Skip to main content
Erschienen in: Rock Mechanics and Rock Engineering 5/2015

01.09.2015 | Original Paper

A Real-Time Analysis and Feedback System for Quality Control of Dam Foundation Grouting Engineering

verfasst von: D. H. Zhong, F. G. Yan, M. C. Li, C. X. Huang, K. Fan, J. F. Tang

Erschienen in: Rock Mechanics and Rock Engineering | Ausgabe 5/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Real-time analysis and feedback systems play a vital role in obtaining good results from grouting processes. However, when there are intense construction schedules and complex geological structures, it is difficult for existing systems to provide to site engineers, prior to the borehole construction, prompt and accurate feedback, such as detailed geological information about grouting boreholes, which limits the use of such systems in practical applications. This paper proposes combining a three-dimensional (3D) geological model with real-time data collection technology in a system for both monitoring grouting, and providing analysis and feedback. This integrated grouting model, which comprises the geological model, the grouting borehole model and the grouting parameter database set, can be coupled and associated dynamically with grouting data. Additionally, the following methods are applied in this system: real-time grouting data processing and a monitoring alarm, prediction and visualization of geological conditions, forecasting of rock uplift, and visualization analysis of grouting parameters. The application of this system in Hydropower Project A, China is used as a case study. The predictions of geological conditions are closely matched with the actual situation, and this system can be used to monitor construction processes remotely and to help site engineers to design reasonable construction plans, optimize layouts for grouting boreholes and adjust construction measures.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Bao YG (2004) Research on intelligent grouting data recording system. Master’s thesis, Zhejiang University, Hang Zhou, China, 7 pp Bao YG (2004) Research on intelligent grouting data recording system. Master’s thesis, Zhejiang University, Hang Zhou, China, 7 pp
Zurück zum Zitat Brantberger M, Stille H, Eriksson M (2000) Controlling the grout spread in tunnel grouting-analyses and developments of the GIN-method. Tunn Undergr Space Technol 15(4):343–352CrossRef Brantberger M, Stille H, Eriksson M (2000) Controlling the grout spread in tunnel grouting-analyses and developments of the GIN-method. Tunn Undergr Space Technol 15(4):343–352CrossRef
Zurück zum Zitat Bruce DA (2012) Computer monitoring in the grouting industry. Geotechnical Engineering State of the Art and Practice 549–564 Bruce DA (2012) Computer monitoring in the grouting industry. Geotechnical Engineering State of the Art and Practice 549–564
Zurück zum Zitat Chen YF, Zhou CB, Hu R, Li DQ, Rong G (2010) Key issues on seepage flow analysis in large scale hydropower projects. Chin J Geotech Eng 32(9):1448–1454 Chen YF, Zhou CB, Hu R, Li DQ, Rong G (2010) Key issues on seepage flow analysis in large scale hydropower projects. Chin J Geotech Eng 32(9):1448–1454
Zurück zum Zitat Dreese TL, Wilson DB, Heenan DM, Cockburn J (2003) State of the Art in Computer Monitoring and Analysis of Grouting. Grouting Treat ASCE Geotech Spec Publ 120:1440–1453 Dreese TL, Wilson DB, Heenan DM, Cockburn J (2003) State of the Art in Computer Monitoring and Analysis of Grouting. Grouting Treat ASCE Geotech Spec Publ 120:1440–1453
Zurück zum Zitat Eklund D, Stille H (2008) Penetrability due to filtration tendency of cement-based grout. Tunn Undergr Sp Tech 23:389–398CrossRef Eklund D, Stille H (2008) Penetrability due to filtration tendency of cement-based grout. Tunn Undergr Sp Tech 23:389–398CrossRef
Zurück zum Zitat Ewert F-K (1985) Rock grouting with emphasis on dam sites. Springer, Berlin, p 428CrossRef Ewert F-K (1985) Rock grouting with emphasis on dam sites. Springer, Berlin, p 428CrossRef
Zurück zum Zitat Ewert F-K (1997a) Permeability, groutability and grouting of rocks related to dam sites. Part 1: groutability and grouting of rock. Dam Eng 8(1):31–77 Ewert F-K (1997a) Permeability, groutability and grouting of rocks related to dam sites. Part 1: groutability and grouting of rock. Dam Eng 8(1):31–77
Zurück zum Zitat Ewert F-K (1997b) Permeability, groutability and grouting of rocks related to dam sites. Part 2: groutability and grouting of rock. Dam Eng 8(2):123–176 Ewert F-K (1997b) Permeability, groutability and grouting of rocks related to dam sites. Part 2: groutability and grouting of rock. Dam Eng 8(2):123–176
