Abstract

This chapter aims to study and discuss the effect (hypothesis) of constructing the GERD on the deposited sediment amount in the AHDL. To achieve the objective of this chapter; a machine learning approach represented in a regression tree (RTs) model was used and calibrated to simulate the changes in bed levels and water velocities in the study area within AHDL by using the field measured data and GIS analysis for the year 2008 (reference case). Furthermore, a model verification process has been done to ensure the applicability of the applied model using the available field data in the year 2012. The results of the bed levels and velocities during calibration and verification of the model show low values of RMSE % (for calibration 2.90 and 2.57 for bed levels and velocities, respectively, and for calibration 4.66 and 4.98% for bed levels and velocities, respectively) and high R2 (for calibration 0.9975 and 0.9978 for bed levels and velocities, respectively, and for verification 0.9921 and 0.9959 for bed levels and velocities, respectively), indicating that the model was efficiently calibrated and verified. It shows good agreement between the simulated and measured data (by comparisons of simulated longitudinal and cross sections with the measured ones). Thus, this model is considered trustful and reliable to the prediction of sediment and erosion (bed changes) in the study area within AHDL after GERD construction. Accordingly, four of the possible scenarios are performed through the well-calibrated and verified model by reducing the flow quantity and its associated annual sediment rate by 5–10 and 60–65%, respectively. These scenarios are considered as prediction cases after GERD construction. The impact of GERD construction is then studied by comparing some sections along and across the studied lake portion before and after GERD construction (applied scenarios). This impact appeared clearly as a reduction in the amount of the accumulated sediment (decrease in bed levels) accompanied by an increase in erosion amount. Based on the applied scenarios, results showed that the amount of sediment was reduced by 25–27%, 52–55%, 76–81%, and 90–97% in the year 2030, 2040, 2050, and 2060, respectively, compared to the predicted amount of sediment in the year 2020 without GERD operation/construction. As a positive impact of the GERD construction, the lifetime of the upstream AHD reservoir will be prolonged due to the decrease in the amount of the accumulated sediment. This study provides decision-makers with a preliminary knowledge about the impact of GERD operation/construction on AHDL sediment pattern and consequently on Egypt and Sudan. Moreover, the current study opens new windows for future research to investigate the impacts of the different aspects of GERD of AHDL.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
9.
Zurück zum Zitat Tesfa BC (2013) Benefit of Grand Ethiopian Renaissance Dam Project (GERDP) for Sudan and Egypt. EIPSA Communicating article: energy, water, environment & economic, vol 1. University of Huddersfield, Huddersfield, pp 1–12. http://eprints.hud.ac.uk/19305/ Tesfa BC (2013) Benefit of Grand Ethiopian Renaissance Dam Project (GERDP) for Sudan and Egypt. EIPSA Communicating article: energy, water, environment & economic, vol 1. University of Huddersfield, Huddersfield, pp 1–12. http://​eprints.​hud.​ac.​uk/​19305/​
11.
Zurück zum Zitat Ramadan SM, Negm AM, Smanny M, Helmy A (2013) Environmental impacts of Great Ethiopian Renaissance Dam on the Egyptian water resources management and security. In: The 23rd international conference on: environmental protection is a must 11–13 May, Alexandria, Egypt Ramadan SM, Negm AM, Smanny M, Helmy A (2013) Environmental impacts of Great Ethiopian Renaissance Dam on the Egyptian water resources management and security. In: The 23rd international conference on: environmental protection is a must 11–13 May, Alexandria, Egypt
12.
Zurück zum Zitat Abdelhaleem FS, Helal EY (2015) Impacts of Grand Ethiopian Renaissance Dam on different water usages in Upper Egypt. Br J Appl Sci Technol 8(5):461–483CrossRef Abdelhaleem FS, Helal EY (2015) Impacts of Grand Ethiopian Renaissance Dam on different water usages in Upper Egypt. Br J Appl Sci Technol 8(5):461–483CrossRef
14.
