Abstract

Purpose

This paper presents a life cycle inventory (LCI) describing the material and energy demands for constructing and operating a geothermal combined heat and power (GCHP) plant as well as direct emissions of gases, waste water, and waste heat. The data are based on a newly constructed GCHP plant in Iceland, representing the design of both single flash (SF) and double flash (DF) power plants that currently produce the majority of electricity from geothermal plants worldwide.

Methods

Primary data were collected for the construction, operation, and maintenance of a GCHP plant. As the design and operation of geothermal flash power plants is site-specific due to the different nature of geothermal resources, a method of scaling data to a site specific parameter is proposed to make the LCI available as representative secondary data for such plants. These parameters along with other data identified as site-specific serve as the minimum data to be collected for adjusting the presented data to represent other flash power plants with or without combined heat production.

Results

The construction stage dominates the material burdens for the electricity and heat production. For the life cycle of electricity, it includes 80 % of diesel fuel use (whereof 96 % originates from well drilling), while 99 % of groundwater is used during the operational stage. The use and composition of geothermal fluid is site-specific but accounts for all direct emissions from the electricity production. The main materials in terms of mass used for the construction of the GCHP plant are water, diesel, steel, cement, asphalt, bentonite, and silica flour. Mineral wool and aluminum were also among the main material contributors. Material and energy burdens per functional unit are generally higher for a SF plant compared with DF plants. For heat production, 1.7 MJ of waste heat from power generation is used to produce 1 MJ of usable heat.

Conclusions

By presenting LCI data scaled with site-specific parameters, the flexibility of its use is increased as secondary data. However, the collection of primary data for the composition of geothermal fluid and values for site specific parameters is always required to represent local conditions. Thus, the LCI for Hellisheiði GCHP can be regarded as representative data for electricity and heat from geothermal flash power plants.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Fußnoten
1
The plant started its operation in 2006.
 
2
Bjarnarflag power plant (1969–present), Krafla power plant (1977–present), and Svartsengi power plant (1978–present).
 
3
The first whole year of operation of the fully developed power plant was 2012, whereas the heat production was better optimized in 2013 than 2012.
 
4
Materials omitted were drilling foam, fluid loss additives, and cement retarder.
 
5
Allocation of cold water pump materials is based on the amount of HP (6 units) and LP (1 unit) units assuming the cold water requirements are equally divided between each of the seven turbine-generator sets.
 
