An Integrated GIS Approach to Assess the Mini Hydropower Potential

  • Published:
Water Resources Management Aims and scope Submit manuscript

Abstract

An analytical approach to assess the mini hydropower potential is proposed on a GIS platform. The mini hydropower potential is defined in terms of a synthetic index that measures the investment feasibility of a given hydropower plant. The investigation of the mini hydropower potential is performed at the catchment scale by integrating: catchment morphometric analysis; setting criteria for locating the weirs and powerhouses; hydrological modelling; engineering analysis; economic analysis and mapping. The integrated approach has been tested on the Arroscia catchment (Italy) where 27 weir sections have been examined thus resulting into 640 evaluated mini hydropower plant alternatives. Hydropower potential results indicate that in 14 over 27 sub-catchments it is possible to select at least a specific powerhouse location where the investment is affordable. The determination of MHP indexes in a simplified framework overcomes the typical problem due to the single prediction of hydropower potential for a specific plant configuration. The comprehensive MHP analysis allows to supports the energy management strategies while ensuring the sustainable water resource management at the catchment scale.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6

Similar content being viewed by others

References

  • Abbasi T, Abbasi SA (2011) Small hydro and the environmental implications of its extensive utilization. Renew Sust Energ Rev 15(4):2134–2143. doi:10.1016/j.rser.2010.11.050

    Article  Google Scholar 

  • AEEG - Authority for Electric Energy and Gas (2011) ARG/elt 103/11. Definition of the minimum guaranteed prices according to the deliberation ARG/elt 280/07 (in Italian)

  • Aggidis GA, Luchinskaya E, Rothschild R, Howard DC (2010) The costs of small-scale hydro power production: impact on the development of existing potential. Renew Energy 35(12):2632–2638. doi:10.1016/j.renene.2010.04.008

    Article  Google Scholar 

  • Basso S, Botter G (2012) Streamflow variability and optimal capacity of run-of-river hydropower plants. Water Resour Res 48(10), W10527. doi:10.1029/2012WR012017

    Article  Google Scholar 

  • Belmonte S, Núñez V, Viramonte JG, Franco J (2009) Potential renewable energy resources of the Lerma Valley, Salta, Argentina for its strategic territorial planning. Renew Sust Energ Rev 13(6–7):1475–1484. doi:10.1016/j.rser.2008.09.014

    Article  Google Scholar 

  • Cohen Liechti T, Matos JP, Boillat J-L, Schleiss AJ (2015) Influence of hydropower development on flow regime in the Zambezi river basin for different scenarios of environmental flows. Water Resour Manag 29(3):731–747. doi:10.1007/s11269-014-0838-1

    Article  Google Scholar 

  • ESHA – European Small Hydropower Association (1998) Layman's handbook on how to develop a small hydro site. Rep. DG XVII - 97/010

  • Gorla L, Perona P (2013) On quantifying ecologically sustainable flow releases in a diverted river reach. J Hydrol 489:98–107. doi:10.1016/j.jhydrol.2013.02.043

    Article  Google Scholar 

  • Goyal MK, Singh V, Meena AH (2015) Geospatial and hydrological modeling to assess hydropower potential zones and site location over rainfall dependent Inland catchment. Water Resour Manag 29(8):2875–2894. doi:10.1007/s11269-015-0975-1

    Article  Google Scholar 

  • HYDI - The European Hydro Database (2012) Statistics and information on energy, market and policy data. http://streammap.esha.be/6.0.html

  • La Barbera P, Gnecco I, Palla A (2014) Technical-scientific report on the development of the integrated GIS approach. Annex A to Deliverable I - POR-FESR Liguria/7/43-12/07/2011 Project, Department of Civil, Chemical and Environmental Engineering, University of Genova, Italy, 45 pp (In Italian)

  • Larentis DG, Collischonn W, Olivera F, Tucci CEM (2010) Gis-based procedures for hydropower potential spotting. Energy 35(10):4237–4243. doi:10.1016/j.energy.2010.07.014

    Article  Google Scholar 

  • Lazzaro G, Basso S, Schirmer M, Botter G (2013) Water management strategies for run-of-river power plants: profitability and hydrologic impact between the intake and the outflow. Water Resour Res 49(12):8285–8298. doi:10.1002/2013WR014210

    Article  Google Scholar 

  • Liucci L, Valigi D, Casadei S (2014) A new application of Flow Duration Curve (FDC) in designing run-of-river power plants. Water Resour Manag 28(3):881–895. doi:10.1007/s11269-014-0523-4

    Article  Google Scholar 

  • Ogayar B, Vidal PG (2009) Cost determination of the electro-mechanical equipment of a small hydro-power plant. Renew Energy 34(1):6–13. doi:10.1016/j.renene.2008.04.039

    Article  Google Scholar 

  • Rojanamon P, Chaisomphob T, Bureekul T (2009) Application of geographical information system to site selection of small run-of-river hydropower project by considering engineering/economic/environmental criteria and social impact. Renew Sust Energ Rev 13(9):2336–2348. doi:10.1016/j.rser.2009.07.003

    Article  Google Scholar 

  • Šantl S, Steinman F (2015) Hydropower suitability analysis on a large scale level: inclusion of a calibration phase to support determination of model parameters. Water Resour Manag 29(1):109–123. doi:10.1007/s11269-014-0830-9

    Article  Google Scholar 

  • Thornthwaite CW (1948) An approach toward a rational classification of climate. Geogr Rev 38(1):55–94. doi:10.2307/210739

    Article  Google Scholar 

  • Vogel RM, Fennessey NM (1994) Flow-duration curves. I: new interpretation and confidence intervals. J Water Res Pl-ASCE 120(4):485–504. doi:10.1061/(ASCE)0733-9496(1994)120:4(485)

    Article  Google Scholar 

Download references

Acknowledgments

The study was funded within the project “Preliminary study to assess mini hydropower potential in the regional territory” of the Regional Operational Program, co-financed by the European Regional Development Fund 2007–2013 (POR-FESR Liguria/7/43-12/07/2011).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to I. Gnecco.

Ethics declarations

Conflict of Interest

No conflict of interest.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Palla, A., Gnecco, I., La Barbera, P. et al. An Integrated GIS Approach to Assess the Mini Hydropower Potential. Water Resour Manage 30, 2979–2996 (2016). https://doi.org/10.1007/s11269-016-1318-6

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11269-016-1318-6

Keywords

Navigation