Wafer Fabrication: Factory Performance and Analysis. Kluwer Academic Publishers, Norwell (1995) Atherton, L.F., Atherton, R.W.: Wafer Fabrication: Factory Performance and Analysis. Kluwer Academic Publishers, Norwell (1995)
15.
Zurück zum Zitat Aytug, H., Kempf, K., Uzsoy, R.: Measures of subproblem criticality in decomposition algorithms for shop scheduling. Int. J. Prod. Res. 41(5), 865–882 (2003) Aytug, H., Kempf, K., Uzsoy, R.: Measures of subproblem criticality in decomposition algorithms for shop scheduling. Int. J. Prod. Res. 41(5), 865–882 (2003)
16.
Zurück zum Zitat Bahaji, N., Kuhl, M.E.: A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication. Int. J. Prod. Res. 46(14), 3801–3824 (2008) Bahaji, N., Kuhl, M.E.: A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication. Int. J. Prod. Res. 46(14), 3801–3824 (2008)
17.
Zurück zum Zitat Bai, X., Srivatsan, N., Gershwin, S.B.: Hierarchical real-time scheduling of a semiconductor fabrication facility. In: Proceedings of the Ninth IEEE International Electronics Manufacturing Technology Symposium, pp. 312–317 (1990) Bai, X., Srivatsan, N., Gershwin, S.B.: Hierarchical real-time scheduling of a semiconductor fabrication facility. In: Proceedings of the Ninth IEEE International Electronics Manufacturing Technology Symposium, pp. 312–317 (1990)
18.
Zurück zum Zitat Balasubramanian, H., Mnch, L., Fowler, J.W., Pfund, M.E.: Genetic algorithm based scheduling of jobs with incompatible families on parallel batch machines. Int. J. Prod. Res. 42(8), 1621–1638 (2004) Balasubramanian, H., Mnch, L., Fowler, J.W., Pfund, M.E.: Genetic algorithm based scheduling of jobs with incompatible families on parallel batch machines. Int. J. Prod. Res. 42(8), 1621–1638 (2004)
19.
Zurück zum Zitat Balasubramanian, H., Fowler, J.W., Pfund, M.E.: Single machine bicriteria scheduling using the apparent tardiness cost heuristic. In: Proceedings of the 2006 Industrial Engineering Research Conference (2006) Balasubramanian, H., Fowler, J.W., Pfund, M.E.: Single machine bicriteria scheduling using the apparent tardiness cost heuristic. In: Proceedings of the 2006 Industrial Engineering Research Conference (2006)
20.
Zurück zum Zitat Banerjee, A.: Global trends in supply chain planning in semiconductor industry. SETLabs Briefings 5(3), 1–11 (2007) Banerjee, A.: Global trends in supply chain planning in semiconductor industry. SETLabs Briefings 5(3), 1–11 (2007)
21.
Zurück zum Zitat Banks, J., Carson, J.S., Nelson, B.L.: Discrete-Event System Simulation, 2nd edn. Prentice Hall, Upper Saddle River (1999) Banks, J., Carson, J.S., Nelson, B.L.: Discrete-Event System Simulation, 2nd edn. Prentice Hall, Upper Saddle River (1999)
22.
Zurück zum Zitat Barahona, F., Bermon, S., Gnlk, O., Hood, S.J.: Robust capacity planning in semiconductor manufacturing. Nav. Res. Logist. 52(5), 459–468 (2005) Barahona, F., Bermon, S., Gnlk, O., Hood, S.J.: Robust capacity planning in semiconductor manufacturing. Nav. Res. Logist. 52(5), 459–468 (2005)
23.
Zurück zum Zitat Barua, A., Raghavan, N., Upasani, A.A., Uzsoy, R.: Implementing global factory schedules in the face of stochastic disruptions. Int. J. Prod. Res. 43(4), 793–818 (2005) Barua, A., Raghavan, N., Upasani, A.A., Uzsoy, R.: Implementing global factory schedules in the face of stochastic disruptions. Int. J. Prod. Res. 43(4), 793–818 (2005)
24.
Zurück zum Zitat Bermon, S., Hood, S.J.: Capacity optimization planning system (CAPS). Interfaces 29(5), 31–50 (1999) Bermon, S., Hood, S.J.: Capacity optimization planning system (CAPS). Interfaces 29(5), 31–50 (1999)
25.
Zurück zum Zitat Bertsimas, D., Tsitsiklis, J.N.: Introduction to Linear Optimization. Athena Scientific, Dynamic Ideas, Belmont (1997) Bertsimas, D., Tsitsiklis, J.N.: Introduction to Linear Optimization. Athena Scientific, Dynamic Ideas, Belmont (1997)
26.
Zurück zum Zitat Bianco, L., Ricciardelli, S., Rinaldi, G., Sassano, A.: Scheduling tasks with sequence-dependent processing times. Nav. Res. Logist. 35(2), 177–184 (1988) Bianco, L., Ricciardelli, S., Rinaldi, G., Sassano, A.: Scheduling tasks with sequence-dependent processing times. Nav. Res. Logist. 35(2), 177–184 (1988)
27.
Zurück zum Zitat Birge, J.R., Louveaux, F.: Introduction to Stochastic Programming. Springer, New York (1997) Birge, J.R., Louveaux, F.: Introduction to Stochastic Programming. Springer, New York (1997)
28.
Zurück zum Zitat Bixby, R., Burda, R., Miller, D.: Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming. In: Proceedings of the 2006 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 148–154 (2006) Bixby, R., Burda, R., Miller, D.: Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming. In: Proceedings of the 2006 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 148–154 (2006)
29.
Zurück zum Zitat Blackstone, J.H., Hogg, G.L., Phillips, D.T.: A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res. 20(1), 27–45 (1982) Blackstone, J.H., Hogg, G.L., Phillips, D.T.: A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res. 20(1), 27–45 (1982)
30.
Zurück zum Zitat Blazewicz, J., Pesch, E., Sterna, M.: The disjunctive graph machine representation of the job shop scheduling problem. Eur. J. Oper. Res. 127(2), 317–331 (2000) Blazewicz, J., Pesch, E., Sterna, M.: The disjunctive graph machine representation of the job shop scheduling problem. Eur. J. Oper. Res. 127(2), 317–331 (2000)
31.
Zurück zum Zitat Box, G.E.P.: Robustness in the strategy of model building. In: Launer, R.L., Wilkinson, G.N. (eds.) Robustness in Statistics. Academic Press, New York (1979) Box, G.E.P.: Robustness in the strategy of model building. In: Launer, R.L., Wilkinson, G.N. (eds.) Robustness in Statistics. Academic Press, New York (1979)
32.
Zurück zum Zitat Brandimarte, P., Rigodanza, M., Roero, L.: Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure. IIE Trans. 32(10), 921–929 (2000) Brandimarte, P., Rigodanza, M., Roero, L.: Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure. IIE Trans. 32(10), 921–929 (2000)
33.
Zurück zum Zitat Brown, S., Chance, F., Fowler, J.W., Robinson, J.K.: A centralized approach to factory simulation. Future Fab Int. 3, 83–86 (1997) Brown, S., Chance, F., Fowler, J.W., Robinson, J.K.: A centralized approach to factory simulation. Future Fab Int. 3, 83–86 (1997)
34.
Zurück zum Zitat Brucker, P.: Scheduling Algorithms, 5th edn. Springer, Berlin (2007) Brucker, P.: Scheduling Algorithms, 5th edn. Springer, Berlin (2007)
35.
Zurück zum Zitat Brucker, P., Knust, S.: Complex Scheduling. Springer, Berlin (2006) Brucker, P., Knust, S.: Complex Scheduling. Springer, Berlin (2006)
36.
Zurück zum Zitat Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M.Y., Potts, C.N., Tautenhahn, T., van de Velde, S.: Scheduling a batching machine. J. Scheduling 1(1), 31–54 (1998) Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M.Y., Potts, C.N., Tautenhahn, T., van de Velde, S.: Scheduling a batching machine. J. Scheduling 1(1), 31–54 (1998)
37.
Zurück zum Zitat Bullock, M., Fowler, J.W., Pfund, M.E.: Evaluation of lot dispatching rules for semiconductor manufacturing. In: Proceedings of the 11th Annual Industrial Engineering Research Conference (2003) Bullock, M., Fowler, J.W., Pfund, M.E.: Evaluation of lot dispatching rules for semiconductor manufacturing. In: Proceedings of the 11th Annual Industrial Engineering Research Conference (2003)
38.
Zurück zum Zitat Bussmann, S.: An agent-oriented design methodology for production control. PhD thesis, University of Southampton (2003) Bussmann, S.: An agent-oriented design methodology for production control. PhD thesis, University of Southampton (2003)
39.
Zurück zum Zitat Bussmann, S., Jennings, N.R., Wooldridge, M.: On the identification of agents in the design of production control systems. In: Proceedings First International Workshop on Agent-Oriented Software Engineering, pp. 141–162 (2001) Bussmann, S., Jennings, N.R., Wooldridge, M.: On the identification of agents in the design of production control systems. In: Proceedings First International Workshop on Agent-Oriented Software Engineering, pp. 141–162 (2001)
40.
Zurück zum Zitat Bussmann, S., Jennings, N.R., Wooldridge, M.: Re-use of interaction protocols for agent-based control applications. In: Proceedings Third International Workshop on Agent-Oriented Software Engineering, pp. 73–87 (2003) Bussmann, S., Jennings, N.R., Wooldridge, M.: Re-use of interaction protocols for agent-based control applications. In: Proceedings Third International Workshop on Agent-Oriented Software Engineering, pp. 73–87 (2003)
41.
Zurück zum Zitat Byrne, P.J.: An analysis of semiconductor reticle management using discrete event simulation. In: Proceedings of the 2007 Summer Computer Simulation Conference, pp. 593–600 (2007) Byrne, P.J.: An analysis of semiconductor reticle management using discrete event simulation. In: Proceedings of the 2007 Summer Computer Simulation Conference, pp. 593–600 (2007)
42.
Zurück zum Zitat Cakici, E., Mason, S.J.: Parallel machine scheduling subject to auxiliary resource constraints. Prod. Plann. Contr. 18(3), 217–225 (2007) Cakici, E., Mason, S.J.: Parallel machine scheduling subject to auxiliary resource constraints. Prod. Plann. Contr. 18(3), 217–225 (2007)
43.
Zurück zum Zitat Chambers, R.J., Carraway, R.L., Lowe, T.J., Morin, T.L.: Dominance and decomposition heuristics for single machine scheduling. Oper. Res. 39(4), 639–647 (1991) Chambers, R.J., Carraway, R.L., Lowe, T.J., Morin, T.L.: Dominance and decomposition heuristics for single machine scheduling. Oper. Res. 39(4), 639–647 (1991)
44.
Zurück zum Zitat Chandra, P., Gupta, S.: Managing batch processors to reduce lead time in a semiconductor packaging line. Int. J. Prod. Res. 35(3), 611–633 (1997) Chandra, P., Gupta, S.: Managing batch processors to reduce lead time in a semiconductor packaging line. Int. J. Prod. Res. 35(3), 611–633 (1997)
45.
Zurück zum Zitat Chen, Y., Pfund, M.E., Fowler, J.W., Montgomery, D.C., Callarman, T.E.: Robust scaling parameters for composite dispatching rules. IIE Trans. 42(11), 842–853 (2010) Chen, Y., Pfund, M.E., Fowler, J.W., Montgomery, D.C., Callarman, T.E.: Robust scaling parameters for composite dispatching rules. IIE Trans. 42(11), 842–853 (2010)
46.
Zurück zum Zitat Cheng, R.C.H., Kleijnen, J.P.C.: Improved design of queueing simulation experiments with highly heteroscedastic responses. Oper. Res. 47(5), 762–777 (1999) Cheng, R.C.H., Kleijnen, J.P.C.: Improved design of queueing simulation experiments with highly heteroscedastic responses. Oper. Res. 47(5), 762–777 (1999)
48.
Zurück zum Zitat Chiang, T.-C., Cheng, H.-C., Fu, L.-C.: A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival. Comput. Oper. Res. 37(12), 2257–2269 (2010) Chiang, T.-C., Cheng, H.-C., Fu, L.-C.: A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival. Comput. Oper. Res. 37(12), 2257–2269 (2010)
49.
Zurück zum Zitat Chien, C.-F., Dauzère-Pérès, S., Ehm, H., Fowler, J.W., Jiang, Z., Krishnaswamy, S., Mönch, L., Uzsoy, R.: Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes. Eur. J. Ind. Eng. 5(3), 254–271 (2011) Chien, C.-F., Dauzère-Pérès, S., Ehm, H., Fowler, J.W., Jiang, Z., Krishnaswamy, S., Mönch, L., Uzsoy, R.: Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes. Eur. J. Ind. Eng. 5(3), 254–271 (2011)
50.
Zurück zum Zitat Chung, S.-L., Jeng, M.: An overview of semiconductor fab automation systems. In: Proceedings of the 2003 IEEE International Conference on Robotics and Automation, pp. 1050–1055 (2003) Chung, S.-L., Jeng, M.: An overview of semiconductor fab automation systems. In: Proceedings of the 2003 IEEE International Conference on Robotics and Automation, pp. 1050–1055 (2003)
51.
Zurück zum Zitat Cigolini, R., Perona, M., Portioli, A.: Comparison of order review and release techniques in a dynamic and uncertain job shop environment. Int. J. Prod. Res. 36(11), 2931–2951 (1998) Cigolini, R., Perona, M., Portioli, A.: Comparison of order review and release techniques in a dynamic and uncertain job shop environment. Int. J. Prod. Res. 36(11), 2931–2951 (1998)
52.
Zurück zum Zitat Cigolini, R., Perona, M., Portioli, A., Zambelli, T.: A new dynamic look-ahead scheduling procedure for batching machines. J. Scheduling 5(2), 185–204 (2002) Cigolini, R., Perona, M., Portioli, A., Zambelli, T.: A new dynamic look-ahead scheduling procedure for batching machines. J. Scheduling 5(2), 185–204 (2002)
53.
Zurück zum Zitat Cochran, J.K., Horng, S.M., Fowler, J.W.: A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput. Oper. Res. 30(7), 1087–1102 (2003) Cochran, J.K., Horng, S.M., Fowler, J.W.: A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput. Oper. Res. 30(7), 1087–1102 (2003)
54.
Zurück zum Zitat Cogez, P.: The effect of uncertainty on production release policies. Master’s thesis, University of California, Berkeley (1990) Cogez, P.: The effect of uncertainty on production release policies. Master’s thesis, University of California, Berkeley (1990)
55.