6
The density of 90 °C hot water is 0.9653 kg/l
 
7
Estimated by expert survey.
 
8
Material excluded are perlite, cement retarder, fluid loss additives, and drilling foam.
 
9
Energy flows including the combined heat production are used from Table 11 for the aggregated values in Table 13.
 
Literatur
Zurück zum Zitat Bayer P, Rybach L, Blum P, Brauchler R (2013) Review on life cycle environmental effects of geothermal power generation. Renew Sustain Energ Rev 26:446–463CrossRef Bayer P, Rybach L, Blum P, Brauchler R (2013) Review on life cycle environmental effects of geothermal power generation. Renew Sustain Energ Rev 26:446–463CrossRef
Zurück zum Zitat Bertani R (2012) Geothermal power generation in the world 2005–2010 update report. Geothermics 41:1–29CrossRef Bertani R (2012) Geothermal power generation in the world 2005–2010 update report. Geothermics 41:1–29CrossRef
Zurück zum Zitat Cement Concrete & Aggregates Australia (2004) Assessing concrete volumes. Cement Concrete & Aggregates Australia (2004) Assessing concrete volumes.
Zurück zum Zitat Curran MA, Mann M, Norris G (2005) The international workshop on electricity data for life cycle inventories. J Clean Prod 13(8):853–862CrossRef Curran MA, Mann M, Norris G (2005) The international workshop on electricity data for life cycle inventories. J Clean Prod 13(8):853–862CrossRef
Zurück zum Zitat DiPippo R (2008) Geothermal power plants. Principles, applications, case studies and environmental impact. Elsevier DiPippo R (2008) Geothermal power plants. Principles, applications, case studies and environmental impact. Elsevier
Zurück zum Zitat Drysdale D (2010) Carbon footprint for the Tauhara stage II geothermal development project. The New Zealand forest research institute (SCION), Rotorua Drysdale D (2010) Carbon footprint for the Tauhara stage II geothermal development project. The New Zealand forest research institute (SCION), Rotorua
Zurück zum Zitat Frick S, Kaltschmitt M, Schroder G (2010) Life cycle assessment of geothermal binary power plants using enhanced low-temperature reservoirs. Energy 35(5):2281–2294CrossRef Frick S, Kaltschmitt M, Schroder G (2010) Life cycle assessment of geothermal binary power plants using enhanced low-temperature reservoirs. Energy 35(5):2281–2294CrossRef
Zurück zum Zitat Gerber L, Gassner M, Maréchal F (2011) Systematic integration of LCA in process systems design: application to combined fuel and electricity production from lignocellulosic biomass. Comput Chem Eng 35(7):1265–1280CrossRef Gerber L, Gassner M, Maréchal F (2011) Systematic integration of LCA in process systems design: application to combined fuel and electricity production from lignocellulosic biomass. Comput Chem Eng 35(7):1265–1280CrossRef
Zurück zum Zitat Gunnlaugsson E (2012) Hellisheiði—Vinnuskýrsla 2011. Orkuveita Reykjavíkur, Reykjavík Gunnlaugsson E (2012) Hellisheiði—Vinnuskýrsla 2011. Orkuveita Reykjavíkur, Reykjavík
Zurück zum Zitat ISO (2006a) ISO 14040: Environmental management—life cycle assessment—principles and framework. International Organization for Standardization, Geneva ISO (2006a) ISO 14040: Environmental management—life cycle assessment—principles and framework. International Organization for Standardization, Geneva
Zurück zum Zitat ISO (2006b) ISO 14044: Environmental management—life cycle assessment—requirements and guidelines. International Organization for Standardization, Geneva ISO (2006b) ISO 14044: Environmental management—life cycle assessment—requirements and guidelines. International Organization for Standardization, Geneva
Zurück zum Zitat Lazzaretto A, Tsatsaronis G (2006) SPECO: a systematic and general methodology for calculating efficiencies and costs in thermal systems. Energy 31(8–9):1257–1289CrossRef Lazzaretto A, Tsatsaronis G (2006) SPECO: a systematic and general methodology for calculating efficiencies and costs in thermal systems. Energy 31(8–9):1257–1289CrossRef
Zurück zum Zitat Lo Rizzo S (2003) Environmental product Declaration. Power transformers 40/50 MVA (ONAN/ONAF). ABB, Milano Lo Rizzo S (2003) Environmental product Declaration. Power transformers 40/50 MVA (ONAN/ONAF). ABB, Milano
Zurück zum Zitat Lund JW, Freeston DH, Boyd TL (2011) Direct utilization of geothermal energy 2010 worldwide review. Geothermics 40(3):159–180CrossRef Lund JW, Freeston DH, Boyd TL (2011) Direct utilization of geothermal energy 2010 worldwide review. Geothermics 40(3):159–180CrossRef
Zurück zum Zitat Sullivan JL, Clark CE, Han JW, Wang MQ (2010) Life-cycle analysis results of geothermal systems in comparison to other power systems. Argonne National Laboratory Sullivan JL, Clark CE, Han JW, Wang MQ (2010) Life-cycle analysis results of geothermal systems in comparison to other power systems. Argonne National Laboratory
Zurück zum Zitat Sveinbjornsson BM, Thorhallsson S (2014) Drilling performance, injectivity and productivity of geothermal wells. Geothermics 50:76–84CrossRef Sveinbjornsson BM, Thorhallsson S (2014) Drilling performance, injectivity and productivity of geothermal wells. Geothermics 50:76–84CrossRef
Zurück zum Zitat Treyer K, Bauer C (2013) Life cycle inventories of electricity generation and power supply in version 3 of the ecoinvent database—part I: electricity generation. Int J Life Cycle Assess 1-19. doi:10.1007/s11367-013-0665-2 Treyer K, Bauer C (2013) Life cycle inventories of electricity generation and power supply in version 3 of the ecoinvent database—part I: electricity generation. Int J Life Cycle Assess 1-19. doi:10.​1007/​s11367-013-0665-2
Zurück zum Zitat Tsatsaronis G, Cziesla F (2003) Thermoeconomics. In: Meyers RA (ed) Encyclopedia of physical science and technology, 3rd edn. Academic Press, New York, pp 659–680CrossRef Tsatsaronis G, Cziesla F (2003) Thermoeconomics. In: Meyers RA (ed) Encyclopedia of physical science and technology, 3rd edn. Academic Press, New York, pp 659–680CrossRef
Metadaten
Titel
Life cycle inventory of a flash geothermal combined heat and power plant located in Iceland
Publikationsdatum
01.04.2015
Erschienen in
The International Journal of Life Cycle Assessment / Ausgabe 4/2015
Print ISSN: 0948-3349
Elektronische ISSN: 1614-7502
DOI
https://doi.org/10.1007/s11367-014-0842-y

Weitere Artikel der Ausgabe 4/2015

The International Journal of Life Cycle Assessment 4/2015 Zur Ausgabe