Skip to main content

2018 | OriginalPaper | Buchkapitel

An Integer Programming Model of Reinvestment Strategy Based Project Portfolio Selection and Scheduling with Constrained Resource

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Selecting an appropriate series of projects among numerous candidates and assigning start and finish time for every selected project under the constraints of limited resource does matter in the project management. With the introduction of annual budget and time value of capital, the proposed problem becomes more complex. In this paper, an integer programming model is proposed and constructed to model the situation of selecting and scheduling suitable project portfolio at the same time with constrained resource, in which reinvestment strategy is also applied in the process. In reality, annual budget is time-dependent, so it is necessary to take time value of capital into account during the modeling process. The use of reinvestment strategy means that the profit earned by accomplished projects is put into the resource pool to finance more projects to be selected and executed in order to make the total profit of project portfolio maximal. During the modeling progress, others constraints are also considered, like project interrelationship, to represent closely practical situations.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Chen J, Askin RG (2009) Project selection, scheduling and resource allocation with time dependent returns. Eur J Oper Res 193(1):23–34CrossRefMATH Chen J, Askin RG (2009) Project selection, scheduling and resource allocation with time dependent returns. Eur J Oper Res 193(1):23–34CrossRefMATH
2.
Zurück zum Zitat Jafarzadeh M, Tareghian HR, Rahbarnia F et al (2015) Optimal selection of project portfolios using reinvestment strategy within a flexible time horizon. Eur J Oper Res 243(2):658–664MathSciNetCrossRefMATH Jafarzadeh M, Tareghian HR, Rahbarnia F et al (2015) Optimal selection of project portfolios using reinvestment strategy within a flexible time horizon. Eur J Oper Res 243(2):658–664MathSciNetCrossRefMATH
3.
Zurück zum Zitat Markowitz HM (1952) Portfolio selection. J. Finance 7(1):77–91 Markowitz HM (1952) Portfolio selection. J. Finance 7(1):77–91
4.
Zurück zum Zitat Mcfarlan FW (1981) Portfolio approach to information-systems. Harvard Bus Rev 59(5):142–150 Mcfarlan FW (1981) Portfolio approach to information-systems. Harvard Bus Rev 59(5):142–150
5.
Zurück zum Zitat Hu G, Wang L, Fetch S et al (2008) A multi-objective model for project portfolio selection to implement lean and Six Sigma concepts. Int J Prod Res 46(23):6611–6625CrossRef Hu G, Wang L, Fetch S et al (2008) A multi-objective model for project portfolio selection to implement lean and Six Sigma concepts. Int J Prod Res 46(23):6611–6625CrossRef
6.
Zurück zum Zitat Kolisch R (1996) Efficient priority rules for the resource-constrained project scheduling problem. J Oper Manag 14(3):179–192CrossRef Kolisch R (1996) Efficient priority rules for the resource-constrained project scheduling problem. J Oper Manag 14(3):179–192CrossRef
7.
Zurück zum Zitat Tseng LY, Chen SC (2006) A hybrid metaheuristic for the resource-constrained project scheduling problem. Eur J Oper Res 175(2):707–721CrossRefMATH Tseng LY, Chen SC (2006) A hybrid metaheuristic for the resource-constrained project scheduling problem. Eur J Oper Res 175(2):707–721CrossRefMATH
8.
Zurück zum Zitat Brucker P, Knust S, Schoo A et al (2000) A branch and bound algorithm for the resource-constrained project scheduling problem. Math Method Oper Res 52(3):413–439MathSciNetCrossRefMATH Brucker P, Knust S, Schoo A et al (2000) A branch and bound algorithm for the resource-constrained project scheduling problem. Math Method Oper Res 52(3):413–439MathSciNetCrossRefMATH
Metadaten
Titel
An Integer Programming Model of Reinvestment Strategy Based Project Portfolio Selection and Scheduling with Constrained Resource
verfasst von
Baolong Wang
Copyright-Jahr
2018
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-7989-4_56

    Premium Partner