Zurück zum Zitat Curry, G.L., Feldmann, R.M.: Manufacturing Systems Modeling and Analysis. Springer, Berlin (2009) Curry, G.L., Feldmann, R.M.: Manufacturing Systems Modeling and Analysis. Springer, Berlin (2009)
56.
Zurück zum Zitat Dabbas, R.M., Chen, H.-N., Fowler, J.W., Shunk, D.L.: A combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Comput. Ind. Eng. 39(3-4), 307–324 (2001) Dabbas, R.M., Chen, H.-N., Fowler, J.W., Shunk, D.L.: A combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Comput. Ind. Eng. 39(3-4), 307–324 (2001)
57.
Zurück zum Zitat Dabbas, R.M., Fowler, J.W.: A new scheduling approach using combined dispatching criteria in wafer fabs. IEEE Trans. Semicond. Manuf. 16(3), 501–510 (2003) Dabbas, R.M., Fowler, J.W.: A new scheduling approach using combined dispatching criteria in wafer fabs. IEEE Trans. Semicond. Manuf. 16(3), 501–510 (2003)
58.
Zurück zum Zitat Dabbas, R.M., Fowler, J.W., Rollier, D.A., McCarville, D.: Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling. Int. J. Prod. Res. 41(5), 939–961 (2003) Dabbas, R.M., Fowler, J.W., Rollier, D.A., McCarville, D.: Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling. Int. J. Prod. Res. 41(5), 939–961 (2003)
59.
Zurück zum Zitat Dauzère-Pérès, S., Lassere, J.B.: A modified shifting bottleneck procedure for job-shop scheduling. Int. J. Prod. Res. 31(4), 923–932 (1993) Dauzère-Pérès, S., Lassere, J.B.: A modified shifting bottleneck procedure for job-shop scheduling. Int. J. Prod. Res. 31(4), 923–932 (1993)
60.
Zurück zum Zitat Davis, W.J.: On-line simulation: need and evolving research requirements. In: Banks, J. (ed.) Handbook of Simulation, pp. 465–516. Wiley, New York (1998) Davis, W.J.: On-line simulation: need and evolving research requirements. In: Banks, J. (ed.) Handbook of Simulation, pp. 465–516. Wiley, New York (1998)
61.
Zurück zum Zitat Dayhoff, J.E., Atherton, R.W.: Signature analysis of dispatch schemes in wafer fabrication. IEEE Trans. Compon.Hybrids Manuf. Tech. 9(4), 518–525 (1986) Dayhoff, J.E., Atherton, R.W.: Signature analysis of dispatch schemes in wafer fabrication. IEEE Trans. Compon.Hybrids Manuf. Tech. 9(4), 518–525 (1986)
62.
Zurück zum Zitat Deb, R., Serfozo, R.F.: Optimal control of batch service queues. Adv. Appl. Probab. 5(2), 340–361 (1973) Deb, R., Serfozo, R.F.: Optimal control of batch service queues. Adv. Appl. Probab. 5(2), 340–361 (1973)
63.
Zurück zum Zitat Demirkol, E., Uzsoy, R.: Performance of decomposition methods for complex workshops under multiple criteria. Comput. Ind. Eng. 33(1/2), 261–264 (1997) Demirkol, E., Uzsoy, R.: Performance of decomposition methods for complex workshops under multiple criteria. Comput. Ind. Eng. 33(1/2), 261–264 (1997)
64.
Zurück zum Zitat Demirkol, E., Uzsoy, R.: Decomposition methods for reentrant flow shops with sequence dependent setup-times. J. Scheduling 3(3), 155–177 (2000) Demirkol, E., Uzsoy, R.: Decomposition methods for reentrant flow shops with sequence dependent setup-times. J. Scheduling 3(3), 155–177 (2000)
65.
Zurück zum Zitat Demirkol, E., Mehta, S., Uzsoy, R.: A computational study of shifting bottleneck procedures for shop scheduling problems. J. Heuristics 3(2), 111–137 (1997) Demirkol, E., Mehta, S., Uzsoy, R.: A computational study of shifting bottleneck procedures for shop scheduling problems. J. Heuristics 3(2), 111–137 (1997)
66.
Zurück zum Zitat Derringer, G., Suich, R.: Simultaneous optimization of several response variables. J. Qual. Tech. 12(4), 214–219 (1980) Derringer, G., Suich, R.: Simultaneous optimization of several response variables. J. Qual. Tech. 12(4), 214–219 (1980)
67.
Zurück zum Zitat Devpura, A., Fowler, J.W., Carlyle, M.W., Perez, I.: Minimizing total weighted tardiness on single batch process machine with incompatible job families. In: Proceedings of the Symposium on Operations Research (OR 2000), pp. 366–371 (2000) Devpura, A., Fowler, J.W., Carlyle, M.W., Perez, I.: Minimizing total weighted tardiness on single batch process machine with incompatible job families. In: Proceedings of the Symposium on Operations Research (OR 2000), pp. 366–371 (2000)
68.
Zurück zum Zitat Dìaz, S.L., Fowler, J.W., Pfund, M.E., Mackulak, G.T., Hickie, M.: Evaluating the impact of reticle requirements in semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 18(4), 622–632 (2005) Dìaz, S.L., Fowler, J.W., Pfund, M.E., Mackulak, G.T., Hickie, M.: Evaluating the impact of reticle requirements in semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 18(4), 622–632 (2005)
69.
Zurück zum Zitat Dorndorf, U., Pesch, E.: Evolution based learning in a job shop scheduling environment. Comput. Oper. Res. 22(1), 25–40 (1995) Dorndorf, U., Pesch, E.: Evolution based learning in a job shop scheduling environment. Comput. Oper. Res. 22(1), 25–40 (1995)
70.
Zurück zum Zitat Dowsland, K., Dowsland, W.: Packing problems. Eur. J. Oper. Res. 56(1), 2–14 (1992) Dowsland, K., Dowsland, W.: Packing problems. Eur. J. Oper. Res. 56(1), 2–14 (1992)
71.
Zurück zum Zitat Driessel, R., Mnch, L.: Simulation framework for complex manufacturing systems with automated material handling. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1713–1721 (2007) Driessel, R., Mnch, L.: Simulation framework for complex manufacturing systems with automated material handling. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1713–1721 (2007)
72.
Zurück zum Zitat Driessel, R., Mnch, L.: Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times. Comput. Ind. Eng. 61(2), 336–345 (2011) Driessel, R., Mnch, L.: Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times. Comput. Ind. Eng. 61(2), 336–345 (2011)
73.
Zurück zum Zitat Driessel, R., Mnch, L.: An integrated scheduling and material handling approach for complex job shops: a computational study. Int. J. Prod. Res., accepted for publication (2012) Driessel, R., Mnch, L.: An integrated scheduling and material handling approach for complex job shops: a computational study. Int. J. Prod. Res., accepted for publication (2012)
74.
Zurück zum Zitat Duarte, B.M., Fowler, J.W., Knutson, K., Gel, E., Shunk, D.L.: A compact abstraction of manufacturing nodes in a supply network. Int. J. Simulat. Process Model. 3(3), 115–126 (2007) Duarte, B.M., Fowler, J.W., Knutson, K., Gel, E., Shunk, D.L.: A compact abstraction of manufacturing nodes in a supply network. Int. J. Simulat. Process Model. 3(3), 115–126 (2007)
75.
Zurück zum Zitat Dümmler, M.: Using simulation and genetic algorithms to improve cluster tool performance. In: Proceedings of the 1999 Winter Simulation Conference, pp. 875–879 (1999) Dümmler, M.: Using simulation and genetic algorithms to improve cluster tool performance. In: Proceedings of the 1999 Winter Simulation Conference, pp. 875–879 (1999)
76.
Zurück zum Zitat Dümmler, M.: Modeling and optimization of cluster tools in semiconductor manufacturing. PhD thesis, University of Würzburg (2004) Dümmler, M.: Modeling and optimization of cluster tools in semiconductor manufacturing. PhD thesis, University of Würzburg (2004)
78.
Zurück zum Zitat Falkenauer, E.: Genetic Algorithms and Grouping Problems. Wiley, Chichester (1998) Falkenauer, E.: Genetic Algorithms and Grouping Problems. Wiley, Chichester (1998)
80.
Zurück zum Zitat Fischmann, C., Bttinger, F., Wertz, R., Kunz, C.: Buffer management for automated material handling systems in semiconductor industries. In: Proceedings 22nd European Conference on Modeling and Simulation (ECMS 2008), pp. 423–427 (2008) Fischmann, C., Bttinger, F., Wertz, R., Kunz, C.: Buffer management for automated material handling systems in semiconductor industries. In: Proceedings 22nd European Conference on Modeling and Simulation (ECMS 2008), pp. 423–427 (2008)
81.
Zurück zum Zitat Fleischmann, B., Meyr, H., Wagner, M.: Advanced planning. In: Stadtler, H., Kilger, C. (eds.) Supply Chain Management and Advanced Planning, 4th edn., pp. 81–106. Springer, Berlin (2008) Fleischmann, B., Meyr, H., Wagner, M.: Advanced planning. In: Stadtler, H., Kilger, C. (eds.) Supply Chain Management and Advanced Planning, 4th edn., pp. 81–106. Springer, Berlin (2008)
82.
Zurück zum Zitat Foster, L., Pillai, D.: 300 mm wafer fab logistics and automated material handling systems. In: Doering, R., Nishi, Y. (eds.) Handbook of Semiconductor Manufacturing Technology, pp. 33–1–33–67. CRC Press, USA (2007) Foster, L., Pillai, D.: 300 mm wafer fab logistics and automated material handling systems. In: Doering, R., Nishi, Y. (eds.) Handbook of Semiconductor Manufacturing Technology, pp. 33–1–33–67. CRC Press, USA (2007)
83.
Zurück zum Zitat Fowler, J.W., Robinson, J.: Measurement and improvement of manufacturing capacity (MIMAC): Final report. Technical Report 95062861A-TR, SEMA-TECH, Austin, TX (1995) Fowler, J.W., Robinson, J.: Measurement and improvement of manufacturing capacity (MIMAC): Final report. Technical Report 95062861A-TR, SEMA-TECH, Austin, TX (1995)
84.
Zurück zum Zitat Fowler, J.W., Phillips, D.T., Hogg, G.L.: Real-time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Trans. Semicond. Manuf. 5(2), 158–163 (1992) Fowler, J.W., Phillips, D.T., Hogg, G.L.: Real-time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Trans. Semicond. Manuf. 5(2), 158–163 (1992)
85.
Zurück zum Zitat Fowler, J.W., Hogg, G.L., Phillips, D.T.: Control of multiproduct bulk server diffusion/oxidation processes. Part 2: multiple servers. IIE Trans. Scheduling Logistics 32(2), 167–176 (2000) Fowler, J.W., Hogg, G.L., Phillips, D.T.: Control of multiproduct bulk server diffusion/oxidation processes. Part 2: multiple servers. IIE Trans. Scheduling Logistics 32(2), 167–176 (2000)
86.
Zurück zum Zitat Fowler, J.W., Park, S., Mackulak, G.T., Shunk, D.L.: Efficient cycle time-throughput curve generation using a fixed sample size procedure. Int. J. Prod. Res. 39(12), 2595–2613 (2001) Fowler, J.W., Park, S., Mackulak, G.T., Shunk, D.L.: Efficient cycle time-throughput curve generation using a fixed sample size procedure. Int. J. Prod. Res. 39(12), 2595–2613 (2001)
87.
Zurück zum Zitat Fowler, J.W., Hogg, G.L., Mason, S.J.: Workload control in the semiconductor industry. Prod. Plann. Contr. 13(7), 568–578 (2002) Fowler, J.W., Hogg, G.L., Mason, S.J.: Workload control in the semiconductor industry. Prod. Plann. Contr. 13(7), 568–578 (2002)
88.
Zurück zum Zitat Fowler, J.W., Horng, S., Cochran, J.K.: A hybridized genetic algorithm to solve parallel machine scheduling problems with sequence dependent setups. Int. J. Ind. Eng. 10(3), 232–243 (2003) Fowler, J.W., Horng, S., Cochran, J.K.: A hybridized genetic algorithm to solve parallel machine scheduling problems with sequence dependent setups. Int. J. Ind. Eng. 10(3), 232–243 (2003)
89.
Zurück zum Zitat Fowler, J.W., Rose, O.: Grand challenges in modeling and simulation of complex manufacturing systems. SIMULATION—Trans. Soc. Model. Simulat. Int. 80(9), 469–476 (2004) Fowler, J.W., Rose, O.: Grand challenges in modeling and simulation of complex manufacturing systems. SIMULATION—Trans. Soc. Model. Simulat. Int. 80(9), 469–476 (2004)
90.
Zurück zum Zitat Framinan, J.M., Ruiz, R.: Architecture of manufacturing scheduling systems: literature review and an integrated proposal. Eur. J. Oper. Res. 205(2), 237–246 (2010) Framinan, J.M., Ruiz, R.: Architecture of manufacturing scheduling systems: literature review and an integrated proposal. Eur. J. Oper. Res. 205(2), 237–246 (2010)
91.
Zurück zum Zitat Fu, M.C., Antradttir, S., Carson, J.S., Glover, F., Harrell, C.R., Ho, Y.-C., Kelly, J.P., Robinson, S.M.: Integrating optimization and simulation: research and practice. In: Proceedings of the 2000 Winter Simulation Conference, pp. 610–616 (2000) Fu, M.C., Antradttir, S., Carson, J.S., Glover, F., Harrell, C.R., Ho, Y.-C., Kelly, J.P., Robinson, S.M.: Integrating optimization and simulation: research and practice. In: Proceedings of the 2000 Winter Simulation Conference, pp. 610–616 (2000)
92.
Zurück zum Zitat Fu, M.C.: Optimization for simulation: theory vs. practice. INFORMS J. Comput. 14(3), 192–215 (2002) Fu, M.C.: Optimization for simulation: theory vs. practice. INFORMS J. Comput. 14(3), 192–215 (2002)
93.
Zurück zum Zitat Gan, B.P., Liow, M., Gupta, A.K., Lendermann, P., Turner, S.J., Wang, X.G.: Analysis of a borderless fab using interoperating AutoSched AP models. Int. J. Prod. Res. 45(3), 675–697 (2007) Gan, B.P., Liow, M., Gupta, A.K., Lendermann, P., Turner, S.J., Wang, X.G.: Analysis of a borderless fab using interoperating AutoSched AP models. Int. J. Prod. Res. 45(3), 675–697 (2007)
94.
