Abstract
An analytical approach to assess the mini hydropower potential is proposed on a GIS platform. The mini hydropower potential is defined in terms of a synthetic index that measures the investment feasibility of a given hydropower plant. The investigation of the mini hydropower potential is performed at the catchment scale by integrating: catchment morphometric analysis; setting criteria for locating the weirs and powerhouses; hydrological modelling; engineering analysis; economic analysis and mapping. The integrated approach has been tested on the Arroscia catchment (Italy) where 27 weir sections have been examined thus resulting into 640 evaluated mini hydropower plant alternatives. Hydropower potential results indicate that in 14 over 27 sub-catchments it is possible to select at least a specific powerhouse location where the investment is affordable. The determination of MHP indexes in a simplified framework overcomes the typical problem due to the single prediction of hydropower potential for a specific plant configuration. The comprehensive MHP analysis allows to supports the energy management strategies while ensuring the sustainable water resource management at the catchment scale.
Similar content being viewed by others
References
Abbasi T, Abbasi SA (2011) Small hydro and the environmental implications of its extensive utilization. Renew Sust Energ Rev 15(4):2134–2143. doi:10.1016/j.rser.2010.11.050
AEEG - Authority for Electric Energy and Gas (2011) ARG/elt 103/11. Definition of the minimum guaranteed prices according to the deliberation ARG/elt 280/07 (in Italian)
Aggidis GA, Luchinskaya E, Rothschild R, Howard DC (2010) The costs of small-scale hydro power production: impact on the development of existing potential. Renew Energy 35(12):2632–2638. doi:10.1016/j.renene.2010.04.008
Basso S, Botter G (2012) Streamflow variability and optimal capacity of run-of-river hydropower plants. Water Resour Res 48(10), W10527. doi:10.1029/2012WR012017
Belmonte S, Núñez V, Viramonte JG, Franco J (2009) Potential renewable energy resources of the Lerma Valley, Salta, Argentina for its strategic territorial planning. Renew Sust Energ Rev 13(6–7):1475–1484. doi:10.1016/j.rser.2008.09.014
Cohen Liechti T, Matos JP, Boillat J-L, Schleiss AJ (2015) Influence of hydropower development on flow regime in the Zambezi river basin for different scenarios of environmental flows. Water Resour Manag 29(3):731–747. doi:10.1007/s11269-014-0838-1
ESHA – European Small Hydropower Association (1998) Layman's handbook on how to develop a small hydro site. Rep. DG XVII - 97/010
Gorla L, Perona P (2013) On quantifying ecologically sustainable flow releases in a diverted river reach. J Hydrol 489:98–107. doi:10.1016/j.jhydrol.2013.02.043
Goyal MK, Singh V, Meena AH (2015) Geospatial and hydrological modeling to assess hydropower potential zones and site location over rainfall dependent Inland catchment. Water Resour Manag 29(8):2875–2894. doi:10.1007/s11269-015-0975-1
HYDI - The European Hydro Database (2012) Statistics and information on energy, market and policy data. http://streammap.esha.be/6.0.html
La Barbera P, Gnecco I, Palla A (2014) Technical-scientific report on the development of the integrated GIS approach. Annex A to Deliverable I - POR-FESR Liguria/7/43-12/07/2011 Project, Department of Civil, Chemical and Environmental Engineering, University of Genova, Italy, 45 pp (In Italian)
Larentis DG, Collischonn W, Olivera F, Tucci CEM (2010) Gis-based procedures for hydropower potential spotting. Energy 35(10):4237–4243. doi:10.1016/j.energy.2010.07.014
Lazzaro G, Basso S, Schirmer M, Botter G (2013) Water management strategies for run-of-river power plants: profitability and hydrologic impact between the intake and the outflow. Water Resour Res 49(12):8285–8298. doi:10.1002/2013WR014210
Liucci L, Valigi D, Casadei S (2014) A new application of Flow Duration Curve (FDC) in designing run-of-river power plants. Water Resour Manag 28(3):881–895. doi:10.1007/s11269-014-0523-4
Ogayar B, Vidal PG (2009) Cost determination of the electro-mechanical equipment of a small hydro-power plant. Renew Energy 34(1):6–13. doi:10.1016/j.renene.2008.04.039
Rojanamon P, Chaisomphob T, Bureekul T (2009) Application of geographical information system to site selection of small run-of-river hydropower project by considering engineering/economic/environmental criteria and social impact. Renew Sust Energ Rev 13(9):2336–2348. doi:10.1016/j.rser.2009.07.003
Šantl S, Steinman F (2015) Hydropower suitability analysis on a large scale level: inclusion of a calibration phase to support determination of model parameters. Water Resour Manag 29(1):109–123. doi:10.1007/s11269-014-0830-9
Thornthwaite CW (1948) An approach toward a rational classification of climate. Geogr Rev 38(1):55–94. doi:10.2307/210739
Vogel RM, Fennessey NM (1994) Flow-duration curves. I: new interpretation and confidence intervals. J Water Res Pl-ASCE 120(4):485–504. doi:10.1061/(ASCE)0733-9496(1994)120:4(485)
Acknowledgments
The study was funded within the project “Preliminary study to assess mini hydropower potential in the regional territory” of the Regional Operational Program, co-financed by the European Regional Development Fund 2007–2013 (POR-FESR Liguria/7/43-12/07/2011).
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of Interest
No conflict of interest.
Rights and permissions
About this article
Cite this article
Palla, A., Gnecco, I., La Barbera, P. et al. An Integrated GIS Approach to Assess the Mini Hydropower Potential. Water Resour Manage 30, 2979–2996 (2016). https://doi.org/10.1007/s11269-016-1318-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-016-1318-6