Skip to main content
Log in

Two-Machine Flowshop Batching and Scheduling

  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

We consider in this paper a two-machine flowshop scheduling problem in which the first machine processes jobs individually while the second machine processes jobs in batches. The forming of each batch on the second machine incurs a constant setup time. The objective is to minimize the makespan. This problem was previously shown to be NP-hard in the ordinary sense. In this paper, we first present a strong NP-hardness result of the problem. We also identify a polynomially solvable case with either anticipatory or non-anticipatory setups. We then establish a property that an optimal solution for the special case is a lower bound for the general problem. To obtain near-optimal solutions for the general problem, we devise some heuristics. The lower bound is used to evaluate the quality of the heuristic solutions. Results of computational experiments reveal that the heuristics produce solutions with small error ratios. They also suggest that the lower bound is close to the optimal solution.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ahmadi, J.H., R.H. Ahmadi, S. Dasu, and C.S. Tang. (1992). “Batching and Scheduling on Batch and Discrete Processors.” Operations Research 40, 750–763.

    Google Scholar 

  • Albers, A. and P. Brucker. (1993). “The Complexity of One-Machine Batching Problem.” Discrete Applied Mathatmematics 47, 87–107.

    Google Scholar 

  • Allahverdi, A., J.N.D. Gupta, and T. Aldowaisan. (1999). “A Review of Scheduling Research Involving Setup Considerations.” Omega 27, 219–239.

    Article  Google Scholar 

  • Cheng, T.C.E., Z.-L. Chen, M.Y. Kovalyov, and B.M.T. Lin. (1996). “Parallel-Machine Batching and Scheduling to Minimize Total Completion Time.” IIE Transactions 28, 953–956.

    Google Scholar 

  • Cheng, T.C.E., J.N.D. Gupta, and G. Wang. (2000). “A Review of Flowshop Scheduling Research with Setup Times.” Production and Operations Management 9, 262–282.

    Article  Google Scholar 

  • Cheng, T.C.E., M.Y. Kovalyov, and B.M.T. Lin. (1997). “Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties.” SIAM Journal on Optimization 7, 547–559.

    Article  Google Scholar 

  • Cheng, T.C.E., B.M.T. Lin, and A. Toker. (2000). “Makespan Minimization in the Two-Machine Flowshop Batch Scheduling Problem.” Naval Research Logistics 47, 128–144.

    Article  Google Scholar 

  • Cheng, T.C.E. and G. Wang. (1998). “Batching and Scheduling to Minimize the Makespan in the Two-Machine Flowshop.” IIE Transactions 30, 447–453.

    Google Scholar 

  • Coffmann, E.G., A. Nozari, and M. Yannakakis. (1989). “Optimal Scheduling of Products with Two Subassemblies on a Single Machine.” Operations Research 37, 426–436.

    Article  Google Scholar 

  • Garey, M.R. and D.S. Johnson. (1979). Computers and Intractability: A Guide to the Theory of NP-Completeness. San Francisco: Freeman.

    Google Scholar 

  • Glass, C.A., C.N. Potts, and A.V. Strusevich. (2001). “Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops.” INFORMS Journal on Computing 13, 120–137.

    Article  Google Scholar 

  • Johnson, S.M. (1954). “Optimal Two- and Three-Stage Production Schedules with Setup Times Included.” Naval Research Logistics Quarterly 1, 61–67.

    Google Scholar 

  • Lin, B.M.T. and J.M. Wu. (2002). “A New Lower Bound Scheme for the Two-Machine Flowshop Scheduling to Minimize the Total Completion Time.” In Electronic Proceedings of the Fourth Asia-Pacific Conference on Industrial Engineering and Management Systems, Taipei, Taiwan, December 2002.

  • Naddef, D. and C. Santos. (1988). “One-Pass Batching Algorithms for the One-Machine Problem.” Discrete Applied Matthematics 21, 133–146.

    Google Scholar 

  • Potts, C.N. and M.K. Kovalyov. (2000). “Scheduling with Batching: A Review.” European Journal of Operational Research 102, 228–249.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to B. M. T. Lin.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lin, B.M.T., Cheng, T.C.E. Two-Machine Flowshop Batching and Scheduling. Ann Oper Res 133, 149–161 (2005). https://doi.org/10.1007/s10479-004-5029-7

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10479-004-5029-7

Keywords

Navigation