Zurück zum Zitat Garey, M.R., Johnson, D.S.: Computers and Intractability: A Guide to the Theory of NP-Completeness. Freeman, New York (1979) Garey, M.R., Johnson, D.S.: Computers and Intractability: A Guide to the Theory of NP-Completeness. Freeman, New York (1979)
95.
Zurück zum Zitat Geiger, C.D., Uzsoy, R.: Learning effective dispatching rules for batch processor scheduling. Int. J. Prod. Res. 46(6), 1431–1454 (2008) Geiger, C.D., Uzsoy, R.: Learning effective dispatching rules for batch processor scheduling. Int. J. Prod. Res. 46(6), 1431–1454 (2008)
96.
Zurück zum Zitat Geiger, C.D., Uzsoy, R., Aytug, H.: Rapid modeling and discovery of priority dispatching rules: an autonomous learning approach. J. Scheduling 9(1), 7–34 (2006) Geiger, C.D., Uzsoy, R., Aytug, H.: Rapid modeling and discovery of priority dispatching rules: an autonomous learning approach. J. Scheduling 9(1), 7–34 (2006)
97.
Zurück zum Zitat Geng, N., Jiang, Z.: A review on strategic capacity planning in the semiconductor manufacturing industry. Int. J. Prod. Res. 47(13), 3639–3655 (2009) Geng, N., Jiang, Z.: A review on strategic capacity planning in the semiconductor manufacturing industry. Int. J. Prod. Res. 47(13), 3639–3655 (2009)
98.
Zurück zum Zitat Geng, N., Jiang, Z., Chen, F.: Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand. Eur. J. Oper. Res. 198, 899–908 (2009) Geng, N., Jiang, Z., Chen, F.: Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand. Eur. J. Oper. Res. 198, 899–908 (2009)
99.
Zurück zum Zitat Glassey, P.G.: A comparison of release rules using BLOCS/M simulation. Master’s thesis, University of California, Berkeley (1990) Glassey, P.G.: A comparison of release rules using BLOCS/M simulation. Master’s thesis, University of California, Berkeley (1990)
100.
Zurück zum Zitat Glassey, C.R., Resende, M.G.C.: Closed-loop job release control for VLSI circuit manufacturing. IEEE Trans. Semicond. Manuf. 1(1), 36–46 (1988) Glassey, C.R., Resende, M.G.C.: Closed-loop job release control for VLSI circuit manufacturing. IEEE Trans. Semicond. Manuf. 1(1), 36–46 (1988)
101.
Zurück zum Zitat Glassey, C.R., Weng, W.W.: Dynamic batching heuristic for simultaneous processing. IEEE Trans. Semicond. Manuf. 4(2), 77–82 (1991) Glassey, C.R., Weng, W.W.: Dynamic batching heuristic for simultaneous processing. IEEE Trans. Semicond. Manuf. 4(2), 77–82 (1991)
102.
Zurück zum Zitat Glover, F., Laguna, M.: Tabu Search. Kluwer Academic Publisher, Norwell, MA (1997) Glover, F., Laguna, M.: Tabu Search. Kluwer Academic Publisher, Norwell, MA (1997)
103.
Zurück zum Zitat Goldberg, D.E.: Genetic Algorithms in Search, Optimization and Machine Learning. Addison-Wesley, Reading (1989) Goldberg, D.E.: Genetic Algorithms in Search, Optimization and Machine Learning. Addison-Wesley, Reading (1989)
104.
Zurück zum Zitat Goldratt, E.M., Cox, J.I.: The Goal: A Process of Ongoing Improvement. North River Press, Croton-on-Hudson, New York (1986) Goldratt, E.M., Cox, J.I.: The Goal: A Process of Ongoing Improvement. North River Press, Croton-on-Hudson, New York (1986)
105.
Zurück zum Zitat Goldratt, E.M., Fox, R.: The Race. North River Press, Croton-on-Hudson, New York (1986) Goldratt, E.M., Fox, R.: The Race. North River Press, Croton-on-Hudson, New York (1986)
106.
Zurück zum Zitat Gören, S., Sabuncuoglu, I.: Robustness and stability measures for scheduling: single-machine environment. IIE Trans. 40(1), 66–83 (2008) Gören, S., Sabuncuoglu, I.: Robustness and stability measures for scheduling: single-machine environment. IIE Trans. 40(1), 66–83 (2008)
107.
Zurück zum Zitat Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5, 287–326 (1979) Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5, 287–326 (1979)
108.
Zurück zum Zitat Graves, S.C.: A tactical planning model for a job shop. Oper. Res. 34(4), 522–533 (1986) Graves, S.C.: A tactical planning model for a job shop. Oper. Res. 34(4), 522–533 (1986)
109.
Zurück zum Zitat Gnther, H.-O.: Supply chain management and advanced planning systems: a tutorial. In: Gnther, H.-O., Mattfeld, D.C., Suhl, L. (eds.) Supply Chain Management und Logistik: Optimierung, Simulation, Decision Support, pp. 3–40. Physica, Heidelberg (2005) Gnther, H.-O.: Supply chain management and advanced planning systems: a tutorial. In: Gnther, H.-O., Mattfeld, D.C., Suhl, L. (eds.) Supply Chain Management und Logistik: Optimierung, Simulation, Decision Support, pp. 3–40. Physica, Heidelberg (2005)
110.
Zurück zum Zitat Gupta, J.N.D., Ruiz, R., Fowler, J.W., Mason, S.J.: Operational planning and control of semiconductor wafer production. Prod. Plann. Contr. 17(7), 639–647 (2006) Gupta, J.N.D., Ruiz, R., Fowler, J.W., Mason, S.J.: Operational planning and control of semiconductor wafer production. Prod. Plann. Contr. 17(7), 639–647 (2006)
111.
Zurück zum Zitat Gurnani, H., Anupindi, R., Akella, R.: Control of batch processing systems in semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 5(4), 319–328 (1992) Gurnani, H., Anupindi, R., Akella, R.: Control of batch processing systems in semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 5(4), 319–328 (1992)
112.
Zurück zum Zitat Habenicht, I., Mönch, L.: A finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1406–1413 (2002) Habenicht, I., Mönch, L.: A finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1406–1413 (2002)
113.
Zurück zum Zitat Habla, C., Mnch, L.: Solving volume and capacity planning problems in semiconductor manufacturing: a computational study. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2260–2266 (2008) Habla, C., Mnch, L.: Solving volume and capacity planning problems in semiconductor manufacturing: a computational study. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2260–2266 (2008)
114.
Zurück zum Zitat Ham, M., Fowler, J.W.: Scheduling of wet etch and furnace operations with next arrival control heuristic. Int. J. Adv. Manuf. Technol. 38, 1006–1017 (2008) Ham, M., Fowler, J.W.: Scheduling of wet etch and furnace operations with next arrival control heuristic. Int. J. Adv. Manuf. Technol. 38, 1006–1017 (2008)
115.
Zurück zum Zitat Hansen, P., Mladenović, N.: Variable neighborhood search: principles and applications. Eur. J. Oper. Res. 130(3), 449–467 (2001) Hansen, P., Mladenović, N.: Variable neighborhood search: principles and applications. Eur. J. Oper. Res. 130(3), 449–467 (2001)
116.
Zurück zum Zitat Haupt, R.: A survey of priority rule-based scheduling. OR Spektrum 11(1), 3–16 (1989) Haupt, R.: A survey of priority rule-based scheduling. OR Spektrum 11(1), 3–16 (1989)
117.
Zurück zum Zitat Hood, S.J., Bermon, S., Barahona, F.: Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 16(2), 273–280 (2003) Hood, S.J., Bermon, S., Barahona, F.: Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 16(2), 273–280 (2003)
118.
Zurück zum Zitat Hooke, R., Jeeves, T.A.: Direct search solution of numerical statistical problems. J ACM 8(2), 212–229 (1961) Hooke, R., Jeeves, T.A.: Direct search solution of numerical statistical problems. J ACM 8(2), 212–229 (1961)
119.
Zurück zum Zitat Hopp, W.J., Spearman, M.L.: Factory Physics, 2nd edn. Irwin, McGraw-Hill, Boston (2000) Hopp, W.J., Spearman, M.L.: Factory Physics, 2nd edn. Irwin, McGraw-Hill, Boston (2000)
120.
Zurück zum Zitat Hung, Y.-F., Leachman, R.C.: A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans. Semicond. Manuf. 9(2), 257–269 (1996) Hung, Y.-F., Leachman, R.C.: A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans. Semicond. Manuf. 9(2), 257–269 (1996)
121.
Zurück zum Zitat Hung, Y.-F., Leachman, R.C.: Reduced simulation models of wafer fabrication facilities. Int. J. Prod. Res. 37(12), 2685–2701 (1999) Hung, Y.-F., Leachman, R.C.: Reduced simulation models of wafer fabrication facilities. Int. J. Prod. Res. 37(12), 2685–2701 (1999)
122.
Zurück zum Zitat Hutcheson, J.D.: Introduction to semiconductor equipment. In: Nishi, Y., Doering, R. (eds.) Handbook of Semiconductor Manufacturing Technology, pp. 23–33. Marcel Dekker, New York (2000) Hutcheson, J.D.: Introduction to semiconductor equipment. In: Nishi, Y., Doering, R. (eds.) Handbook of Semiconductor Manufacturing Technology, pp. 23–33. Marcel Dekker, New York (2000)
123.
Zurück zum Zitat Irdem, D.F.: Evaluation of clearing functions’ fitting methodology and performance of production planning models. Master’s thesis, North Carolina State University, Raleigh, North Carolina (2009) Irdem, D.F.: Evaluation of clearing functions’ fitting methodology and performance of production planning models. Master’s thesis, North Carolina State University, Raleigh, North Carolina (2009)
124.
Zurück zum Zitat Irdem, D.F., Kacar, N.B., Uzsoy, R.: An exploratory analysis of two iterative linear programming—simulation approaches for production planning. IEEE Trans. Semicond. Manuf. 23(3), 442–455 (2010) Irdem, D.F., Kacar, N.B., Uzsoy, R.: An exploratory analysis of two iterative linear programming—simulation approaches for production planning. IEEE Trans. Semicond. Manuf. 23(3), 442–455 (2010)
125.
Zurück zum Zitat Jacobs, F.R.: OPT uncovered: many production and scheduling concepts can be applied with or without the software. J. Ind. Eng. 16(10), 32–41 (1984) Jacobs, F.R.: OPT uncovered: many production and scheduling concepts can be applied with or without the software. J. Ind. Eng. 16(10), 32–41 (1984)
126.
Zurück zum Zitat Jampani, J., Mason, S.J.: Column generation heuristic for complex job shop multiple orders per job scheduling. Comput. Ind. Eng. 58(1), 108–118 (2010) Jampani, J., Mason, S.J.: Column generation heuristic for complex job shop multiple orders per job scheduling. Comput. Ind. Eng. 58(1), 108–118 (2010)
127.
Zurück zum Zitat Jampani, J., Pohl, E.A., Mason, S.J., Mnch, L.: Integrated heuristics for scheduling multiple order jobs in a complex job shop. IJMHeur 1(2), 156–180 (2010) Jampani, J., Pohl, E.A., Mason, S.J., Mnch, L.: Integrated heuristics for scheduling multiple order jobs in a complex job shop. IJMHeur 1(2), 156–180 (2010)
128.
Zurück zum Zitat Jeong, B.H., Randhawa, S.U.: A multi-attribute dispatching rule for automated guided vehicle systems. Int. J. Prod. Res. 39(13), 2817–2832 (2001) Jeong, B.H., Randhawa, S.U.: A multi-attribute dispatching rule for automated guided vehicle systems. Int. J. Prod. Res. 39(13), 2817–2832 (2001)
129.
Zurück zum Zitat Jia, J., Mason, S.J.: Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines. Int. J. Prod. Res. 47(10), 2565–2585 (2009) Jia, J., Mason, S.J.: Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines. Int. J. Prod. Res. 47(10), 2565–2585 (2009)
130.
Zurück zum Zitat Jimenez, J., Kim, B., Fowler, J.W., Mackulak, G., Choung, Y.I., Kim, D.-J.: Operational modeling and simulation of an inter-bay AMHS in semiconductor wafer fabrication. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1377–1382 (2002) Jimenez, J., Kim, B., Fowler, J.W., Mackulak, G., Choung, Y.I., Kim, D.-J.: Operational modeling and simulation of an inter-bay AMHS in semiconductor wafer fabrication. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1377–1382 (2002)
131.
Zurück zum Zitat Jimenez, J., Mackulak, G.T., Fowler, J.W.: Levels of capacity and material handling system modeling for factory integration decision making in semiconductor wafer fabs. IEEE Trans. Semicond. Manuf. 21(4), 600–613 (2008) Jimenez, J., Mackulak, G.T., Fowler, J.W.: Levels of capacity and material handling system modeling for factory integration decision making in semiconductor wafer fabs. IEEE Trans. Semicond. Manuf. 21(4), 600–613 (2008)
132.
Zurück zum Zitat Johnson, R.T., Yang, F., Ankenman, B.E., Nelson, B.L.: Nonlinear regression fits for simulated cycle time vs. throughput curves for semiconductor manufacturing. In: Proceedings of the 2004 Winter Simulation Conference, pp. 1951–1955 (2004) Johnson, R.T., Yang, F., Ankenman, B.E., Nelson, B.L.: Nonlinear regression fits for simulated cycle time vs. throughput curves for semiconductor manufacturing. In: Proceedings of the 2004 Winter Simulation Conference, pp. 1951–1955 (2004)
133.
Zurück zum Zitat Johnzén, C.: Modeling and optimizing flexible capacity allocation in semiconductor manufacturing. PhD thesis, Ecole Nationale Supérieure des Mines de Saint-Etienne (2009) Johnzén, C.: Modeling and optimizing flexible capacity allocation in semiconductor manufacturing. PhD thesis, Ecole Nationale Supérieure des Mines de Saint-Etienne (2009)
134.
Zurück zum Zitat Kacar, N.B., Uzsoy, R.: Estimating clearing functions from simulation data. In: Proceedings of the 2010 Winter Simulation Conference, pp. 1699–1710 (2010) Kacar, N.B., Uzsoy, R.: Estimating clearing functions from simulation data. In: Proceedings of the 2010 Winter Simulation Conference, pp. 1699–1710 (2010)
135.