Zurück zum Zitat Ramadan SM, Negm AM, El-Smanny M, El-sayed AH (2015) Quantifying the impacts of impounding Grand Ethiopian Renaissance Dam Reservoir on Nasser Lake active storage. In: Proceedings of eighteenth international water technology conference (IWTC 18), Sharm ElSheikh, 12–14 March, Egypt Ramadan SM, Negm AM, El-Smanny M, El-sayed AH (2015) Quantifying the impacts of impounding Grand Ethiopian Renaissance Dam Reservoir on Nasser Lake active storage. In: Proceedings of eighteenth international water technology conference (IWTC 18), Sharm ElSheikh, 12–14 March, Egypt
16.
Zurück zum Zitat Mohamed HI (2017) Grand Ethiopian Renaissance Dam impact on long term operation of high Aswan Dam reservoir. Int J Water Resour Arid Environ 6(1):89–95. ISSN 2079-7079 Mohamed HI (2017) Grand Ethiopian Renaissance Dam impact on long term operation of high Aswan Dam reservoir. Int J Water Resour Arid Environ 6(1):89–95. ISSN 2079-7079
17.
Zurück zum Zitat NRI (2012) Nile Research Institute. Annual reports for studying sediment transport and water quality in Aswan High Dam reservoir (1973–2012). National Water Research Center, Cairo NRI (2012) Nile Research Institute. Annual reports for studying sediment transport and water quality in Aswan High Dam reservoir (1973–2012). National Water Research Center, Cairo
19.
Zurück zum Zitat Saad FSA (2015) Scour evaluation at the Nile River Bends on Rosetta branch. MS thesis, Civil Engineering Department, Faculty of Engineering, Shoubra, Benha University, Benha Saad FSA (2015) Scour evaluation at the Nile River Bends on Rosetta branch. MS thesis, Civil Engineering Department, Faculty of Engineering, Shoubra, Benha University, Benha
23.
Zurück zum Zitat Abrahart RJ, White SM (2001) Modelling sediment transfer in Malawi: comparing backpropagation neural network solutions against a multiple linear regression benchmark using small data sets. Phys Chem Earth Part B 26(1):19–24CrossRef Abrahart RJ, White SM (2001) Modelling sediment transfer in Malawi: comparing backpropagation neural network solutions against a multiple linear regression benchmark using small data sets. Phys Chem Earth Part B 26(1):19–24CrossRef
24.
Zurück zum Zitat Dogan M, Yüksel I, Kisi O (2007) Estimation of total sediment load concentration obtained by experimental study using artificial neural networks. Environ Fluid Mech 7:271–288CrossRef Dogan M, Yüksel I, Kisi O (2007) Estimation of total sediment load concentration obtained by experimental study using artificial neural networks. Environ Fluid Mech 7:271–288CrossRef
25.
Zurück zum Zitat Nagy HM, Watanabe K, Hirano M (2002) Prediction of sediment load concentration in rivers using artificial neural network model. J Hydraul Eng 128(6):588–595CrossRef Nagy HM, Watanabe K, Hirano M (2002) Prediction of sediment load concentration in rivers using artificial neural network model. J Hydraul Eng 128(6):588–595CrossRef
26.
Zurück zum Zitat Alp M, Cigizoglu HK (2007) Suspended sediment load simulation by two artificial neural network methods using hydro meteorological data. Environ Model Softw 22:2–13CrossRef Alp M, Cigizoglu HK (2007) Suspended sediment load simulation by two artificial neural network methods using hydro meteorological data. Environ Model Softw 22:2–13CrossRef
27.
Zurück zum Zitat Yitian L, Gu RR (2003) Modeling flow and sediment transport in a river system using an artificial neural network. Environ Manag 31(1):122–134CrossRef Yitian L, Gu RR (2003) Modeling flow and sediment transport in a river system using an artificial neural network. Environ Manag 31(1):122–134CrossRef
28.
Zurück zum Zitat Merritt WS, Letcher RA, Jakeman AJ (2003) A review of erosion and sediment transport models. Environ Model Softw 18:761–799CrossRef Merritt WS, Letcher RA, Jakeman AJ (2003) A review of erosion and sediment transport models. Environ Model Softw 18:761–799CrossRef
29.