Zurück zum Zitat Ewert F-K (1997c) Permeability, groutability and grouting of rocks related to dam sites. Part 3: groutability and grouting of rock. Dam Eng 8(3):215–248 Ewert F-K (1997c) Permeability, groutability and grouting of rocks related to dam sites. Part 3: groutability and grouting of rock. Dam Eng 8(3):215–248
Zurück zum Zitat Ewert F-K (1997d) Permeability, groutability and grouting of rocks related to dam sites. Part 4: groutability and grouting of rock. Dam Eng 8(4):271–325 Ewert F-K (1997d) Permeability, groutability and grouting of rocks related to dam sites. Part 4: groutability and grouting of rock. Dam Eng 8(4):271–325
Zurück zum Zitat Fransson Å, Tsang CF, Rutqvist J, Gustafson G (2010) Estimation of deformation and stiffness of fractures close to tunnels using data from single-hole hydraulic testing and grouting. Int J Rock Mech Min 47(6):887–893CrossRef Fransson Å, Tsang CF, Rutqvist J, Gustafson G (2010) Estimation of deformation and stiffness of fractures close to tunnels using data from single-hole hydraulic testing and grouting. Int J Rock Mech Min 47(6):887–893CrossRef
Zurück zum Zitat Gularte FB, Taylor GE, Shao LS (2007) Observational monitoring methods for improved grouting and soil improvement. ASCE Geo Institute, GeoDenver, Denver, CO18–21 Gularte FB, Taylor GE, Shao LS (2007) Observational monitoring methods for improved grouting and soil improvement. ASCE Geo Institute, GeoDenver, Denver, CO18–21
Zurück zum Zitat Gularte FB, Ringen DA, Shao LS (2012) Advances in monitoring and control systems for high mobility grouting. In: Grouting and deep mixing 2012, ASCE, pp 1238–1247 Gularte FB, Ringen DA, Shao LS (2012) Advances in monitoring and control systems for high mobility grouting. In: Grouting and deep mixing 2012, ASCE, pp 1238–1247
Zurück zum Zitat Gustafson G, Claesson J (2005) Steering parameters for rock grouting. Unpublished paper submitted to the Int J Rock Mech Min, pp 19. Received from Stille H (2009) in a private correspondence Gustafson G, Claesson J (2005) Steering parameters for rock grouting. Unpublished paper submitted to the Int J Rock Mech Min, pp 19. Received from Stille H (2009) in a private correspondence
Zurück zum Zitat Gustafson G, Stille H (1996) Prediction of groutability from grout properties and hydrogeological data. Tunn Undergr Sp Tech 11(3):325–332CrossRef Gustafson G, Stille H (1996) Prediction of groutability from grout properties and hydrogeological data. Tunn Undergr Sp Tech 11(3):325–332CrossRef
Zurück zum Zitat Gustafson G, Stille H (2005) Stop criteria for cement grouting. Felsbau 3:62–68 Gustafson G, Stille H (2005) Stop criteria for cement grouting. Felsbau 3:62–68
Zurück zum Zitat Hang W, Zhao CH (2001) Development and application of grouting monitoring system of Xiaolangdi grouting project. Water Res Hydropower Eng 32(11):33–34 Hang W, Zhao CH (2001) Development and application of grouting monitoring system of Xiaolangdi grouting project. Water Res Hydropower Eng 32(11):33–34
Zurück zum Zitat Hernqvist L, Butrón C, Fransson Å, Gustafson G, Funehag J (2012) A hard rock tunnel case study: Characterization of the water-bearing fracture system for tunnel grouting. Tunn Undergr Sp Tech 30:132–144CrossRef Hernqvist L, Butrón C, Fransson Å, Gustafson G, Funehag J (2012) A hard rock tunnel case study: Characterization of the water-bearing fracture system for tunnel grouting. Tunn Undergr Sp Tech 30:132–144CrossRef
Zurück zum Zitat Hernqvist L, Gustafson G, Fransson Å, Norberg T (2013) A statistical grouting decision method based on water pressure tests for the tunnel construction stage-A case study. Tunn Undergr Sp Tech 33:54–62CrossRef Hernqvist L, Gustafson G, Fransson Å, Norberg T (2013) A statistical grouting decision method based on water pressure tests for the tunnel construction stage-A case study. Tunn Undergr Sp Tech 33:54–62CrossRef
Zurück zum Zitat Høien AH, Nilsen B (2013) Rock mass grouting in the Løren tunnel: case study with the main focus on the groutability and feasibility of drill parameter interpretation. Rock Mech Rock Eng. doi:10.1007/s00603-013-0386-7 Høien AH, Nilsen B (2013) Rock mass grouting in the Løren tunnel: case study with the main focus on the groutability and feasibility of drill parameter interpretation. Rock Mech Rock Eng. doi:10.​1007/​s00603-013-0386-7
Zurück zum Zitat Houlsby AC (1990) Construction and design of cement grouting. Wiley, New York 442 pp Houlsby AC (1990) Construction and design of cement grouting. Wiley, New York 442 pp
Zurück zum Zitat Huo JQ (2010) Water resources and hydropower engineering grouting process control. Res Appl Build Mater: 47–48 Huo JQ (2010) Water resources and hydropower engineering grouting process control. Res Appl Build Mater: 47–48