Zurück zum Zitat Kallrath, J., Maindl, T.I.: Real Optimization with SAP APO. Springer, Berlin (2006) Kallrath, J., Maindl, T.I.: Real Optimization with SAP APO. Springer, Berlin (2006)
136.
Zurück zum Zitat Karmarkar, U.S.: Capacitiy loading and release planning with work-in-progress (WIP) and lead-times. J. Manuf. Oper. Manag. 2, 105–123 (1989) Karmarkar, U.S.: Capacitiy loading and release planning with work-in-progress (WIP) and lead-times. J. Manuf. Oper. Manag. 2, 105–123 (1989)
137.
Zurück zum Zitat Kempf, K., Uzsoy, R., Wang, C.-S.: Scheduling a single batch processing machine with secondary ressource constraints. J. Manuf. Syst. 17(1), 37–51 (1998) Kempf, K., Uzsoy, R., Wang, C.-S.: Scheduling a single batch processing machine with secondary ressource constraints. J. Manuf. Syst. 17(1), 37–51 (1998)
138.
Zurück zum Zitat Kendall, D.G.: Stochastic processes occuring in the theory of queues and their analysis by the method of the imbedded Markov chain. Ann. Math. Stochast. 24(3), 338–354 (1953) Kendall, D.G.: Stochastic processes occuring in the theory of queues and their analysis by the method of the imbedded Markov chain. Ann. Math. Stochast. 24(3), 338–354 (1953)
139.
Zurück zum Zitat Kim, B., Kim, S.: Extended model for a hybrid production planning approach. Int. J. Prod. Econ. 73(2), 165–173 (2001) Kim, B., Kim, S.: Extended model for a hybrid production planning approach. Int. J. Prod. Econ. 73(2), 165–173 (2001)
140.
Zurück zum Zitat Kim, S.Y., Lee, Y.H., Agnihotri, D.: A hybrid approach to sequencing jobs using heuristic rules and neural networks. Prod. Plann. Contr. 6(5), 445–454 (1995) Kim, S.Y., Lee, Y.H., Agnihotri, D.: A hybrid approach to sequencing jobs using heuristic rules and neural networks. Prod. Plann. Contr. 6(5), 445–454 (1995)
141.
Zurück zum Zitat Kimms, A.: Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling and lot sizing. Omega—Int. J. Manag. Sci. 26(3), 355–366 (1998) Kimms, A.: Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling and lot sizing. Omega—Int. J. Manag. Sci. 26(3), 355–366 (1998)
142.
Zurück zum Zitat Kirkpatrick, S., Gelatt, C.D., Vecchi, M.P.: Optimization by simulated annealing. Science 220(4598), 671–680 (1983) Kirkpatrick, S., Gelatt, C.D., Vecchi, M.P.: Optimization by simulated annealing. Science 220(4598), 671–680 (1983)
143.
Zurück zum Zitat Kleijnen, J.P.C., van Beers, W.C.M.: Application-driven sequential designs for simulation experiments: Kriging metamodeling. J. Oper. Res. Soc. 55(9), 876–883 (2004) Kleijnen, J.P.C., van Beers, W.C.M.: Application-driven sequential designs for simulation experiments: Kriging metamodeling. J. Oper. Res. Soc. 55(9), 876–883 (2004)
144.
Zurück zum Zitat Kleinberg, J., Tardos, E.: Algorithm Design. Pearson/Addison-Wesley, Boston (2006) Kleinberg, J., Tardos, E.: Algorithm Design. Pearson/Addison-Wesley, Boston (2006)
145.
Zurück zum Zitat Klemmt, A., Horn, S., Weigert, G., Hielscher, T.: Simulation-based and solver-based optimization approaches for batch processes in semiconductor manufacturing. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2041–2049 (2008) Klemmt, A., Horn, S., Weigert, G., Hielscher, T.: Simulation-based and solver-based optimization approaches for batch processes in semiconductor manufacturing. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2041–2049 (2008)
146.
Zurück zum Zitat Klemmt, A., Weigert, G., Almeder, C., Mnch, L.: A comparison of MIP-based decomposition techniques and VNS approaches for batch scheduling problems. In: Proceedings of the 2009 Winter Simulation Conference, pp. 1686–1694 (2009) Klemmt, A., Weigert, G., Almeder, C., Mnch, L.: A comparison of MIP-based decomposition techniques and VNS approaches for batch scheduling problems. In: Proceedings of the 2009 Winter Simulation Conference, pp. 1686–1694 (2009)
147.
Zurück zum Zitat Klemmt, A., Lange, J., Weigert, G., Lehmann, F., Seyfert, J.: A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2474–2485 (2010) Klemmt, A., Lange, J., Weigert, G., Lehmann, F., Seyfert, J.: A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2474–2485 (2010)
148.
Zurück zum Zitat Knust, S.: Shop-scheduling problems with transportation. PhD thesis, University of Osnabrck (1999) Knust, S.: Shop-scheduling problems with transportation. PhD thesis, University of Osnabrck (1999)
149.
Zurück zum Zitat Laub, J.D., Fowler, J.W., Keha, A.B.: Minimizing makespan with multiple-orders-per-job in a two-machine flowshop. Eur. J. Oper. Res. 182(1), 63–79 (2007) Laub, J.D., Fowler, J.W., Keha, A.B.: Minimizing makespan with multiple-orders-per-job in a two-machine flowshop. Eur. J. Oper. Res. 182(1), 63–79 (2007)
150.
Zurück zum Zitat Law, A.W.: Simulation Modeling and Analysis, 4th edn. McGraw-Hill, Boston (2007) Law, A.W.: Simulation Modeling and Analysis, 4th edn. McGraw-Hill, Boston (2007)
151.
Zurück zum Zitat Lawler, E.L.: A “pseudopolynomial” time algorithm for sequencing jobs to minimize total weighted tardiness. Ann. Discrete Math. 1, 331–342 (1977) Lawler, E.L.: A “pseudopolynomial” time algorithm for sequencing jobs to minimize total weighted tardiness. Ann. Discrete Math. 1, 331–342 (1977)
152.
Zurück zum Zitat Le Pape, C.: Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems. Intell. Syst. Eng. 3(2), 55–66 (1994) Le Pape, C.: Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems. Intell. Syst. Eng. 3(2), 55–66 (1994)
153.
Zurück zum Zitat Leach, S.E., Fowler, J.W., Mackulak, G.T., Nelson, B.L., Marquis, J.L.: Asymptotic variance-based sampling for simulating cycle time—throughput curves. ASU Working Paper Series ASUIE-ORPS-2005-003, Arizona State University, Tempe (2005) Leach, S.E., Fowler, J.W., Mackulak, G.T., Nelson, B.L., Marquis, J.L.: Asymptotic variance-based sampling for simulating cycle time—throughput curves. ASU Working Paper Series ASUIE-ORPS-2005-003, Arizona State University, Tempe (2005)
154.
Zurück zum Zitat Leachman, R.C.: Production planning and scheduling practises across the semiconductor industry. SEMATECH Technology Transfer 94092559A-XFR (1995) Leachman, R.C.: Production planning and scheduling practises across the semiconductor industry. SEMATECH Technology Transfer 94092559A-XFR (1995)
155.
Zurück zum Zitat Leachman, R.C., Hodges, D.A.: Benchmarking semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 9(2), 158–169 (1996) Leachman, R.C., Hodges, D.A.: Benchmarking semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 9(2), 158–169 (1996)
156.
Zurück zum Zitat Leachman, R.C., Solorzano, M., Glassey, C.R.: A queue management policy for the release of factory work orders. In: Proceedings of the ORSA/TIMS Conference (1989) Leachman, R.C., Solorzano, M., Glassey, C.R.: A queue management policy for the release of factory work orders. In: Proceedings of the ORSA/TIMS Conference (1989)
157.
Zurück zum Zitat Lee, T.-E.: A review of scheduling theory and methods for semiconductor manufacturing cluster tools. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2127–2135 (2008) Lee, T.-E.: A review of scheduling theory and methods for semiconductor manufacturing cluster tools. In: Proceedings of the 2008 Winter Simulation Conference, pp. 2127–2135 (2008)
158.
Zurück zum Zitat Lee, T.-E.: Semiconductor manufacturing automation. In: Nof, S. (ed.) Handbook on Automation, pp. 911–926. Springer, Berlin (2009) Lee, T.-E.: Semiconductor manufacturing automation. In: Nof, S. (ed.) Handbook on Automation, pp. 911–926. Springer, Berlin (2009)
159.
Zurück zum Zitat Lee, Y.-H., Pinedo, M.: Scheduling jobs on parallel machines with sequence-dependent setup times. Eur. J. Oper. Res. 100(3), 464–474 (1997) Lee, Y.-H., Pinedo, M.: Scheduling jobs on parallel machines with sequence-dependent setup times. Eur. J. Oper. Res. 100(3), 464–474 (1997)
160.
Zurück zum Zitat Levine, D.: Application of a hybrid genetic algorithm to airline crew scheduling. Comput. Oper. Res. 23(6), 547–558 (1996) Levine, D.: Application of a hybrid genetic algorithm to airline crew scheduling. Comput. Oper. Res. 23(6), 547–558 (1996)
161.
Zurück zum Zitat Liao, D.-Y., Fu, H.-S.: Speedy delivery—dynamic OHT allocation and dispatching in large-scale, 300-mm AMHS management. IEEE Robot. Autom. Mag. 11(3), 22–32 (2004) Liao, D.-Y., Fu, H.-S.: Speedy delivery—dynamic OHT allocation and dispatching in large-scale, 300-mm AMHS management. IEEE Robot. Autom. Mag. 11(3), 22–32 (2004)
162.
Zurück zum Zitat Liao, D.-Y., Wang, C.-N.: Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry. Int. J. Adv. Manuf. Tech. 29(9-10), 890–896 (2005) Liao, D.-Y., Wang, C.-N.: Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry. Int. J. Adv. Manuf. Tech. 29(9-10), 890–896 (2005)
163.
Zurück zum Zitat Lin, J.T., Wang, F.-K., Yen, P.-Y.: Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab. Int. J. Prod. Res. 39(6), 1221–1238 (2001) Lin, J.T., Wang, F.-K., Yen, P.-Y.: Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab. Int. J. Prod. Res. 39(6), 1221–1238 (2001)
164.
Zurück zum Zitat Lin, C.-H., Hwang, S.-L., Wang, M.-Y.E.: The mythical advanced planning systems in complex manufacturing environment. In: Proceedings of the 12th IFAC Conference on Information Control Problems in Manufacturing, pp. 691–696 (2006) Lin, C.-H., Hwang, S.-L., Wang, M.-Y.E.: The mythical advanced planning systems in complex manufacturing environment. In: Proceedings of the 12th IFAC Conference on Information Control Problems in Manufacturing, pp. 691–696 (2006)
165.
Zurück zum Zitat Little, J.D.C.: A proof for the queuing formula L = λW. Oper. Res. 9(3), 383–387 (1961) Little, J.D.C.: A proof for the queuing formula L = λW. Oper. Res. 9(3), 383–387 (1961)
166.
Zurück zum Zitat Lou, S.X., Kager, P.W.: A robust production control policy for VLSI wafer fabrication. IEEE Trans. Semicond. Manuf. 2(4), 159–164 (1989) Lou, S.X., Kager, P.W.: A robust production control policy for VLSI wafer fabrication. IEEE Trans. Semicond. Manuf. 2(4), 159–164 (1989)
167.
Zurück zum Zitat Lou, S., Yan, H., Sethi, S., Gardel, A., Deosthali, P.: Hub-centred production control of wafer fabrication. In: Proceedings of the 1990 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 27–32 (1990) Lou, S., Yan, H., Sethi, S., Gardel, A., Deosthali, P.: Hub-centred production control of wafer fabrication. In: Proceedings of the 1990 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 27–32 (1990)
168.
Zurück zum Zitat Lozinski, C., Glassey, C.R.: Bottleneck starvation indicators for shop floor control. IEEE Trans. Semicond. Manuf. 1(4), 147–153 (1988) Lozinski, C., Glassey, C.R.: Bottleneck starvation indicators for shop floor control. IEEE Trans. Semicond. Manuf. 1(4), 147–153 (1988)
169.
Zurück zum Zitat Lu, S.C.H., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans. Semicond. Manuf. 7(3), 374–388 (1994) Lu, S.C.H., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans. Semicond. Manuf. 7(3), 374–388 (1994)
170.
Zurück zum Zitat Martin-Vega, L.A., Pippin, M., Gerdon, E., Burcham, R.: Applying just-in-time in a wafer fab: a case study. IEEE Trans. Semicond. Manuf. 2(1), 16–21 (1989) Martin-Vega, L.A., Pippin, M., Gerdon, E., Burcham, R.: Applying just-in-time in a wafer fab: a case study. IEEE Trans. Semicond. Manuf. 2(1), 16–21 (1989)
171.
Zurück zum Zitat Mason, S.J., Chen, J.-S.: Scheduling multiple orders per job in a single machine to minimize total completion time. Eur. J. Oper. Res. 207(1), 70–77 (2010) Mason, S.J., Chen, J.-S.: Scheduling multiple orders per job in a single machine to minimize total completion time. Eur. J. Oper. Res. 207(1), 70–77 (2010)
172.
Zurück zum Zitat Mason, S.J., Fowler, J.W., Carlyle, M.W.: A modified shifting bottleneck heuristic for minimizing the total weighted tardiness in a semiconductor wafer fab. J. Scheduling 5(3), 247–262 (2002) Mason, S.J., Fowler, J.W., Carlyle, M.W.: A modified shifting bottleneck heuristic for minimizing the total weighted tardiness in a semiconductor wafer fab. J. Scheduling 5(3), 247–262 (2002)
173.
Zurück zum Zitat Mason, S.J., Jin, S., Wessels, M.C.: Rescheduling strategies for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res. 42(3), 613–628 (2004) Mason, S.J., Jin, S., Wessels, M.C.: Rescheduling strategies for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res. 42(3), 613–628 (2004)
174.
Zurück zum Zitat Mason, S.J., Qu, P., Kutanoglu, E., Fowler, J.W.: The single machine multiple orders per job scheduling problem. Technical Report ASUIE-ORPS-2004-004, Arizona State University, Tempe, AZ (2004) Mason, S.J., Qu, P., Kutanoglu, E., Fowler, J.W.: The single machine multiple orders per job scheduling problem. Technical Report ASUIE-ORPS-2004-004, Arizona State University, Tempe, AZ (2004)
175.
