Planning order releases for an assembly system with random operation times

  • Chapter
Stochastic Modeling of Manufacturing Systems

Abstract

A multi-stage assembly network is considered. A number of end items should be delivered at a certain time. Otherwise a delay cost is incurred. End items and components that are delivered before they are needed will cause holding costs. All operation times are independent stochastic variables. The objective is to choose starting times for different operations in order to minimize the total expected costs. We suggest an approximate decomposition technique that is based on repeated application of the solution of a simpler single-stage problem. The performance of our approximate technique is compared to exact results in a numerical study.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Buzacott JA, Shanthikumar JG (1994) Safety stock versus safety time in MRP controlled production systems. Management Science 40: 1678–1689

    Google Scholar 

  • Chen F (2001) Market segmentation, advanced demand information, and supply chain performance. Manufacturing & Service Operations Management 3: 53–67

    MATH  Google Scholar 

  • Chu C, Proth JM, Xie X (1993) Supply management in assembly systems. Naval Research Logistics 40: 933–950

    MathSciNet  Google Scholar 

  • Clark AJ, Scarf H (1960) Optimal policies for a multi-echelon inventory problem. Management Science 6: 475–490

    Google Scholar 

  • Gong L, de Kok T, Ding J (1994) Optimal leadtimes planning in a serial production system. Management Science 40: 629–632

    Google Scholar 

  • Hariharan R, Zipkin P (1995) Customer-order information, leadtimes, and inventories. Management Science 41: 1599–1607

    Google Scholar 

  • Hopp W, Spearman M (1993) Setting safety leadtimes for purchased components in assembly systems. IIE Transactions 25: 2–11

    Google Scholar 

  • Karaesmen F, Buzacott JA, Dallery Y(2002) Integrating advance order information in maketo-stock production systems. IIE Transactions 34: 649–662

    Article  Google Scholar 

  • Kumar A (1989) Component inventory costs in an assembly problem with uncertain supplier lead-times. IIE Transactions 21: 112–121

    Google Scholar 

  • Shore H (1995) Setting safety lead-times for purchased components in assembly systems: a general solution procedure. IIE Transactions 27: 634–637

    Google Scholar 

  • Song J-S, Yano CA, Lerssrisuriya P (2000) Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing & Service Operations Management 2: 287–296

    Google Scholar 

  • Song J-S, Zipkin P (2003) Supply chain operations: Assemble-to-order systems, Ch. 11. In: Graves SC, De Kok T (eds) Handbooks in operations research and management science, Vol 11. Supply chain management: design, coordination and operation. Elsevier, Amsterdam

    Google Scholar 

  • Yano C (1987a) Stochastic leadtimes in two-level assembly systems. IIE Transactions 19: 371–378

    Google Scholar 

  • Yano C (1987b) Setting planned leadtimes in serial production systems with tardiness costs. Management Science 33: 95–106

    Article  MATH  Google Scholar 

  • Yano C (1987c) Stochastic leadtimes in two-level distribution-type networks. Naval Research Logistics 34: 831–843

    MATH  MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2006 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Axsäter, S. (2006). Planning order releases for an assembly system with random operation times. In: Liberopoulos, G., Papadopoulos, C.T., Tan, B., Smith, J.M., Gershwin, S.B. (eds) Stochastic Modeling of Manufacturing Systems. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-29057-5_14

Download citation

Publish with us

Policies and ethics