Zurück zum Zitat Agarwal A, Singh RD, Mishra SK, Bhunya PK (2005) ANN based sediment yield models for Vamsadhara river basin (India). Water SA 31(1):95–100CrossRef Agarwal A, Singh RD, Mishra SK, Bhunya PK (2005) ANN based sediment yield models for Vamsadhara river basin (India). Water SA 31(1):95–100CrossRef
30.
Zurück zum Zitat Jain SK (2001) Development of integrated sediment rating curves using ANNs. J Hydraul Eng 127(1):30–37CrossRef Jain SK (2001) Development of integrated sediment rating curves using ANNs. J Hydraul Eng 127(1):30–37CrossRef
31.
Zurück zum Zitat Cigizoglu HK, Alp M (2006) Generalized regression neural network in modelling river sediment yield. Adv Eng Softw 37:63–68CrossRef Cigizoglu HK, Alp M (2006) Generalized regression neural network in modelling river sediment yield. Adv Eng Softw 37:63–68CrossRef
32.
Zurück zum Zitat Tayfur G (2002) Artificial neural networks for sheet sediment transport. Hydrol Sci J 47(6):879–892CrossRef Tayfur G (2002) Artificial neural networks for sheet sediment transport. Hydrol Sci J 47(6):879–892CrossRef
33.
Zurück zum Zitat Cigizoglu HK, Kisi O (2006) Methods to improve the neural network performance in suspended sediment estimation. J Hydrol 317:221–238CrossRef Cigizoglu HK, Kisi O (2006) Methods to improve the neural network performance in suspended sediment estimation. J Hydrol 317:221–238CrossRef
34.
Zurück zum Zitat Zounemat-Kermani M, Kisi O, Adamowski J, Ramezani-Charmahineh A (2016) Evaluation of data driven models for river suspended sediment concentration modeling. J Hydrol 535:457–472CrossRef Zounemat-Kermani M, Kisi O, Adamowski J, Ramezani-Charmahineh A (2016) Evaluation of data driven models for river suspended sediment concentration modeling. J Hydrol 535:457–472CrossRef
35.
Zurück zum Zitat Chen XY, Chau KW (2016) A hybrid double feedforward neural network for suspended sediment load estimation. Water Resour Manag 30:2179–2194CrossRef Chen XY, Chau KW (2016) A hybrid double feedforward neural network for suspended sediment load estimation. Water Resour Manag 30:2179–2194CrossRef
37.
Zurück zum Zitat Monfared A, Darabi AHP (2016) Simulation of suspended sediment load of Shapour River with using of Artificial Nerve Network patterns (ANN) and Phasic Nerve (ANFIS) schedule series (stochastic). Int J Appl Eng Res 11(5):3645–3650 Monfared A, Darabi AHP (2016) Simulation of suspended sediment load of Shapour River with using of Artificial Nerve Network patterns (ANN) and Phasic Nerve (ANFIS) schedule series (stochastic). Int J Appl Eng Res 11(5):3645–3650
41.
Zurück zum Zitat Dartnell P, Gardner JV (2004) Predicting seafloor facies from multibeam bathymetry and backscatter data. Photogramm Eng Remote Sens 70:1081–1091CrossRef Dartnell P, Gardner JV (2004) Predicting seafloor facies from multibeam bathymetry and backscatter data. Photogramm Eng Remote Sens 70:1081–1091CrossRef
44.
Zurück zum Zitat Etemad-Shahidi A, Mahjoobi J (2009) Comparison between M5′ model tree and neural networks for prediction of significant wave height in Lake superior. Ocean Eng 36(15–16):1175–1181CrossRef Etemad-Shahidi A, Mahjoobi J (2009) Comparison between M5′ model tree and neural networks for prediction of significant wave height in Lake superior. Ocean Eng 36(15–16):1175–1181CrossRef
45.