Zurück zum Zitat Mason, S.J., Fowler, J.W., Carlyle, M.W., Montgomery, D.C.: Heuristics for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res. 43(10), 1943–1963 (2005) Mason, S.J., Fowler, J.W., Carlyle, M.W., Montgomery, D.C.: Heuristics for minimizing total weighted tardiness in complex job shops. Int. J. Prod. Res. 43(10), 1943–1963 (2005)
176.
Zurück zum Zitat Mathirajan, M., Sivakumar, A.I.: A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. Int. J. Adv. Manuf. Tech. 29(9-10), 990–1001 (2006) Mathirajan, M., Sivakumar, A.I.: A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. Int. J. Adv. Manuf. Tech. 29(9-10), 990–1001 (2006)
177.
Zurück zum Zitat McAllister, C.D., Altunas, B., Frank, M., Potoradi, J.: Implementation of response surface methodology using variance reduction techniques in semiconductor manufacturing. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1225–1230 (2001) McAllister, C.D., Altunas, B., Frank, M., Potoradi, J.: Implementation of response surface methodology using variance reduction techniques in semiconductor manufacturing. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1225–1230 (2001)
178.
Zurück zum Zitat McClellan, M.: Applying Manufacturing Execution Systems. St. Lucie Press, Boca Raton (1997) McClellan, M.: Applying Manufacturing Execution Systems. St. Lucie Press, Boca Raton (1997)
179.
Zurück zum Zitat McFarlane, D.C., Bussmann, S.: Holonic manufacturing control: rationales, developments and open issues. In: Deen, M.S. (ed.) Agent-Based Manufacturing—Advances in the Holonic Approach, pp. 303–326. Springer, Berlin (2003) McFarlane, D.C., Bussmann, S.: Holonic manufacturing control: rationales, developments and open issues. In: Deen, M.S. (ed.) Agent-Based Manufacturing—Advances in the Holonic Approach, pp. 303–326. Springer, Berlin (2003)
180.
Zurück zum Zitat Mehta, S.V., Uzsoy, R.: Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Trans. 30(2), 165–178 (1998) Mehta, S.V., Uzsoy, R.: Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Trans. 30(2), 165–178 (1998)
181.
Zurück zum Zitat Mesarović, M.D., Takahara, Y.: Abstract Systems Theory. Lecture Notes in Control and Information Sciences. Springer, Berlin (1989) Mesarović, M.D., Takahara, Y.: Abstract Systems Theory. Lecture Notes in Control and Information Sciences. Springer, Berlin (1989)
182.
Zurück zum Zitat Meyer, H., Fuchs, F., Thiel, K.: Manufacturing Execution Systems: Optimal Design, Planning, and Deployment. McGraw-Hill, New York (2009) Meyer, H., Fuchs, F., Thiel, K.: Manufacturing Execution Systems: Optimal Design, Planning, and Deployment. McGraw-Hill, New York (2009)
183.
Zurück zum Zitat Michalewicz, Z.: Genetic Algorithms + Data Structures = Evolution Programs. 3rd edn. Springer, Berlin (1996) Michalewicz, Z.: Genetic Algorithms + Data Structures = Evolution Programs. 3rd edn. Springer, Berlin (1996)
184.
Zurück zum Zitat Miller, D.J.: Simulation of a semiconductor manufacturing line. Comm. ACM 30(10), 98–108 (1990) Miller, D.J.: Simulation of a semiconductor manufacturing line. Comm. ACM 30(10), 98–108 (1990)
185.
Zurück zum Zitat Missbauer, H.: Aggregate order release planning for time-varying demand. Int. J. Prod. Res. 40(3), 699–718 (2002) Missbauer, H.: Aggregate order release planning for time-varying demand. Int. J. Prod. Res. 40(3), 699–718 (2002)
186.
Zurück zum Zitat Mittler, M., Schmig, A.: Comparison of dispatching rules for reducing the mean and variability of cycle times in semiconductor manufacturing. In: Proceedings of the International Symposium on Operations Research, pp. 479–485 (1999) Mittler, M., Schmig, A.: Comparison of dispatching rules for reducing the mean and variability of cycle times in semiconductor manufacturing. In: Proceedings of the International Symposium on Operations Research, pp. 479–485 (1999)
187.
Zurück zum Zitat Mittler, M., Schmig, A.: Comparison of dispatching rules for semiconductor manufacturing using large facility models. In: Proceedings of the 1999 Winter Simulation Conference, pp. 709–713 (1999) Mittler, M., Schmig, A.: Comparison of dispatching rules for semiconductor manufacturing using large facility models. In: Proceedings of the 1999 Winter Simulation Conference, pp. 709–713 (1999)
188.
Zurück zum Zitat Mladenović, N., Hansen, P.: Variable neighborhood search. Comput. Oper. Res. 24(11), 1097–1100 (1997) Mladenović, N., Hansen, P.: Variable neighborhood search. Comput. Oper. Res. 24(11), 1097–1100 (1997)
189.
Zurück zum Zitat Mnch, L.: A genetic algorithm heuristic applied to stepper scheduling. In: Proceedings of the International Conference on Modelling and Analysis of Semiconductor Manufacturing (MASM 2002), pp. 276–281 (2002) Mnch, L.: A genetic algorithm heuristic applied to stepper scheduling. In: Proceedings of the International Conference on Modelling and Analysis of Semiconductor Manufacturing (MASM 2002), pp. 276–281 (2002)
190.
Zurück zum Zitat Mnch, L.: Scheduling-Framework fr Jobs auf parallelen Maschinen in komplexen Produktionssystemen. WIRTSCHAFTSINFORMATIK 46(6), 470–480 (2004) Mnch, L.: Scheduling-Framework fr Jobs auf parallelen Maschinen in komplexen Produktionssystemen. WIRTSCHAFTSINFORMATIK 46(6), 470–480 (2004)
191.
Zurück zum Zitat Mnch, L.: Simulation-based assessment of order release strategies for a distributed shifting bottleneck heuristic. In: Proceedings of the 2005 Winter Simulation Conference, pp. 2186–2193 (2005) Mnch, L.: Simulation-based assessment of order release strategies for a distributed shifting bottleneck heuristic. In: Proceedings of the 2005 Winter Simulation Conference, pp. 2186–2193 (2005)
192.
Zurück zum Zitat Mnch, L.: Simulation-based benchmarking of production control schemes for complex manufacturing systems. Contr. Eng. Pract. 15(11), 1381–1393 (2007) Mnch, L.: Simulation-based benchmarking of production control schemes for complex manufacturing systems. Contr. Eng. Pract. 15(11), 1381–1393 (2007)
193.
Zurück zum Zitat Mnch, L., Driessel, R.: A distributed shifting bottleneck heuristic for complex job shops. Comput. Ind. Eng. 49(3), 363–380 (2005) Mnch, L., Driessel, R.: A distributed shifting bottleneck heuristic for complex job shops. Comput. Ind. Eng. 49(3), 363–380 (2005)
194.
Zurück zum Zitat Mnch, L., Habenicht, I.: Simulation-based assessment of batching heuristics in semiconductor manufacturing. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1338–1345 (2003) Mnch, L., Habenicht, I.: Simulation-based assessment of batching heuristics in semiconductor manufacturing. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1338–1345 (2003)
195.
Zurück zum Zitat Mnch, L., Stehli, M.: An ontology for production control of semiconductor manufacturing processes. In: Proceedings First German Conference on Multiagent System Technologies (MATES 2003), LNAI 2831, pp. 156–167 (2003) Mnch, L., Stehli, M.: An ontology for production control of semiconductor manufacturing processes. In: Proceedings First German Conference on Multiagent System Technologies (MATES 2003), LNAI 2831, pp. 156–167 (2003)
196.
Zurück zum Zitat Mnch, L., Stehli, M.: A content language for a hierarchically organized multi-agent-system for production control. In: Proceedings Multi-Konferenz Wirtschaftsinformatik, Teilkonferenz “Coordination and Agent Technology in Value Networks”, pp. 197–212 (2004) Mnch, L., Stehli, M.: A content language for a hierarchically organized multi-agent-system for production control. In: Proceedings Multi-Konferenz Wirtschaftsinformatik, Teilkonferenz “Coordination and Agent Technology in Value Networks”, pp. 197–212 (2004)
197.
Zurück zum Zitat Mnch, L., Zimmermann, J.: Improving the performance of dispatching rules in semiconductor manufacturing by iterative simulation. In: Proceedings of the 2004 Winter Simulation Conference, pp. 1881–1887 (2004) Mnch, L., Zimmermann, J.: Improving the performance of dispatching rules in semiconductor manufacturing by iterative simulation. In: Proceedings of the 2004 Winter Simulation Conference, pp. 1881–1887 (2004)
198.
Zurück zum Zitat Mnch, L., Zimmermann, J.: Simulation-based assessment of machine criticality measures for a shifting bottleneck heuristic in complex manufacturing systems. Comput. Ind. 58(7), 644–655 (2007) Mnch, L., Zimmermann, J.: Simulation-based assessment of machine criticality measures for a shifting bottleneck heuristic in complex manufacturing systems. Comput. Ind. 58(7), 644–655 (2007)
199.
Zurück zum Zitat Mnch, L., Zimmermann, J.: Providing production planning and control functionality by web services: state of the art and experiences with prototypes. In: Proceedings of the 5th Annual IEEE Conference on Automation Science and Engineering, pp. 495–500 (2009) Mnch, L., Zimmermann, J.: Providing production planning and control functionality by web services: state of the art and experiences with prototypes. In: Proceedings of the 5th Annual IEEE Conference on Automation Science and Engineering, pp. 495–500 (2009)
200.
Zurück zum Zitat Mnch, L., Zimmermann, J.: A computational study of a shifting bottleneck heuristic for multi-product complex job shops. Prod. Plann. Contr. 22(1), 25–40 (2011) Mnch, L., Zimmermann, J.: A computational study of a shifting bottleneck heuristic for multi-product complex job shops. Prod. Plann. Contr. 22(1), 25–40 (2011)
201.
Zurück zum Zitat Mnch, L., Prause, M., Schmalfuß, V.: Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1170–1177 (2001) Mnch, L., Prause, M., Schmalfuß, V.: Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1170–1177 (2001)
202.
Zurück zum Zitat Mnch, L., Rose, O., Sturm, R.: A simulation framework for the performance assessment of shop-floor control systems. SIMULATION—Transactions of the Society of Modeling and Simulation International 79(3), 163–170 (2003) Mnch, L., Rose, O., Sturm, R.: A simulation framework for the performance assessment of shop-floor control systems. SIMULATION—Transactions of the Society of Modeling and Simulation International 79(3), 163–170 (2003)
203.
Zurück zum Zitat Mnch, L., Balasubramanian, H., Fowler, J.W., Pfund, M.E.: Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Comput. Oper. Res. 32(11), 2731–2750 (2005) Mnch, L., Balasubramanian, H., Fowler, J.W., Pfund, M.E.: Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Comput. Oper. Res. 32(11), 2731–2750 (2005)
204.
Zurück zum Zitat Mnch, L., Stehli, M., Zimmermann, J., Habenicht, I.: The FABMAS multi-agent-system prototype for production control of wafer fabs: design, implementation and performance assessment. Prod. Plann. Contr. 17(7), 701–716 (2006) Mnch, L., Stehli, M., Zimmermann, J., Habenicht, I.: The FABMAS multi-agent-system prototype for production control of wafer fabs: design, implementation and performance assessment. Prod. Plann. Contr. 17(7), 701–716 (2006)
205.
Zurück zum Zitat Mnch, L., Zimmermann, J., Otto, P.: Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. J. Eng. Appl. Artif. Intell. 19(3), 235–245 (2006) Mnch, L., Zimmermann, J., Otto, P.: Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. J. Eng. Appl. Artif. Intell. 19(3), 235–245 (2006)
206.
Zurück zum Zitat Mnch, L., Schabacker, R., Pabst, D., Fowler, J.W.: Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. Eur. J. Oper. Res. 177(3), 2100–2118 (2007) Mnch, L., Schabacker, R., Pabst, D., Fowler, J.W.: Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. Eur. J. Oper. Res. 177(3), 2100–2118 (2007)
207.
Zurück zum Zitat Mnch, L., Fowler, J.W., Mason, S.J., Dauzère-Pérès, S., Rose, O.: A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Scheduling 14(6), 583–599 (2011) Mnch, L., Fowler, J.W., Mason, S.J., Dauzère-Pérès, S., Rose, O.: A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Scheduling 14(6), 583–599 (2011)
208.
Zurück zum Zitat Montgomery, D.C.: Design and Analysis of Experiments, 5th edn. Wiley, New York (2001) Montgomery, D.C.: Design and Analysis of Experiments, 5th edn. Wiley, New York (2001)
209.
Zurück zum Zitat Montoya-Torres, J.R.: A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs. Prod. Plann. Contr. 17(7), 648–663 (2006) Montoya-Torres, J.R.: A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs. Prod. Plann. Contr. 17(7), 648–663 (2006)
210.
Zurück zum Zitat Mosley, S.A., Teyner, T., Uzsoy, R.: Maintenance scheduling and staffing policies in a wafer fabrication facility operating under theory of constraints. IEEE Trans. Semicond. Manuf. 11(2), 316–323 (1998) Mosley, S.A., Teyner, T., Uzsoy, R.: Maintenance scheduling and staffing policies in a wafer fabrication facility operating under theory of constraints. IEEE Trans. Semicond. Manuf. 11(2), 316–323 (1998)
211.
Zurück zum Zitat Moyne, J., del Castillo, E.D., Hurwitz, A.: Run-to-Run Control in Semiconductor Manufacturing. CRC Press, Chichester (2001) Moyne, J., del Castillo, E.D., Hurwitz, A.: Run-to-Run Control in Semiconductor Manufacturing. CRC Press, Chichester (2001)
212.
Zurück zum Zitat Myers, R.H., Montgomery, D.C., Anderson-Cook, C.M.: Response Surface Methodology: Process and Product Optimization Using Designed Experiments, 3rd edn. Wiley, New Jersey (2009) Myers, R.H., Montgomery, D.C., Anderson-Cook, C.M.: Response Surface Methodology: Process and Product Optimization Using Designed Experiments, 3rd edn. Wiley, New Jersey (2009)
213.
Zurück zum Zitat Najmi, A., Lozinski, C.: Managing factory productivity using object-oriented simulation for setting shift production targets in VLSI manufacturing. In: Proceedings AUTOFACT ’89, pp. (3–1)–(3–14) (1989) Najmi, A., Lozinski, C.: Managing factory productivity using object-oriented simulation for setting shift production targets in VLSI manufacturing. In: Proceedings AUTOFACT ’89, pp. (3–1)–(3–14) (1989)
214.