Zurück zum Zitat Kobayashi S, Stille H, Gustafson G, Stille B (2008) Real time grouting control method: development and application using Äspö HRL data, SKB. Technical Report R-08-133. Swedish Nuclear Fueland Waste Management Company, Stockholm, Sweden Kobayashi S, Stille H, Gustafson G, Stille B (2008) Real time grouting control method: development and application using Äspö HRL data, SKB. Technical Report R-08-133. Swedish Nuclear Fueland Waste Management Company, Stockholm, Sweden
Zurück zum Zitat Liu XG (2012) The design and develop of material processing software for grouting construction, Master’s thesis. Central South University, ChangSha, China, pp 1–2 Liu XG (2012) The design and develop of material processing software for grouting construction, Master’s thesis. Central South University, ChangSha, China, pp 1–2
Zurück zum Zitat Lombardi G, Deere D (1993) Grouting design and control using the GIN principle. Water Power Dam Constr 45(6):15–22 Lombardi G, Deere D (1993) Grouting design and control using the GIN principle. Water Power Dam Constr 45(6):15–22
Zurück zum Zitat Rao XK, Wang H (2013) Application of B/S network-based digital grouting management system to hydroprojects. J Yangtze River Sci Res Inst 30(2):79–82 Rao XK, Wang H (2013) Application of B/S network-based digital grouting management system to hydroprojects. J Yangtze River Sci Res Inst 30(2):79–82
Zurück zum Zitat Sadeghiyeh SM, Hashemi M, Ajalloeian R (2013) Comparison of permeability and groutability of Ostur dam site rock mass for grout curtain design. Rock Mech Rock Eng 46(2):341–357CrossRef Sadeghiyeh SM, Hashemi M, Ajalloeian R (2013) Comparison of permeability and groutability of Ostur dam site rock mass for grout curtain design. Rock Mech Rock Eng 46(2):341–357CrossRef
Zurück zum Zitat Stille B, Stille H, Gustafson G, Kobayashi S (2009) Experience with the real time grouting control method. Geomech Tunn 2(5):447–459CrossRef Stille B, Stille H, Gustafson G, Kobayashi S (2009) Experience with the real time grouting control method. Geomech Tunn 2(5):447–459CrossRef
Zurück zum Zitat Stille H, Gustafson G, Hassler L (2012) Application of new theories and technology for Grouting of Dams and Foundations on rock. Geotech Geol Eng 30(3):603–624CrossRef Stille H, Gustafson G, Hassler L (2012) Application of new theories and technology for Grouting of Dams and Foundations on rock. Geotech Geol Eng 30(3):603–624CrossRef
Zurück zum Zitat Uromeihy A, Farrokhi R (2012) Evaluating groutability at the Kamal-Saleh dam based on Lugeon tests. Bull Eng Geol Environ 71(2):215–219CrossRef Uromeihy A, Farrokhi R (2012) Evaluating groutability at the Kamal-Saleh dam based on Lugeon tests. Bull Eng Geol Environ 71(2):215–219CrossRef
Zurück zum Zitat Wilson DB, Dreese TL (2002) Advances in computer monitoring and analysis for grouting of dams. US Society on Dams Annual Conference Proceedings, San Diego, CA. USSD, Denver Wilson DB, Dreese TL (2002) Advances in computer monitoring and analysis for grouting of dams. US Society on Dams Annual Conference Proceedings, San Diego, CA. USSD, Denver
Zurück zum Zitat Yan FG, Miao ZJ, Li MC, Zhong DH (2012) Visual analysis for grouting engineering of dam foundation based on 3D geological model. Chin J Geotech Eng 34(3):567–572 Yan FG, Miao ZJ, Li MC, Zhong DH (2012) Visual analysis for grouting engineering of dam foundation based on 3D geological model. Chin J Geotech Eng 34(3):567–572
Zurück zum Zitat Zhong DH, Li MC, Wang G, Liu DH (2005) Visualization Analysis of Complex Geologic Body with NURBS Model. J Comput-Aided Design Comput Graph 17(2):284–290 Zhong DH, Li MC, Wang G, Liu DH (2005) Visualization Analysis of Complex Geologic Body with NURBS Model. J Comput-Aided Design Comput Graph 17(2):284–290
Zurück zum Zitat Zhong DH, Li MC, Song LG, Wang G (2006) Enhanced NURBS model and visualization for large 3-D geo engineering applications: an example from the Jinping first level hydropower engineering project China. Comput Geosci-UK 32(9):1270–1282CrossRef Zhong DH, Li MC, Song LG, Wang G (2006) Enhanced NURBS model and visualization for large 3-D geo engineering applications: an example from the Jinping first level hydropower engineering project China. Comput Geosci-UK 32(9):1270–1282CrossRef
Metadaten
Titel
A Real-Time Analysis and Feedback System for Quality Control of Dam Foundation Grouting Engineering
verfasst von
D. H. Zhong
F. G. Yan
M. C. Li
C. X. Huang
K. Fan
J. F. Tang
Publikationsdatum
01.09.2015
Verlag
Springer Vienna
Erschienen in
Rock Mechanics and Rock Engineering / Ausgabe 5/2015
Print ISSN: 0723-2632
Elektronische ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-014-0686-6

Weitere Artikel der Ausgabe 5/2015

Rock Mechanics and Rock Engineering 5/2015 Zur Ausgabe