Skip to main content

2011 | OriginalPaper | Buchkapitel

2. Production Planning and Scheduling: Interaction and Coordination

verfasst von : Yiwei Cai, Erhan Kutanoglu, John Hasenbein

Erschienen in: Planning Production and Inventories in the Extended Enterprise

Verlag: Springer New York

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In many organizations, production planning is part of a hierarchical planning, capacity/resource allocation, scheduling and control framework. The production plan considers resource capacities, time periods, supply and demand over a reasonably long planning horizon at a high level. Its decision then forms the input to the more detailed, shorter-term functions such as scheduling and control at the lower level, which usually have more accurate estimates of supply, demand, and capacity levels. Hence, interaction between production planning and production scheduling/control is inevitable, not only because the scheduling/control decisions are constrained by the planning decisions, but also because disruptions occurring in the execution/control stage (usually after schedule generation) may affect the optimality and/or feasibility of both the plan and the schedule. If the overall performance of the production system is to be improved, disruptions must be managed effectively, with careful consideration of both planning and scheduling decisions. This chapter focuses on the interaction between production planning and scheduling, emphasizing the coordination of decisions, with special emphasis on making robust decisions at both levels in the face of unexpected disruptions. We provide examples and realistic scenarios from semiconductor manufacturing.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Asmundsson J, Rardin R, Uzsoy R (2006) Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans Semicond Manuf 19:95–111CrossRef Asmundsson J, Rardin R, Uzsoy R (2006) Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans Semicond Manuf 19:95–111CrossRef
Zurück zum Zitat Bertsimas D, Gamarnik D, Sethuraman J (2003) From fluid relaxation to practical algorithms for job shop scheduling: the holding cost objective. Oper Res 51(5):798–813CrossRef Bertsimas D, Gamarnik D, Sethuraman J (2003) From fluid relaxation to practical algorithms for job shop scheduling: the holding cost objective. Oper Res 51(5):798–813CrossRef
Zurück zum Zitat Dai J, Weiss G (2002) A fluid heuristic for minimizing makespan in job shops. Oper Res 50(4):692–707CrossRef Dai J, Weiss G (2002) A fluid heuristic for minimizing makespan in job shops. Oper Res 50(4):692–707CrossRef
Zurück zum Zitat Graves S (1986) A tactical planning model for a job shop. Oper Res 34:552–533CrossRef Graves S (1986) A tactical planning model for a job shop. Oper Res 34:552–533CrossRef
Zurück zum Zitat Hackman S, Leachman R (1989) A general framework for modeling production. Manag Sci 35:478–495CrossRef Hackman S, Leachman R (1989) A general framework for modeling production. Manag Sci 35:478–495CrossRef
Zurück zum Zitat Horiguchi K, Raghavan N, Uzsoy R, Venkateswaran S (2001) Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility. Int J Prod Res 39:825–842CrossRef Horiguchi K, Raghavan N, Uzsoy R, Venkateswaran S (2001) Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility. Int J Prod Res 39:825–842CrossRef
Zurück zum Zitat Hung YF and Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257–269CrossRef Hung YF and Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257–269CrossRef
Zurück zum Zitat Jaikumar R (1974) An operational optimization procedure for production scheduling. Comput Oper Res 1:191–200CrossRef Jaikumar R (1974) An operational optimization procedure for production scheduling. Comput Oper Res 1:191–200CrossRef
Zurück zum Zitat Kim S, Yea S, Kim B (2003) Shift scheduling for steppers in the semiconductor wafer fabrication process. IIE Trans 34:167–177 Kim S, Yea S, Kim B (2003) Shift scheduling for steppers in the semiconductor wafer fabrication process. IIE Trans 34:167–177
Zurück zum Zitat Kleindorfer PR, Kriebel CH, Thompson GL, Kleindorfer GB (1975) Discrete optimal control of production plains. Manag Sci 22 Kleindorfer PR, Kriebel CH, Thompson GL, Kleindorfer GB (1975) Discrete optimal control of production plains. Manag Sci 22
Zurück zum Zitat Leachman R, Kang J, Lin V (2002) SLIM: Short cycle time and low inventory in manufacturing at samsung electronics. Interfaces 32(1):61–77CrossRef Leachman R, Kang J, Lin V (2002) SLIM: Short cycle time and low inventory in manufacturing at samsung electronics. Interfaces 32(1):61–77CrossRef
Zurück zum Zitat Lee Y, Kim T (2002) Manufacturing cycle time reduction using balance control in the semiconductor fabrication line. Prod Plann Contr 13:529–540CrossRef Lee Y, Kim T (2002) Manufacturing cycle time reduction using balance control in the semiconductor fabrication line. Prod Plann Contr 13:529–540CrossRef
Zurück zum Zitat Missbauer H (2002) Aggregate order release planning for time-varying demand. Int J Prod Res 40(3):699–718CrossRef Missbauer H (2002) Aggregate order release planning for time-varying demand. Int J Prod Res 40(3):699–718CrossRef
Zurück zum Zitat Pahl J, Voβ S, Woodruff D (2005) Production planning with load dependent lead times. Q J Oper Res 3:257–302CrossRef Pahl J, Voβ S, Woodruff D (2005) Production planning with load dependent lead times. Q J Oper Res 3:257–302CrossRef
Zurück zum Zitat Qin SJ and Badgwell TA (2003) A survey of industrial model predictive control technology. Contr Eng Practice 11:733–764CrossRef Qin SJ and Badgwell TA (2003) A survey of industrial model predictive control technology. Contr Eng Practice 11:733–764CrossRef
Zurück zum Zitat Rose O (2002) Some issues of the critical ratio dispatch rule in semiconductor manufacturing. Proceedings of the 2002 Winter Simulation Conference, December 2002 Rose O (2002) Some issues of the critical ratio dispatch rule in semiconductor manufacturing. Proceedings of the 2002 Winter Simulation Conference, December 2002
Zurück zum Zitat Tsakalis K, Godoy JF, Rodriguez A (2003) Hierarchical modeling and control for re-entrant semiconductor fabrication lines: A mini-fab benchmark. pp. 578–587 Tsakalis K, Godoy JF, Rodriguez A (2003) Hierarchical modeling and control for re-entrant semiconductor fabrication lines: A mini-fab benchmark. pp. 578–587
Zurück zum Zitat Vargas-Villami F, Rivera D (2000) Multilayer optimization and scheduling using model predictive control: application to reentrant semiconductor manufacturing lines. Comput Chem Eng 24:2009–2021CrossRef Vargas-Villami F, Rivera D (2000) Multilayer optimization and scheduling using model predictive control: application to reentrant semiconductor manufacturing lines. Comput Chem Eng 24:2009–2021CrossRef
Zurück zum Zitat Vargas-Villami F, Rivera D, Kempf K (2003) A hierarchical approach to production control of reentrant semiconductor manufacturing lines. IEEE Trans Contr Syst Technol 11(4):578–587CrossRef Vargas-Villami F, Rivera D, Kempf K (2003) A hierarchical approach to production control of reentrant semiconductor manufacturing lines. IEEE Trans Contr Syst Technol 11(4):578–587CrossRef
Metadaten
Titel
Production Planning and Scheduling: Interaction and Coordination
verfasst von
Yiwei Cai
Erhan Kutanoglu
John Hasenbein
Copyright-Jahr
2011
Verlag
Springer New York
DOI
https://doi.org/10.1007/978-1-4419-8191-2_2