Zurück zum Zitat Nemhauser, G., Wolsey, L.A.: Integer and Combinatorial Optimization, 3rd edn. Wiley, New York (1999) Nemhauser, G., Wolsey, L.A.: Integer and Combinatorial Optimization, 3rd edn. Wiley, New York (1999)
215.
Zurück zum Zitat Nowicki, E., Smutnicki, C.: An advanced tabu search algorithm for the job shop problem. J. Scheduling 8(2), 145–159 (2005) Nowicki, E., Smutnicki, C.: An advanced tabu search algorithm for the job shop problem. J. Scheduling 8(2), 145–159 (2005)
216.
Zurück zum Zitat Occhino, T.J.: Capacity planning model: the important inputs, formulas, and benefits. In: Proceedings of the 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 455–458 (2000) Occhino, T.J.: Capacity planning model: the important inputs, formulas, and benefits. In: Proceedings of the 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 455–458 (2000)
217.
Zurück zum Zitat Odell, J.J., Parunak, H.V.D., Fleischer, M.: Modeling agent organizations using roles. Software Syst. Model. 2(2), 76–81 (2003) Odell, J.J., Parunak, H.V.D., Fleischer, M.: Modeling agent organizations using roles. Software Syst. Model. 2(2), 76–81 (2003)
218.
Zurück zum Zitat Oechsner, S., Rose, O.: A filtered beam search approach to scheduling cluster tools in semiconductor manufacturing. In: Proceedings of the Industrial Engineering Research Conference (2005) Oechsner, S., Rose, O.: A filtered beam search approach to scheduling cluster tools in semiconductor manufacturing. In: Proceedings of the Industrial Engineering Research Conference (2005)
219.
Zurück zum Zitat Oechsner, S., Rose, O.: Scheduling cluster tools using filtered beam search and recipe comparison. In: Proceedings of the 2005 Winter Simulation Conference, pp. 2203–2210 (2005) Oechsner, S., Rose, O.: Scheduling cluster tools using filtered beam search and recipe comparison. In: Proceedings of the 2005 Winter Simulation Conference, pp. 2203–2210 (2005)
221.
Zurück zum Zitat Osisek, V., Aytug, H.: Discovering subproblem prioritization rules for shifting bottleneck algorithms. J. Intell. Manuf. 15(1), 55–67 (2003) Osisek, V., Aytug, H.: Discovering subproblem prioritization rules for shifting bottleneck algorithms. J. Intell. Manuf. 15(1), 55–67 (2003)
222.
Zurück zum Zitat Ovacik, I.M., Uzsoy, R.: Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent setup times. Int. J. Prod. Res. 33(11), 3173–3192 (1995) Ovacik, I.M., Uzsoy, R.: Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent setup times. Int. J. Prod. Res. 33(11), 3173–3192 (1995)
223.
Zurück zum Zitat Ovacik, I.M., Uzsoy, R.: Decomposition Methods for Complex Factory Scheduling Problems. Kluwer, Norwell (1997) Ovacik, I.M., Uzsoy, R.: Decomposition Methods for Complex Factory Scheduling Problems. Kluwer, Norwell (1997)
224.
Zurück zum Zitat Ozturk, O., Coburn, M.B., Kitterman, S.: Conceptualization, design and implementation of a static capacity model. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1373–1376 (2003) Ozturk, O., Coburn, M.B., Kitterman, S.: Conceptualization, design and implementation of a static capacity model. In: Proceedings of the 2003 Winter Simulation Conference, pp. 1373–1376 (2003)
225.
Zurück zum Zitat Pabst, D.: Handling precedence constraints for the shifting bottleneck heuristic applied in a dynamic semiconductor manufacturing environment. Master’s thesis, Institut fr Informatik, Universitt Wrzburg, Wrzburg (2003) Pabst, D.: Handling precedence constraints for the shifting bottleneck heuristic applied in a dynamic semiconductor manufacturing environment. Master’s thesis, Institut fr Informatik, Universitt Wrzburg, Wrzburg (2003)
226.
Zurück zum Zitat Pahl, J., Voß, S., Woodruff, D.L.: Production planning with load dependent lead times: an update of research. Ann. Oper. Res. 153(1), 297–345 (2007) Pahl, J., Voß, S., Woodruff, D.L.: Production planning with load dependent lead times: an update of research. Ann. Oper. Res. 153(1), 297–345 (2007)
227.
Zurück zum Zitat Pain, A.R., Reeves, C.R.: Genetic algorithm optimization software class libraries. In: Voß, S., Woodruff, D.L. (eds.) Optimization Software Class Libraries, pp. 295–329. Springer, New York (2002) Pain, A.R., Reeves, C.R.: Genetic algorithm optimization software class libraries. In: Voß, S., Woodruff, D.L. (eds.) Optimization Software Class Libraries, pp. 295–329. Springer, New York (2002)
228.
Zurück zum Zitat Park, S., Fowler, J.W., Carlyle, M.W., Hickie, M.: Assessment of potential gains in productivity due to proactive reticle management using discrete event simulation. In: Proceedings of the 1999 Winter Simulation Conference, pp. 856–864 (1999) Park, S., Fowler, J.W., Carlyle, M.W., Hickie, M.: Assessment of potential gains in productivity due to proactive reticle management using discrete event simulation. In: Proceedings of the 1999 Winter Simulation Conference, pp. 856–864 (1999)
229.
Zurück zum Zitat Park, Y., Kim, S., Lee, Y.-H.: Scheduling jobs on parallel machines applying neural networks and heuristic rules. Comput. Ind. Eng. 38(1), 189–202 (2000) Park, Y., Kim, S., Lee, Y.-H.: Scheduling jobs on parallel machines applying neural networks and heuristic rules. Comput. Ind. Eng. 38(1), 189–202 (2000)
230.
Zurück zum Zitat Park, S., Fowler, J.W., Mackulak, G.T., Keats, J.B., Carlyle, W.M.: D-optimal sequential experiments for generating a simulation-based cycle time-throughput curve. Oper. Res. 50(6), 981–990 (2002) Park, S., Fowler, J.W., Mackulak, G.T., Keats, J.B., Carlyle, W.M.: D-optimal sequential experiments for generating a simulation-based cycle time-throughput curve. Oper. Res. 50(6), 981–990 (2002)
231.
Zurück zum Zitat Peikert, A., Thoma, J., Brown, S.: A rapid modeling technique for measurable improvements in factory performance. In: Proceedings of the 1998 Winter Simulation Conference, pp. 1011–1016 (1998) Peikert, A., Thoma, J., Brown, S.: A rapid modeling technique for measurable improvements in factory performance. In: Proceedings of the 1998 Winter Simulation Conference, pp. 1011–1016 (1998)
232.
Zurück zum Zitat Perez, I.C., Fowler, J.W., Carlyle, W.M.: Minimizing total weighted tardiness on a single batch processing machine with incompatible job families. Comput. Oper. Res. 32(2), 327–341 (2005) Perez, I.C., Fowler, J.W., Carlyle, W.M.: Minimizing total weighted tardiness on a single batch processing machine with incompatible job families. Comput. Oper. Res. 32(2), 327–341 (2005)
233.
Zurück zum Zitat Pfeiffer, A., Kadar, B., Monostori, L.: Stability-oriented evaluation of rescheduling strategies by using simulation. Comput. Ind. 58(7), 630–643 (2007) Pfeiffer, A., Kadar, B., Monostori, L.: Stability-oriented evaluation of rescheduling strategies by using simulation. Comput. Ind. 58(7), 630–643 (2007)
234.
Zurück zum Zitat Pfund, M.E., Mason, S.J., Fowler, J.W.: Semiconductor manufacturing scheduling and dispatching. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 213–241. Springer, New York (2006) Pfund, M.E., Mason, S.J., Fowler, J.W.: Semiconductor manufacturing scheduling and dispatching. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 213–241. Springer, New York (2006)
235.
Zurück zum Zitat Pfund, M.E., Balasubramanian, H., Fowler, J.W., Mason, S.J., Rose, O.: A multi-criteria approach for scheduling semiconductor wafer fabrication facilities. J. Scheduling 11(1), 29–47 (2008) Pfund, M.E., Balasubramanian, H., Fowler, J.W., Mason, S.J., Rose, O.: A multi-criteria approach for scheduling semiconductor wafer fabrication facilities. J. Scheduling 11(1), 29–47 (2008)
236.
Zurück zum Zitat Pfund, M.E., Fowler, J.W., Gadkari, A., Chen, Y.: Scheduling jobs on parallel machines with setup times and ready times. Comput. Ind. Eng. 54(4), 764–782 (2008) Pfund, M.E., Fowler, J.W., Gadkari, A., Chen, Y.: Scheduling jobs on parallel machines with setup times and ready times. Comput. Ind. Eng. 54(4), 764–782 (2008)
237.
Zurück zum Zitat Pickardt, C., Branke, J., Hildebrandt, T., Heger, J., Scholz-Reiter, B.: Generating dispatching rules in semiconductor manufacturing to minimize weighted tardiness. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2504–2515 (2010) Pickardt, C., Branke, J., Hildebrandt, T., Heger, J., Scholz-Reiter, B.: Generating dispatching rules in semiconductor manufacturing to minimize weighted tardiness. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2504–2515 (2010)
238.
Zurück zum Zitat Pickerill, J.: Better cycle time and on-time delivery via real-time dispatching. Solid State Tech. 43(6), 151–154 (2000) Pickerill, J.: Better cycle time and on-time delivery via real-time dispatching. Solid State Tech. 43(6), 151–154 (2000)
239.
Zurück zum Zitat Pillai, D.D., Bass, E.L., Dempsey, J.C., Yellig, E.J.: 300-mm full-factory simulations for 90- and 65-nm IC manufacturing. IEEE Trans. Semicond. Manuf. 17(3), 292–298 (2004) Pillai, D.D., Bass, E.L., Dempsey, J.C., Yellig, E.J.: 300-mm full-factory simulations for 90- and 65-nm IC manufacturing. IEEE Trans. Semicond. Manuf. 17(3), 292–298 (2004)
240.
Zurück zum Zitat Pinedo, M.: Scheduling: Theory, Algorithms, and Systems, 3rd edn. Springer, New York (2008) Pinedo, M.: Scheduling: Theory, Algorithms, and Systems, 3rd edn. Springer, New York (2008)
241.
Zurück zum Zitat Pinedo, M., Chao, X.: Operations Scheduling with Applications in Manufacturing and Services. Irwin McGraw-Hill, New York (1999) Pinedo, M., Chao, X.: Operations Scheduling with Applications in Manufacturing and Services. Irwin McGraw-Hill, New York (1999)
242.
Zurück zum Zitat Pinedo, M., Singer, M.: A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Nav. Res. Logist. 46(1), 1–17 (1999) Pinedo, M., Singer, M.: A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Nav. Res. Logist. 46(1), 1–17 (1999)
243.
Zurück zum Zitat Pochet, Y., Wolsey, L.A.: Production Planning by Mixed Integer Programming. Springer, New York (2006) Pochet, Y., Wolsey, L.A.: Production Planning by Mixed Integer Programming. Springer, New York (2006)
244.
Zurück zum Zitat Ponsignon, T., Mnch, L.: Architecture for simulation-based performance assessment of planning approaches in semiconductor manufacturing. In: Proceedings of the 2010 Winter Simulation Conference, pp. 3341–3349 (2010) Ponsignon, T., Mnch, L.: Architecture for simulation-based performance assessment of planning approaches in semiconductor manufacturing. In: Proceedings of the 2010 Winter Simulation Conference, pp. 3341–3349 (2010)
245.
Zurück zum Zitat Ponsignon, T., Mnch, L.: Heuristic approaches for master planning in semiconductor manufacturing. Comput. Oper. Res. 39(3), 479–491 (2012) Ponsignon, T., Mnch, L.: Heuristic approaches for master planning in semiconductor manufacturing. Comput. Oper. Res. 39(3), 479–491 (2012)
246.
Zurück zum Zitat Potoradi, J., Boon, O.S., Mason, S.J., Fowler, J.W., Pfund, M.E.: Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1857–1861 (2002) Potoradi, J., Boon, O.S., Mason, S.J., Fowler, J.W., Pfund, M.E.: Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1857–1861 (2002)
247.
Zurück zum Zitat Potts, C.N., Kovalyov, M.Y.: Scheduling with batching: a review. Eur. J. Oper. Res. 120(2), 228–249 (2000) Potts, C.N., Kovalyov, M.Y.: Scheduling with batching: a review. Eur. J. Oper. Res. 120(2), 228–249 (2000)
248.
Zurück zum Zitat Preiss, B.R.: Data Structures and Algorithms with Object-Oriented Design Patterns in C++. Wiley, Chichester (1999) Preiss, B.R.: Data Structures and Algorithms with Object-Oriented Design Patterns in C++. Wiley, Chichester (1999)
249.
Zurück zum Zitat Pukelsheim, F.: Optimal Design of Experiments. SIAM, Philadelphia (2006) Pukelsheim, F.: Optimal Design of Experiments. SIAM, Philadelphia (2006)
250.
Zurück zum Zitat Qi, C., Sivakumar, A.I., Gershwin, S.B.: Impact of production control and system factors in semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 21(3), 376–389 (2008) Qi, C., Sivakumar, A.I., Gershwin, S.B.: Impact of production control and system factors in semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 21(3), 376–389 (2008)
251.
Zurück zum Zitat Qi, C., Sivakumar, A.I., Gershwin, S.B.: An efficient new job release control methodology. Int. J. Prod. Res. 47(3), 703–731 (2009) Qi, C., Sivakumar, A.I., Gershwin, S.B.: An efficient new job release control methodology. Int. J. Prod. Res. 47(3), 703–731 (2009)
252.
Zurück zum Zitat Qiu, R.G.: E-manufacturing: the keystone of a plant-wide real time information system. J. Chin. Inst. Ind. Eng. 20(3), 266–274 (2003) Qiu, R.G.: E-manufacturing: the keystone of a plant-wide real time information system. J. Chin. Inst. Ind. Eng. 20(3), 266–274 (2003)
253.
Zurück zum Zitat Qiu, R.G.: A service-oriented integration framework for semiconductor manufacturing systems. Int. J. Manuf. Tech. Manag. 10(2/3), 177–191 (2007) Qiu, R.G.: A service-oriented integration framework for semiconductor manufacturing systems. Int. J. Manuf. Tech. Manag. 10(2/3), 177–191 (2007)
254.
