Skip to main content
Erschienen in: OR Spectrum 1/2006

01.01.2006 | Regular Article

Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution

verfasst von: Yongjian Li, Jian Chen, Xiaoqiang Cai

Erschienen in: OR Spectrum | Ausgabe 1/2006

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This paper investigates an uncapacitated multi-product production planning problem with returned product remanufacturing and demand substitution, where no backlog and no disposal are allowed. Both the production of new products and the remanufacturing of returned products are considered to meet time-varying demands in a finite time horizon. Setup costs are taken into account when a new product is manufactured or a returned product is remanufactured. The problem is to determine when and how many returned products are remanufactured and new products are manufactured so as to minimize the total cost, including manufacturing, remanufacturing, holding and substitution costs. We first develop an optimization model to formulate the problem. We then propose a dynamic programming approach to derive the optimal solution in the case with large quantities of returned products. We further propose an approximate approach for the general problem to compute a near-optimal solution. The proposed approaches are evaluated by computational experiments and the effectiveness of the approximate approach is verified. Some managerial insights regarding the effects of remanufacturing/substitution are also obtained from the computational studies.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Aras N, Boyaci T, Verter V (2004) The effect of categorizing returned products in remanufacturing. IIE Trans 36:319–331CrossRef Aras N, Boyaci T, Verter V (2004) The effect of categorizing returned products in remanufacturing. IIE Trans 36:319–331CrossRef
Zurück zum Zitat Balakrishnan A, Geunes J (2000) Requirements planning with substitutions: exploiting bill-of-materials flexibility in production planning. Manuf Serv Oper Manag 2:166–185CrossRef Balakrishnan A, Geunes J (2000) Requirements planning with substitutions: exploiting bill-of-materials flexibility in production planning. Manuf Serv Oper Manag 2:166–185CrossRef
Zurück zum Zitat Bayindir ZP, Erkip N, Güllü R (2005) Assessing the benefits of remanufacturing option under one-way substitution. J Oper Res Soc 56:286–296CrossRef Bayindir ZP, Erkip N, Güllü R (2005) Assessing the benefits of remanufacturing option under one-way substitution. J Oper Res Soc 56:286–296CrossRef
Zurück zum Zitat Beltrán JL, Krass D (2002) Dynamic lot sizing with returning items and disposals. IIE Trans 34:437–448CrossRef Beltrán JL, Krass D (2002) Dynamic lot sizing with returning items and disposals. IIE Trans 34:437–448CrossRef
Zurück zum Zitat Golany B, Yang J, Yu G (2001) Economic lot-sizing with remanufacturing options. IIE Trans 33:995–1003CrossRef Golany B, Yang J, Yu G (2001) Economic lot-sizing with remanufacturing options. IIE Trans 33:995–1003CrossRef
Zurück zum Zitat Guide VDR Jr, Van Wassenhove LN (2002) The reverse supply chain. Harvard Bus Rev 80(2):25–26 Guide VDR Jr, Van Wassenhove LN (2002) The reverse supply chain. Harvard Bus Rev 80(2):25–26
Zurück zum Zitat Hsu VN, Li C-L, Xiao W-Q (2005) Dynamic lot size problems with one-way product substitution. IIE Trans 37:201–215CrossRef Hsu VN, Li C-L, Xiao W-Q (2005) Dynamic lot size problems with one-way product substitution. IIE Trans 37:201–215CrossRef
Zurück zum Zitat Inderfurth K (2004) Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution. Int J Prod Econ 90:325–343CrossRef Inderfurth K (2004) Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution. Int J Prod Econ 90:325–343CrossRef
Zurück zum Zitat Kleber R, Minner S, Kiesmuller G (2002) A continuous time inventory model for a product recovery system with multiple options. Int J Prod Econ 79:121–141CrossRef Kleber R, Minner S, Kiesmuller G (2002) A continuous time inventory model for a product recovery system with multiple options. Int J Prod Econ 79:121–141CrossRef
Zurück zum Zitat Leachman R (1987) Preliminary design and development of a corporate-level production system for the semiconductor industry. Working Paper ORC 86-11, Operations Research Center, University of California, Berkeley, CA Leachman R (1987) Preliminary design and development of a corporate-level production system for the semiconductor industry. Working Paper ORC 86-11, Operations Research Center, University of California, Berkeley, CA
Zurück zum Zitat Magnanti T, Wong R (1984) Network design and transportation planning: models and algorithms. Transp Sci 18:1–55CrossRef Magnanti T, Wong R (1984) Network design and transportation planning: models and algorithms. Transp Sci 18:1–55CrossRef
Zurück zum Zitat Minner S, Kleber R (2001) Optimal control of production and remanufacturing in a simple recovery model with linear cost functions. OR-Spektrum 23:3–24CrossRef Minner S, Kleber R (2001) Optimal control of production and remanufacturing in a simple recovery model with linear cost functions. OR-Spektrum 23:3–24CrossRef
Zurück zum Zitat Padmanabhan V, Png IPL (1995) Returns policies: making money by making good. Sloan Manage Rev 37(1):65–72 Padmanabhan V, Png IPL (1995) Returns policies: making money by making good. Sloan Manage Rev 37(1):65–72
Zurück zum Zitat Richter K, Sombrutzki M (2000) Remanufacturing planning for the reverse Wagner/Whitin models. Eur J Oper Res 121:304–315CrossRef Richter K, Sombrutzki M (2000) Remanufacturing planning for the reverse Wagner/Whitin models. Eur J Oper Res 121:304–315CrossRef
Zurück zum Zitat Richter K, Weber J (2001) The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost. Int J Prod Econ 71:447–456CrossRef Richter K, Weber J (2001) The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost. Int J Prod Econ 71:447–456CrossRef
Zurück zum Zitat Souza GC, Ketzenberg ME, Guide VDR Jr (2002) Capacitated remanufacturing with service level constraints. Prod Oper Manag 11(2):231–248 Souza GC, Ketzenberg ME, Guide VDR Jr (2002) Capacitated remanufacturing with service level constraints. Prod Oper Manag 11(2):231–248
Zurück zum Zitat Stephen AS, Agrawal N (2000) Management of multi-item retail inventory systems with demand substitution. Oper Res 48:50–64CrossRef Stephen AS, Agrawal N (2000) Management of multi-item retail inventory systems with demand substitution. Oper Res 48:50–64CrossRef
Zurück zum Zitat Stock J, Speh T, Shear H (2002) Many happy (product) returns. Harvard Bus Rev 80(7):16–17 Stock J, Speh T, Shear H (2002) Many happy (product) returns. Harvard Bus Rev 80(7):16–17
Zurück zum Zitat Yang J, Golany B, Yu G (2005) A concave-cost production planning problem with remanufacturing options. Nav Res Logist 52:443–458CrossRef Yang J, Golany B, Yu G (2005) A concave-cost production planning problem with remanufacturing options. Nav Res Logist 52:443–458CrossRef
Metadaten
Titel
Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution
verfasst von
Yongjian Li
Jian Chen
Xiaoqiang Cai
Publikationsdatum
01.01.2006
Verlag
Springer-Verlag
Erschienen in
OR Spectrum / Ausgabe 1/2006
Print ISSN: 0171-6468
Elektronische ISSN: 1436-6304
DOI
https://doi.org/10.1007/s00291-005-0012-5

Weitere Artikel der Ausgabe 1/2006

OR Spectrum 1/2006 Zur Ausgabe