Zurück zum Zitat Bhattacharya B, Solomatine DP (2005) Neural networks and M5 model trees in modelling water level-discharge relationship. Neurocomputing 63:381–396CrossRef Bhattacharya B, Solomatine DP (2005) Neural networks and M5 model trees in modelling water level-discharge relationship. Neurocomputing 63:381–396CrossRef
46.
Zurück zum Zitat Solomatine DP, Dulal KN (2003) Model trees as an alternative to neural networks in rainfall – runoff modelling. Hydrol Sci J 48(3):399–411CrossRef Solomatine DP, Dulal KN (2003) Model trees as an alternative to neural networks in rainfall – runoff modelling. Hydrol Sci J 48(3):399–411CrossRef
48.
Zurück zum Zitat Moussa AMA (2013) Predicting the deposition in the Aswan High Dam Reservoir using a 2-D model. Ain Shams Eng J 4:143–153CrossRef Moussa AMA (2013) Predicting the deposition in the Aswan High Dam Reservoir using a 2-D model. Ain Shams Eng J 4:143–153CrossRef
49.
Zurück zum Zitat El-Sammany MS, El-Moustafa AM (2011) Adaptation of surface water modeling system for sediment transport investigations in Lake Nasser. J Nile Basin Water Sci Eng 4(1):71–85 El-Sammany MS, El-Moustafa AM (2011) Adaptation of surface water modeling system for sediment transport investigations in Lake Nasser. J Nile Basin Water Sci Eng 4(1):71–85
51.
Zurück zum Zitat Elsahabi M, Negm A, Ali K (2016) Investigating sediment and velocity distribution profiles for Nubia Lake using RS/GIS and field data. Procedia Eng 154:291–298CrossRef Elsahabi M, Negm A, Ali K (2016) Investigating sediment and velocity distribution profiles for Nubia Lake using RS/GIS and field data. Procedia Eng 154:291–298CrossRef
52.
Zurück zum Zitat El-Sersawy H (2005) Sediment deposition mapping in Aswan High Dam Reservoir using Geographic Information System (GIS). In: Ninth international water technology conference, IWTC9, Sharm El-Sheikh, Egypt El-Sersawy H (2005) Sediment deposition mapping in Aswan High Dam Reservoir using Geographic Information System (GIS). In: Ninth international water technology conference, IWTC9, Sharm El-Sheikh, Egypt
53.
Zurück zum Zitat El-Moattassem M, Abdel-Aziz TM, El-Sersawy H (2005) Modeling of sedimentation process in Aswan High Dam Reservoir. In: International conference of UNESCO Flanders Fit Friend/Nile Project, towards a better cooperation. At Sharm El-Shiek, Egypt. https://doi.org/10.13140/2.1.2402.5923 El-Moattassem M, Abdel-Aziz TM, El-Sersawy H (2005) Modeling of sedimentation process in Aswan High Dam Reservoir. In: International conference of UNESCO Flanders Fit Friend/Nile Project, towards a better cooperation. At Sharm El-Shiek, Egypt. https://​doi.​org/​10.​13140/​2.​1.​2402.​5923
54.
56.
Zurück zum Zitat Negm A, Elsahabi M, Abdel-Fattah S (2017) Estimating the sediment and water capacity in the Aswan High Dam Lake using remote sensing and GIS techniques. In: Negm AM (ed) The Nile River. The handbook of environmental chemistry. Springer, Cham. https://doi.org/10.1007/698_2016_109. (with an Erratum in The Nile River, The Hdb Env. Chem, DOI: 10.1007/698_2017_20, © Springer International Publishing AG 2017)CrossRef Negm A, Elsahabi M, Abdel-Fattah S (2017) Estimating the sediment and water capacity in the Aswan High Dam Lake using remote sensing and GIS techniques. In: Negm AM (ed) The Nile River. The handbook of environmental chemistry. Springer, Cham. https://​doi.​org/​10.​1007/​698_​2016_​109. (with an Erratum in The Nile River, The Hdb Env. Chem, DOI: 10.1007/698_2017_20, © Springer International Publishing AG 2017)CrossRef
57.