Zurück zum Zitat Qu, P., Mason, S.J.: Metaheuristic scheduling of 300mm lots containing multiple orders. IEEE Trans. Semicond. Manuf. 18(4), 633–643 (2005) Qu, P., Mason, S.J.: Metaheuristic scheduling of 300mm lots containing multiple orders. IEEE Trans. Semicond. Manuf. 18(4), 633–643 (2005)
255.
Zurück zum Zitat Qiu, R.G., Zhou, M.: Mighty MESs: state-of-the-art and future manufacturing execution systems. IEEE Robot. Autom. Mag. 80(1), 19–25 (2004) Qiu, R.G., Zhou, M.: Mighty MESs: state-of-the-art and future manufacturing execution systems. IEEE Robot. Autom. Mag. 80(1), 19–25 (2004)
256.
Zurück zum Zitat Ragatz, G.L., Mabert, V.A.: An evaluation of order release mechanisms in a job-shop environment. Decis. Sci. 19(1), 167–189 (1988) Ragatz, G.L., Mabert, V.A.: An evaluation of order release mechanisms in a job-shop environment. Decis. Sci. 19(1), 167–189 (1988)
257.
Zurück zum Zitat Rardin, R.L., Uzsoy, R.: Experimental evaluation of heuristic optimization algorithms: a tutorial. J. Heuristics 7(3), 261–304 (2001) Rardin, R.L., Uzsoy, R.: Experimental evaluation of heuristic optimization algorithms: a tutorial. J. Heuristics 7(3), 261–304 (2001)
258.
Zurück zum Zitat Rastogi, A.P., Fowler, J.W., Carlyle, W.M., Araz, O.M., Maltz, A., Bke, B.: Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations. Int. J. Prod. Econ. 134(2), 322–332 (2011) Rastogi, A.P., Fowler, J.W., Carlyle, W.M., Araz, O.M., Maltz, A., Bke, B.: Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations. Int. J. Prod. Econ. 134(2), 322–332 (2011)
259.
Zurück zum Zitat Reichelt, D., Mnch, L.: Multiobjective scheduling of jobs with incompatible families on parallel batch machines. In: Proceedings EvoCop 2006, LNCS 3906, pp. 209–221 (2006) Reichelt, D., Mnch, L.: Multiobjective scheduling of jobs with incompatible families on parallel batch machines. In: Proceedings EvoCop 2006, LNCS 3906, pp. 209–221 (2006)
260.
Zurück zum Zitat Robinson, J., Fowler, J.W., Bard, J.F.: The use of upstream and downstream information in scheduling semiconductor batch operations. Int. J. Prod. Res. 33(7), 1849–1869 (1995) Robinson, J., Fowler, J.W., Bard, J.F.: The use of upstream and downstream information in scheduling semiconductor batch operations. Int. J. Prod. Res. 33(7), 1849–1869 (1995)
261.
Zurück zum Zitat Robinson, J., Fowler, J.W., Bard, J.F.: A review of real-time control strategies for furnace batch sizing in semiconductor manufacturing. Technical report, FabTime Inc. (2000) Robinson, J., Fowler, J.W., Bard, J.F.: A review of real-time control strategies for furnace batch sizing in semiconductor manufacturing. Technical report, FabTime Inc. (2000)
262.
Zurück zum Zitat Roderick, L.M., Phillips, D.T., Hogg, G.L.: A comparison of order release strategies in production control systems. Int. J. Prod. Res. 30(3), 611–626 (1992) Roderick, L.M., Phillips, D.T., Hogg, G.L.: A comparison of order release strategies in production control systems. Int. J. Prod. Res. 30(3), 611–626 (1992)
263.
Zurück zum Zitat Rose, O.: WIP evolution of a semiconductor factory after a bottleneck workcenter breakdown. In: Proceedings of the 1998 Winter Simulation Conference, pp. 997–1003 (1998) Rose, O.: WIP evolution of a semiconductor factory after a bottleneck workcenter breakdown. In: Proceedings of the 1998 Winter Simulation Conference, pp. 997–1003 (1998)
264.
Zurück zum Zitat Rose, O.: CONLOAD—a new lot release rule for semiconductor wafer fabs. In: Proceedings of the 1999 Winter Simulation Conference, pp. 850–855 (1999) Rose, O.: CONLOAD—a new lot release rule for semiconductor wafer fabs. In: Proceedings of the 1999 Winter Simulation Conference, pp. 850–855 (1999)
265.
Zurück zum Zitat Rose, O.: Why do simple wafer fab models fail in certain scenarios? In: Proceedings of the 2000 Winter Simulation Conference, pp. 1481–1490 (2000) Rose, O.: Why do simple wafer fab models fail in certain scenarios? In: Proceedings of the 2000 Winter Simulation Conference, pp. 1481–1490 (2000)
266.
Zurück zum Zitat Rose, O.: CONWIP-like lot release for a wafer fabrication facility with dynamic load changes. In: Proceedings of the SMOMS ’01 (ASTC ’01), pp. 41–46 (2001) Rose, O.: CONWIP-like lot release for a wafer fabrication facility with dynamic load changes. In: Proceedings of the SMOMS ’01 (ASTC ’01), pp. 41–46 (2001)
267.
Zurück zum Zitat Rose, O.: The shortest processing time first (SPTF) dispatch rule and some variants in semiconductor manufacturing. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1220–1224 (2001) Rose, O.: The shortest processing time first (SPTF) dispatch rule and some variants in semiconductor manufacturing. In: Proceedings of the 2001 Winter Simulation Conference, pp. 1220–1224 (2001)
268.
Zurück zum Zitat Rose, O.: Some issues of the critical ratio dispatch rule in semiconductor manufacturing. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1401–1405 (2002) Rose, O.: Some issues of the critical ratio dispatch rule in semiconductor manufacturing. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1401–1405 (2002)
269.
Zurück zum Zitat Rose, O.: Improved simple simulation models for semiconductor wafer factories. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1708–1712 (2007) Rose, O.: Improved simple simulation models for semiconductor wafer factories. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1708–1712 (2007)
270.
Zurück zum Zitat Rothlauf, F.: Representations for Genetic and Evolutionary Algorithms, 2nd edn. Springer, Berlin (2006) Rothlauf, F.: Representations for Genetic and Evolutionary Algorithms, 2nd edn. Springer, Berlin (2006)
271.
Zurück zum Zitat Roundy, R.: Report on practices related to demand forecasting for semiconductor products. Technical report, School of Operations Research and Industrial Engineering, Cornell University (2001) Roundy, R.: Report on practices related to demand forecasting for semiconductor products. Technical report, School of Operations Research and Industrial Engineering, Cornell University (2001)
272.
Zurück zum Zitat Rudolph, G.: Convergence analysis of canonical genetic algorithms. IEEE Trans. Neural Network 5(1), 96–101 (1994) Rudolph, G.: Convergence analysis of canonical genetic algorithms. IEEE Trans. Neural Network 5(1), 96–101 (1994)
273.
Zurück zum Zitat Russell, S.J., Norvig, P.: Artificial Intelligence—A Modern Approach, 2nd edn. Prentice Hall, New Jersey (2003) Russell, S.J., Norvig, P.: Artificial Intelligence—A Modern Approach, 2nd edn. Prentice Hall, New Jersey (2003)
274.
Zurück zum Zitat Sarin, S.C., Varadarajan, A., Wang, L.: A survey of dispatching rules for operational control in wafer fabrication. Prod. Plann. Contr. 22(1), 4–24 (2011) Sarin, S.C., Varadarajan, A., Wang, L.: A survey of dispatching rules for operational control in wafer fabrication. Prod. Plann. Contr. 22(1), 4–24 (2011)
275.
Zurück zum Zitat Scholl, W., Domaschke, J.: Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations. IEEE Trans. Semicond. Manuf. 13(3), 273–277 (2000) Scholl, W., Domaschke, J.: Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations. IEEE Trans. Semicond. Manuf. 13(3), 273–277 (2000)
276.
Zurück zum Zitat Schömig, A., Fowler, J.W.: Modeling semiconductor manufacturing operations. In: Proceedings of the 9th ASIM Dedicated Conference Simulation in Production and Logistics, pp. 55–64 (2000) Schömig, A., Fowler, J.W.: Modeling semiconductor manufacturing operations. In: Proceedings of the 9th ASIM Dedicated Conference Simulation in Production and Logistics, pp. 55–64 (2000)
277.
Zurück zum Zitat Schömig, A., Rose, O.: On the suitability of the Weibull distribution for the approximation of machine failures. In: Proceedings of the 2003 Industrial Engineering Research Conference (2003) Schömig, A., Rose, O.: On the suitability of the Weibull distribution for the approximation of machine failures. In: Proceedings of the 2003 Industrial Engineering Research Conference (2003)
278.
Zurück zum Zitat Schulz, M., Stanley, T.D., Renelt, B., Sturm, R., Schwertschlager, O.: Simulation based decision support for future 300mm automated material handling. In: Proceedings of the 2000 Winter Simulation Conference, pp. 1518–1522 (2000) Schulz, M., Stanley, T.D., Renelt, B., Sturm, R., Schwertschlager, O.: Simulation based decision support for future 300mm automated material handling. In: Proceedings of the 2000 Winter Simulation Conference, pp. 1518–1522 (2000)
280.
Zurück zum Zitat SEMI-E10-0304E. Specification for definition and measurement of equipment reliability, availability, and maintainability (RAM) (2004) SEMI-E10-0304E. Specification for definition and measurement of equipment reliability, availability, and maintainability (RAM) (2004)
281.
Zurück zum Zitat Shanthikumar, J.G., Ding, S., Zhang, M.T.: Queueing theory for semiconductor manufacturing systems: a survey and open problems. IEEE Trans. Autom. Sci. Eng. 4(4), 513–522 (2007) Shanthikumar, J.G., Ding, S., Zhang, M.T.: Queueing theory for semiconductor manufacturing systems: a survey and open problems. IEEE Trans. Autom. Sci. Eng. 4(4), 513–522 (2007)
282.
Zurück zum Zitat Shikalgar, S.T., Fronckowiak, D., MacNair, E.A.: 300mm wafer fabrication line simulation model. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1365–1368 (2002) Shikalgar, S.T., Fronckowiak, D., MacNair, E.A.: 300mm wafer fabrication line simulation model. In: Proceedings of the 2002 Winter Simulation Conference, pp. 1365–1368 (2002)
283.
Zurück zum Zitat Simchi-Levi, D., Kaminsky, P., Simchi-Levi, E.: Designing and Managing the Supply Chain. McGraw-Hill, Boston (2000) Simchi-Levi, D., Kaminsky, P., Simchi-Levi, E.: Designing and Managing the Supply Chain. McGraw-Hill, Boston (2000)
284.
Zurück zum Zitat Sivakumar, A.I.: Multiobjective dynamic scheduling using discrete event simulation. Int. J. Comput. Integrated Manuf. 14(2), 154–167 (2001) Sivakumar, A.I.: Multiobjective dynamic scheduling using discrete event simulation. Int. J. Comput. Integrated Manuf. 14(2), 154–167 (2001)
285.
Zurück zum Zitat Sivakumar, A.I., Gupta, A.K.: Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling. IEEE Trans. Electron. Packag. Manuf. 29(2), 99–109 (2006) Sivakumar, A.I., Gupta, A.K.: Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling. IEEE Trans. Electron. Packag. Manuf. 29(2), 99–109 (2006)
286.
Zurück zum Zitat Sobeyko, O., Mnch, L.: Genetic algorithms to solve a single machine multiple orders per job scheduling problem. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2493–2503 (2010) Sobeyko, O., Mnch, L.: Genetic algorithms to solve a single machine multiple orders per job scheduling problem. In: Proceedings of the 2010 Winter Simulation Conference, pp. 2493–2503 (2010)
287.
Zurück zum Zitat Solomon, L., Fowler, J.W., Pfund, M.E., Jensen, P.H.: The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions. J. Electron. Manuf. 11(2), 149–159 (2002) Solomon, L., Fowler, J.W., Pfund, M.E., Jensen, P.H.: The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions. J. Electron. Manuf. 11(2), 149–159 (2002)
288.
Zurück zum Zitat Sourirajan, K., Uzsoy, R.: Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. J. Scheduling 10(1), 41–65 (2007) Sourirajan, K., Uzsoy, R.: Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. J. Scheduling 10(1), 41–65 (2007)
289.
Zurück zum Zitat Spearman, M.L., Hopp, W.J., Woodruff, D.L.: A hierarchical control architecture for constant work-in-process (CONWIP) production systems. J. Manuf. Oper. Manag. 2(3), 147–171 (1989) Spearman, M.L., Hopp, W.J., Woodruff, D.L.: A hierarchical control architecture for constant work-in-process (CONWIP) production systems. J. Manuf. Oper. Manag. 2(3), 147–171 (1989)
290.
Zurück zum Zitat Spearman, M.L., Woodruff, D.L., Hopp, W.J.: CONWIP: a pull alternative to Kanban. Int. J. Prod. Res. 28(5), 879–894 (1990) Spearman, M.L., Woodruff, D.L., Hopp, W.J.: CONWIP: a pull alternative to Kanban. Int. J. Prod. Res. 28(5), 879–894 (1990)
291.
Zurück zum Zitat Spier, J., Kempf, K.: Simulation of emergent behavior in manufacturing systems. In: Proceedings of the 1995 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 90–94 (1995) Spier, J., Kempf, K.: Simulation of emergent behavior in manufacturing systems. In: Proceedings of the 1995 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 90–94 (1995)
292.
Zurück zum Zitat Srinivasan, A., Carey, M., Morton, T.E.: Resource pricing and aggregate scheduling in manufacturing systems. GSIA Working Papers 88-89-58, Carnegie Mellon University, Tepper School of Business, Pittsburgh (1988) Srinivasan, A., Carey, M., Morton, T.E.: Resource pricing and aggregate scheduling in manufacturing systems. GSIA Working Papers 88-89-58, Carnegie Mellon University, Tepper School of Business, Pittsburgh (1988)
293.
Zurück zum Zitat Stray, J., Fowler, J.W., Carlyle, W.M., Rastogi, A.P.: Enterprise-wide strategic and logistics planning for semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 19(2), 259–268 (2006) Stray, J., Fowler, J.W., Carlyle, W.M., Rastogi, A.P.: Enterprise-wide strategic and logistics planning for semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 19(2), 259–268 (2006)
294.
