Skip to main content
Log in

Approximation algorithms for scheduling unrelated parallel machines

  • Published:
Mathematical Programming Submit manuscript

Abstract

We consider the following scheduling problem. There arem parallel machines andn independent jobs. Each job is to be assigned to one of the machines. The processing of jobj on machinei requires timep ij . The objective is to find a schedule that minimizes the makespan.

Our main result is a polynomial algorithm which constructs a schedule that is guaranteed to be no longer than twice the optimum. We also present a polynomial approximation scheme for the case that the number of machines is fixed. Both approximation results are corollaries of a theorem about the relationship of a class of integer programming problems and their linear programming relaxations. In particular, we give a polynomial method to round the fractional extreme points of the linear program to integral points that nearly satisfy the constraints.

In contrast to our main result, we prove that no polynomial algorithm can achieve a worst-case ratio less than 3/2 unlessP = NP. We finally obtain a complexity classification for all special cases with a fixed number of processing times.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • R. Aharoni, P. Erdös and N. Linial, “Dual integer linear programs and the relationship between their optima,”Proceedings of the 17th Annual ACM Symposium on Theory of Computing (1985) 476–483.

  • J.J. Bartholdi III, “A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering,”Operations Research 29 (1981) 501–510.

    Google Scholar 

  • J.J. Bartholdi III, J.B. Orlin and H.D. Ratliff, “Cyclic scheduling via integer programs with circular ones,”Operations Research 28 (1980) 1074–1085.

    Google Scholar 

  • S. Baum and L.E. Trotter Jr., “Integer rounding for polymatroid and branching optimization problems,”SIAM Journal on Algebraic and Discrete Methods 2 (1981) 416–425.

    Google Scholar 

  • V. Chvátal, “A greedy heuristic for the set-covering problem,”Mathematics of Operations Research 4 (1979) 233–235.

    Google Scholar 

  • G.B. Dantzig,Linear Programming and Extensions (Princeton University Press, Princeton, NJ, 1963).

    Google Scholar 

  • E. Davis and J.M. Jaffe, “Algorithms for scheduling tasks on unrelated processors,”Journal of the Association for Computing Machinery 28 (1981) 721–736.

    Google Scholar 

  • M.R. Garey and D.S. Johnson, “Complexity results for multiprocessor scheduling under resource constraints,”SIAM Journal on Computing 4 (1975) 397–411.

    Google Scholar 

  • M.R. Garey and D.S. Johnson, “Strong NP-completeness results: motivation, examples and implications,”Journal of the Association for Computing Machinery 25 (1978) 499–508.

    Google Scholar 

  • M.R. Garey and D.S. Johnson,Computers and Intractability: a Guide to the Theory of NP-Completeness (Freeman, San Francisco, CA, 1979).

    Google Scholar 

  • T. Gonzalez, O.H. Ibarra and S. Sahni, “Bounds for LPT schedules on uniform processors,”SIAM Journal on Computing 6 (1977) 155–166.

    Google Scholar 

  • R.L. Graham, “Bounds for certain multiprocessing anomalies,”Bell System Technological Journal 45 (1966) 1563–1581.

    Google Scholar 

  • R.L. Graham, “Bounds on multiprocessing timing anomalies,”SIAM Journal on Applied Mathematics 17 (1969) 416–429.

    Google Scholar 

  • R.L. Graham, E.L. Lawler, J.K. Lenstra and A.H.G. Rinnooy Kan, “Optimization and approximation in deterministic sequencing and scheduling: a survey,”Annals of Discrete Mathematics 5 (1979) 287–326.

    Google Scholar 

  • M. Grötschel, L. Lovász and A. Schrijver,Geometric Algorithms and Combinatorial Optimization (Springer, Berlin, 1988).

    Google Scholar 

  • D.S. Hochbaum and D.B. Shmoys, “Using dual approximation algorithms for scheduling problems: practical and theoretical results,”Journal of the Association for Computing Machinery 34 (1987) 144–162.

    Google Scholar 

  • D.S. Hochbaum and D.B. Shmoys, “A polynomial approximation scheme for machine scheduling on uniform processors: using the dual approximation approach,”SIAM Journal on Computing 17 (1988) 539–551.

    Google Scholar 

  • E. Horowitz and S. Sahni, “Exact and approximate algorithms for scheduling nonidentical processors,”Journal of the Association for Computing Machinery 23 (1976) 317–327.

    Google Scholar 

  • L.G. Khachian, “A polynomial time algorithm in linear programming, “Soviet Mathematics Doklady 20 (1979) 191–194.

    Google Scholar 

  • L. Lovász, “On the ratio of optimal and fractional covers,”Discrete Applied Mathematics 13 (1983) 383–390.

    Google Scholar 

  • O.M.-C. Marcotte,Topics in Combinatorial Packing and Covering, Ph.D. Thesis, School of Operations Research and Industrial Engineering, Cornell University (Ithaca, NY, 1983).

    Google Scholar 

  • K. Numata, “Approximate and exact algorithms for scheduling independent tasks on unrelated processors,”Journal of the Operations Research Society of Japan 31 (1988) 61–81.

    Google Scholar 

  • C.N. Potts, “Analysis of a linear programming heuristic for scheduling unrelated parallel machines,”Discrete Applied Mathematics 10 (1985) 155–164.

    Google Scholar 

  • P. Raghavan, “Probabilistic construction of deterministic algorithms: approximating packing integer programs,”Proceedings of the 27th Annual IEEE Symposium on Foundations of Computer Science (1986) 10–18.

  • P. Raghavan and C.D. Thompson, “Provably good routing in graphs: regular arrays,”Proceedings of the 17th Annual ACM Symposium on Theory of Computing (1985) 79–87.

  • S. Sahni, “Algorithms for scheduling independent tasks,”Journal of the Association for Computing Machinery 23 (1976) 116–127.

    Google Scholar 

  • A. Schrijver, “Min-Max results in combinatorial optimization,” in: A. Bachem, M. Grötschel and B. Korte, eds.,Mathematical Programming: The State of the Art—Bonn 1982 (Springer, Berlin, 1983) pp. 439–500.

    Google Scholar 

  • A. Schrijver,Theory of Linear and Integer Programming (Wiley, Chichester, 1986).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

A preliminary version of this paper appeared in theProceedings of the 28th Annual IEEE Symposium on the Foundations of Computer Science (Computer Society Press of the IEEE, Washington, D.C., 1987) pp. 217–224.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lenstra, J.K., Shmoys, D.B. & Tardos, É. Approximation algorithms for scheduling unrelated parallel machines. Mathematical Programming 46, 259–271 (1990). https://doi.org/10.1007/BF01585745

Download citation

  • Received:

  • Revised:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01585745

Key words

Navigation