Zurück zum Zitat Elsaeed GH, Aziz MS, Ziada WM (2016) Sedimentation analysis and prediction for Aswan High Dam reservoir. J Sci Eng Res 3(4):302–312 Elsaeed GH, Aziz MS, Ziada WM (2016) Sedimentation analysis and prediction for Aswan High Dam reservoir. J Sci Eng Res 3(4):302–312
59.
Zurück zum Zitat El-Manadely MS, Abdel-Bary RM, El-Sammany MS, Ahmed TA (2002) Characteristics of the delta formation resulting from sediment deposition in Lake Nasser. Egypt: approach to tracing Lake delta formation. Lakes Reserv Res Manage 7:81–86CrossRef El-Manadely MS, Abdel-Bary RM, El-Sammany MS, Ahmed TA (2002) Characteristics of the delta formation resulting from sediment deposition in Lake Nasser. Egypt: approach to tracing Lake delta formation. Lakes Reserv Res Manage 7:81–86CrossRef
61.
Zurück zum Zitat Swanson A (2014) The Grand Ethiopian Renaissance Dam: sustainable development or not? Virginia Tech, Center for Leadership in Global Sustainability (CLiGS), Arlington. www.cligs.vt.edu Swanson A (2014) The Grand Ethiopian Renaissance Dam: sustainable development or not? Virginia Tech, Center for Leadership in Global Sustainability (CLiGS), Arlington. www.​cligs.​vt.​edu
62.
Zurück zum Zitat MWRI (2012) The Ministry of Water Resources and Irrigation, Egypt, Nile water sector. Annual report (2011–2012) MWRI (2012) The Ministry of Water Resources and Irrigation, Egypt, Nile water sector. Annual report (2011–2012)
63.
Zurück zum Zitat Attalla RA (2015) Grand Ethiopian Renaissance Dam (GERD). An interactive qualifying project report. Worcester Polytechnic Institute. IQP-GFS-1504, pp 1–74 Attalla RA (2015) Grand Ethiopian Renaissance Dam (GERD). An interactive qualifying project report. Worcester Polytechnic Institute. IQP-GFS-1504, pp 1–74
66.
Zurück zum Zitat MALR (2012) The ministry of agriculture and land reclamation, Egypt, the general authority for AHDL development, AHDL levels (1978 to 2012) MALR (2012) The ministry of agriculture and land reclamation, Egypt, the general authority for AHDL development, AHDL levels (1978 to 2012)
67.
Zurück zum Zitat Quinlan JR (1986) Induction of decision trees. Mach Learn 1(1):81–106 Quinlan JR (1986) Induction of decision trees. Mach Learn 1(1):81–106
68.
Zurück zum Zitat ESRI (2008) Environmental Systems Research Institute, Help topics of ArcGIS version 9.3 Desktop. Developer Center of Geographic Information Systems (GIS) software, Redlands ESRI (2008) Environmental Systems Research Institute, Help topics of ArcGIS version 9.3 Desktop. Developer Center of Geographic Information Systems (GIS) software, Redlands
69.
Zurück zum Zitat Negm AM, Abdulaziz T, Nassar M, Fathy I (2017) Estimating life time span of Aswan High Dam reservoir using numerical simulation of Lake Nubia. In: Negm AM (ed) The Nile River. The handbook of environmental chemistry, vol 56. Springer, Cham, pp 35–56. https://doi.org/10.1007/698_2017_2CrossRef Negm AM, Abdulaziz T, Nassar M, Fathy I (2017) Estimating life time span of Aswan High Dam reservoir using numerical simulation of Lake Nubia. In: Negm AM (ed) The Nile River. The handbook of environmental chemistry, vol 56. Springer, Cham, pp 35–56. https://​doi.​org/​10.​1007/​698_​2017_​2CrossRef
Metadaten
Titel
Impacts of GERD on the Accumulated Sediment in Lake Nubia Using Machine Learning and GIS Techniques
verfasst von
Abdelazim Negm
Mohamed Elsahabi
Mohamed Abdel-Nasser
Karar Mahmoud
Kamal Ali
Copyright-Jahr
2019
DOI
https://doi.org/10.1007/698_2018_294