Zurück zum Zitat Sze, S.M.: Semiconductor Devices: Physics and Technology, 2nd edn. Wiley, New York (2001) Sze, S.M.: Semiconductor Devices: Physics and Technology, 2nd edn. Wiley, New York (2001)
295.
Zurück zum Zitat Tay, J.C., Ho, N.B.: Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Comput. Ind. Eng. 54(3), 453–473 (2008) Tay, J.C., Ho, N.B.: Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Comput. Ind. Eng. 54(3), 453–473 (2008)
296.
Zurück zum Zitat Thiel, M.: Simulationsbasierte Reihenfolgeplanung in der Halbleiterindustrie. PhD thesis, Technical University of Ilmenau (2001) Thiel, M.: Simulationsbasierte Reihenfolgeplanung in der Halbleiterindustrie. PhD thesis, Technical University of Ilmenau (2001)
297.
Zurück zum Zitat Thiel, M., Schulz, R., Gmilkowsky, P.: Simulation-based production control in the semiconductor industry. In: Proceedings of the 1998 Winter Simulation Conference, pp. 1029–1033 (1998) Thiel, M., Schulz, R., Gmilkowsky, P.: Simulation-based production control in the semiconductor industry. In: Proceedings of the 1998 Winter Simulation Conference, pp. 1029–1033 (1998)
298.
Zurück zum Zitat T’kindt, V., Billaut, J.-C.: Multicriteria Scheduling: Theory, Models and Algorithms, 2nd edn. Springer, Berlin (2006) T’kindt, V., Billaut, J.-C.: Multicriteria Scheduling: Theory, Models and Algorithms, 2nd edn. Springer, Berlin (2006)
299.
Zurück zum Zitat Turban, E., Aronson, J.E., Liang, T.-P.: Decision Support Systems and Intelligent Systems, 7th edn. Prentice Hall, USA (2005) Turban, E., Aronson, J.E., Liang, T.-P.: Decision Support Systems and Intelligent Systems, 7th edn. Prentice Hall, USA (2005)
300.
Zurück zum Zitat Tyan, J.C., Du, T.C., Chen, J.C., Chang, I.-H.: Multiple response optimization in an fully automated FAB: an integrated tool and vehicle dispatching strategy. Comput. Ind. Eng. 46(1), 121–139 (2004) Tyan, J.C., Du, T.C., Chen, J.C., Chang, I.-H.: Multiple response optimization in an fully automated FAB: an integrated tool and vehicle dispatching strategy. Comput. Ind. Eng. 46(1), 121–139 (2004)
301.
Zurück zum Zitat Upasani, A.A., Uzsoy, R.: Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study. Int. J. Prod. Res. 46(21), 5883–5905 (2008) Upasani, A.A., Uzsoy, R.: Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study. Int. J. Prod. Res. 46(21), 5883–5905 (2008)
302.
Zurück zum Zitat Upasani, A.A., Uzsoy, R., Sourirajan, K.: A problem reduction approach for scheduling semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(2), 216–225 (2006) Upasani, A.A., Uzsoy, R., Sourirajan, K.: A problem reduction approach for scheduling semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(2), 216–225 (2006)
303.
Zurück zum Zitat Uzsoy, R.: Scheduling batch processing machines with incompatible job families. Int. J. Prod. Res. 33(10), 2685–2708 (1995) Uzsoy, R.: Scheduling batch processing machines with incompatible job families. Int. J. Prod. Res. 33(10), 2685–2708 (1995)
304.
Zurück zum Zitat Uzsoy, R., Wang, C.-S.: Performance of decomposition procedures for job shop scheduling problems with bottleneck machines. Int. J. Prod. Res. 38(6), 1271–1286 (2000) Uzsoy, R., Wang, C.-S.: Performance of decomposition procedures for job shop scheduling problems with bottleneck machines. Int. J. Prod. Res. 38(6), 1271–1286 (2000)
305.
Zurück zum Zitat Uzsoy, R., Martin-Vega, L.A., Lee, C.Y., Leonard, P.: Production scheduling algorithms for a semiconductor test facility. IEEE Trans. Semicond. Manuf. 4(4), 270–280 (1991) Uzsoy, R., Martin-Vega, L.A., Lee, C.Y., Leonard, P.: Production scheduling algorithms for a semiconductor test facility. IEEE Trans. Semicond. Manuf. 4(4), 270–280 (1991)
306.
Zurück zum Zitat Uzsoy, R., Lee, C.-Y., Martin-Vega, L.: A review of production planning and scheduling models in the semiconductor industry—Part I: system characteristics, performance evaluation and production planning. IIE Trans. Scheduling Logistics 24(4), 47–61 (1992) Uzsoy, R., Lee, C.-Y., Martin-Vega, L.: A review of production planning and scheduling models in the semiconductor industry—Part I: system characteristics, performance evaluation and production planning. IIE Trans. Scheduling Logistics 24(4), 47–61 (1992)
307.
Zurück zum Zitat Uzsoy, R., Lee, C.-Y., Martin-Vega, L.: A review of production planning and scheduling models in the semiconductor industry—Part II: shop floor control. IIE Trans. Scheduling Logistics 26(5), 44–55 (1994) Uzsoy, R., Lee, C.-Y., Martin-Vega, L.: A review of production planning and scheduling models in the semiconductor industry—Part II: shop floor control. IIE Trans. Scheduling Logistics 26(5), 44–55 (1994)
308.
Zurück zum Zitat van Beers, W.C.M., Kleijnen, J.P.C.: Kriging for interpolation in random simulation. J. Oper. Res. Soc. 54, 255–262 (2003) van Beers, W.C.M., Kleijnen, J.P.C.: Kriging for interpolation in random simulation. J. Oper. Res. Soc. 54, 255–262 (2003)
309.
Zurück zum Zitat van Beers, W.C.M., Kleijnen, J.P.C.: Kriging in simulation: a survey. In: Proceedings of the 2004 Winter Simulation Conference, pp. 113–121 (2004) van Beers, W.C.M., Kleijnen, J.P.C.: Kriging in simulation: a survey. In: Proceedings of the 2004 Winter Simulation Conference, pp. 113–121 (2004)
310.
Zurück zum Zitat Van Brussel, H., Wyns, J., Valckenaers, P., Bongaerts, L., Peeters, P.: Reference architecture for holonic manufacturing systems: PROSA. Comput. Ind. 37(3), 255–274 (1998) Van Brussel, H., Wyns, J., Valckenaers, P., Bongaerts, L., Peeters, P.: Reference architecture for holonic manufacturing systems: PROSA. Comput. Ind. 37(3), 255–274 (1998)
311.
Zurück zum Zitat Vepsalainen, A.P.J., Morton, T.E.: Priority rules for job shops with weighted tardiness costs. Manag. Sci. 33(8), 1035–1047 (1987) Vepsalainen, A.P.J., Morton, T.E.: Priority rules for job shops with weighted tardiness costs. Manag. Sci. 33(8), 1035–1047 (1987)
312.
Zurück zum Zitat Vepsalainen, A.P.J., Morton, T.E.: Improving local priority rules with global lead-time estimates: a simulation study. J. Manuf. Oper. Manag. 1, 102–118 (1988) Vepsalainen, A.P.J., Morton, T.E.: Improving local priority rules with global lead-time estimates: a simulation study. J. Manuf. Oper. Manag. 1, 102–118 (1988)
313.
Zurück zum Zitat Vieira, G.E.: A practical view of the complexity in developing master production schedules: fundamentals, examples, and implementation. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 149–176. Springer, New York (2006) Vieira, G.E.: A practical view of the complexity in developing master production schedules: fundamentals, examples, and implementation. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 149–176. Springer, New York (2006)
314.
Zurück zum Zitat Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Scheduling 6(1), 39–62 (2003) Vieira, G.E., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Scheduling 6(1), 39–62 (2003)
316.
Zurück zum Zitat Wang, F.K., Lin, J.T.: Performance evaluation of an automated material handling system for a wafer fab. Robot. Comput. Integrated Manuf. 20(2), 91–100 (2004) Wang, F.K., Lin, J.T.: Performance evaluation of an automated material handling system for a wafer fab. Robot. Comput. Integrated Manuf. 20(2), 91–100 (2004)
317.
Zurück zum Zitat Weigert, G., Klemmt, A., Horn, S.: Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor backend facility. Int. J. Prod. Res. 47(8), 2165–2183 (2009) Weigert, G., Klemmt, A., Horn, S.: Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor backend facility. Int. J. Prod. Res. 47(8), 2165–2183 (2009)
318.
Zurück zum Zitat Wein, L.M.: Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 1(3), 115–130 (1988) Wein, L.M.: Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 1(3), 115–130 (1988)
319.
Zurück zum Zitat Weiss, G.: Multiagent Systems: A Modern Approach to Distributed Artificial Intelligence. MIT Press, Cambridge, Massachusetts (1999) Weiss, G.: Multiagent Systems: A Modern Approach to Distributed Artificial Intelligence. MIT Press, Cambridge, Massachusetts (1999)
320.
Zurück zum Zitat Weng, W.W., Leachman, R.C.: An improved methodology for real-time production decisions at batch-process work stations. IEEE Trans. Semicond. Manuf. 6(3), 219–225 (1993) Weng, W.W., Leachman, R.C.: An improved methodology for real-time production decisions at batch-process work stations. IEEE Trans. Semicond. Manuf. 6(3), 219–225 (1993)
321.
Zurück zum Zitat Werner, S., Horn, S., Weigert, G., Jähnig, T.: Simulation based scheduling system in a semiconductor backend facility. In: Proceedings of the 2006 Winter Simulation Conference, pp. 1741–1748 (2006) Werner, S., Horn, S., Weigert, G., Jähnig, T.: Simulation based scheduling system in a semiconductor backend facility. In: Proceedings of the 2006 Winter Simulation Conference, pp. 1741–1748 (2006)
322.
Zurück zum Zitat Wight, O.W.: Input/output control: a real handle on lead time. J. Prod. Inventory Manag. 11(3), 9–31 (1970) Wight, O.W.: Input/output control: a real handle on lead time. J. Prod. Inventory Manag. 11(3), 9–31 (1970)
323.
Zurück zum Zitat Witte, J.D.: Using static capacity modeling techniques in semiconductor manufacturing. In: Proceedings of the 1996 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 31–35 (1996) Witte, J.D.: Using static capacity modeling techniques in semiconductor manufacturing. In: Proceedings of the 1996 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 31–35 (1996)
324.
Zurück zum Zitat Wooldridge, M.: An Introduction to Multiagent Systems, 2nd edn. Wiley, Chichester (2009) Wooldridge, M.: An Introduction to Multiagent Systems, 2nd edn. Wiley, Chichester (2009)
325.
Zurück zum Zitat Yang, F., Ankenman, B.E., Nelson, B.L.: Efficient generation of cycle time-throughput curves through simulation and metamodeling. Nav. Res. Logist. 54(1), 78–93 (2007) Yang, F., Ankenman, B.E., Nelson, B.L.: Efficient generation of cycle time-throughput curves through simulation and metamodeling. Nav. Res. Logist. 54(1), 78–93 (2007)
326.
Zurück zum Zitat Yang, F., Liu, J., Nelson, B.L., Ankenman, B.E., Tongarlak, M.: Metamodelling for cycle time-throughput-product mix surfaces using progressive model fitting. Prod. Plann. Contr. 22(1), 50–68 (2011) Yang, F., Liu, J., Nelson, B.L., Ankenman, B.E., Tongarlak, M.: Metamodelling for cycle time-throughput-product mix surfaces using progressive model fitting. Prod. Plann. Contr. 22(1), 50–68 (2011)
327.
Zurück zum Zitat Yeung, T.G., Mason, S.J.: Using real options analysis to value reoptimization options in the shifting bottleneck heuristic. Nav. Res. Logist. 53(4), 285–297 (2006) Yeung, T.G., Mason, S.J.: Using real options analysis to value reoptimization options in the shifting bottleneck heuristic. Nav. Res. Logist. 53(4), 285–297 (2006)
328.
Zurück zum Zitat Yoon, H.J., Shen, W.: A multi-agent based decision making system for semiconductor wafer fabrication with hard temporal constraints. IEEE Trans. Semicond. Manuf. 21(1), 83–91 (2008) Yoon, H.J., Shen, W.: A multi-agent based decision making system for semiconductor wafer fabrication with hard temporal constraints. IEEE Trans. Semicond. Manuf. 21(1), 83–91 (2008)
329.
Zurück zum Zitat Yugma, C., Dauzère-Pérès, S., Derreumaux, A., Sibille, O.: A batch optimization software for diffusion area scheduling in semiconductor manufacturing. In: Proceedings of the 2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 327–332 (2008) Yugma, C., Dauzère-Pérès, S., Derreumaux, A., Sibille, O.: A batch optimization software for diffusion area scheduling in semiconductor manufacturing. In: Proceedings of the 2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 327–332 (2008)
330.
Zurück zum Zitat Yurtsever, T., Kutanoglu, E., Johns, J.: Heuristic based scheduling system for diffusion in semiconductor manufacturing. In: Proceedings of the 2009 Winter Simulation Conference, pp. 1677–1685 (2009) Yurtsever, T., Kutanoglu, E., Johns, J.: Heuristic based scheduling system for diffusion in semiconductor manufacturing. In: Proceedings of the 2009 Winter Simulation Conference, pp. 1677–1685 (2009)
331.
Zurück zum Zitat Zambonelli, F., Jennings, N.R., Wooldridge, M.: Developing multiagent systems: the Gaia methodology. ACM Trans. Software Eng. Methodol. 12(3), 317–370 (2003) Zambonelli, F., Jennings, N.R., Wooldridge, M.: Developing multiagent systems: the Gaia methodology. ACM Trans. Software Eng. Methodol. 12(3), 317–370 (2003)
332.
Zurück zum Zitat Zimmermann, J., Mnch, L., Otto, P.: On the parameterization of dispatching rules in manufacturing. In: Proceedings of the 49th International Scientific Colloquium, Technical University of Ilmenau, pp. 74–79 (2004) Zimmermann, J., Mnch, L., Otto, P.: On the parameterization of dispatching rules in manufacturing. In: Proceedings of the 49th International Scientific Colloquium, Technical University of Ilmenau, pp. 74–79 (2004)
Metadaten
Titel
Introduction
verfasst von
Lars Mönch
John W. Fowler
Scott J. Mason
Copyright-Jahr
2013
Verlag
Springer New York
DOI
https://doi.org/10.1007/978-1-4614-4472-5_1