Skip to main content
Erschienen in: The International Journal of Life Cycle Assessment 8/2016

05.04.2016 | UNCERTAINTIES IN LCA

Uncertainty in life cycle costing for long-range infrastructure. Part II: guidance and suitability of applied methods to address uncertainty

verfasst von: Christoph Scope, Patrick Ilg, Stefan Muench, Edeltraud Guenther

Erschienen in: The International Journal of Life Cycle Assessment | Ausgabe 8/2016

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Life cycle costing (LCC) is the state-of-the-art method to economically evaluate long-term projects over their life spans. However, uncertainty in long-range planning raises concerns about LCC results. In Part I of this series, we developed a holistic framework of the different types of uncertainty in infrastructure LCCs. We also collected methods to address these uncertainties. The aim of Part II is to evaluate the suitability of methods to cope with uncertainty in LCC. Part I addressed two research gaps. It presented a systematic collection of uncertainties and methods in LCC and, furthermore, provided a holistic categorization of both. However, Part I also raised new issues. First, a combined analysis of sources and methods is still outstanding. Such an investigation would reveal the suitability of different methods to address a certain type of uncertainty. Second, what has not been assessed so far is what types of uncertainty are insufficiently addressed in LCC. This would be a feature to improve accuracy of LCC results within LCC, by suggesting options to better cope with uncertainty. To address these research gaps, we conducted a systematic literature review. Part II analyzed the suitability of methods to address uncertainties. The suitability depends on data availability, type of data (tangible, intangible, random, non-random), screened hotspots, and tested modeling specifications. We identified types of uncertainties and methods that have been insufficiently addressed. The methods include probabilistic modeling such as design of experiment or subset simulation and evolutionary algorithm and Bayesian modeling such as the Bayesian latent Markov decision process. Subsequently, we evaluated learning potential from other life cycle assessment (LCA) and life cycle sustainability assessment (LCSA). This analysis revealed 28 possible applications that have not yet been used in LCC. Lastly, we developed best practices for LCC practitioners. This systematic review complements prior research on uncertainty in LCC for infrastructure, as laid out in Part I. Part II concludes that all relevant methods to address uncertainty are currently applied in LCC. Yet, the level of application is different. Moreover, not all methods are equally suited to address different categories of uncertainty. This review offers guidance on what to do for each source and type of uncertainty. It illustrates how methods can address both based on current practice in LCC, LCA, and LCSA. The findings of Part II encourage a dialog between practitioners of LCC, LCA, and LCSA to advance research and practice in uncertainty analysis.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Anhänge
Nur mit Berechtigung zugänglich
Literatur
Zurück zum Zitat Aissani A, Chateauneuf A, Fontaine J-P, Audebert P (2014) Cost model for optimum thicknesses of insulated walls considering indirect impacts and uncertainties. Energy Build 84:21–32CrossRef Aissani A, Chateauneuf A, Fontaine J-P, Audebert P (2014) Cost model for optimum thicknesses of insulated walls considering indirect impacts and uncertainties. Energy Build 84:21–32CrossRef
Zurück zum Zitat Albogamy A, Dawood N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: applied to the KSA. Engineering. Constr Archit Manage 22:493–515CrossRef Albogamy A, Dawood N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: applied to the KSA. Engineering. Constr Archit Manage 22:493–515CrossRef
Zurück zum Zitat ASCE (2015) Journal of Infrastructure Systems, American Society of Civil Engineers, available at: http://ascelibrary.org/page/jitse4/editorialboard ASCE (2015) Journal of Infrastructure Systems, American Society of Civil Engineers, available at: http://​ascelibrary.​org/​page/​jitse4/​editorialboard
Zurück zum Zitat Andrade AR, Teixeira PF (2012) A Bayesian model to assess rail track geometry degradation through its life-cycle. Res Trans E 36:1–8CrossRef Andrade AR, Teixeira PF (2012) A Bayesian model to assess rail track geometry degradation through its life-cycle. Res Trans E 36:1–8CrossRef
Zurück zum Zitat Anwari M, Rashid M, Muhyiddin H, Ali A (2012) An evaluation of hybrid wind/diesel energy potential in Pemanggil Island Malaysia. IEEE 1–5 Anwari M, Rashid M, Muhyiddin H, Ali A (2012) An evaluation of hybrid wind/diesel energy potential in Pemanggil Island Malaysia. IEEE 1–5
Zurück zum Zitat Apostolakis G (1990) The concept of probability in safety assessments of technological systems. Science 250:1359–1364CrossRef Apostolakis G (1990) The concept of probability in safety assessments of technological systems. Science 250:1359–1364CrossRef
Zurück zum Zitat Asiedu Y, Besant RW (2000) Simulation-based cost estimation under economic uncertainty using kernel estimators. Int J Prod Res 38:2023–2035CrossRef Asiedu Y, Besant RW (2000) Simulation-based cost estimation under economic uncertainty using kernel estimators. Int J Prod Res 38:2023–2035CrossRef
Zurück zum Zitat Battke B, Schmidt TS, Grosspietsch D, Hoffmann VH (2013) A review and probabilistic model of lifecycle costs of stationary batteries in multiple applications. Renew Sust Energ Rev 25:240–250CrossRef Battke B, Schmidt TS, Grosspietsch D, Hoffmann VH (2013) A review and probabilistic model of lifecycle costs of stationary batteries in multiple applications. Renew Sust Energ Rev 25:240–250CrossRef
Zurück zum Zitat Björklund AE (2002) Survey of approaches to improve reliability in LCA. Int J Life Cycle Assess 7:64–72CrossRef Björklund AE (2002) Survey of approaches to improve reliability in LCA. Int J Life Cycle Assess 7:64–72CrossRef
Zurück zum Zitat Bolger F (1996) Uncertainty: a guide to dealing with uncertainty in quantitative risk and policy analysis. J Behav Decis Making 9:147–148CrossRef Bolger F (1996) Uncertainty: a guide to dealing with uncertainty in quantitative risk and policy analysis. J Behav Decis Making 9:147–148CrossRef
Zurück zum Zitat Boussabaine HA, Kirkham RJ (2004) Whole Life risk analysis techniques. In: Whole Life-Cycle Costing: Risk and Risk Responses. Blackwell Publishing Ltd, pp 56–83 Boussabaine HA, Kirkham RJ (2004) Whole Life risk analysis techniques. In: Whole Life-Cycle Costing: Risk and Risk Responses. Blackwell Publishing Ltd, pp 56–83
Zurück zum Zitat Budnitz RJ, Apostolakis G, Boore DM, et al. (1997) Recommendations for probabilistic seismic hazard analysis: guidance on uncertainty and use of experts. US Nuclear Regulatory Commission Washington, DC Budnitz RJ, Apostolakis G, Boore DM, et al. (1997) Recommendations for probabilistic seismic hazard analysis: guidance on uncertainty and use of experts. US Nuclear Regulatory Commission Washington, DC
Zurück zum Zitat Buyle M, Braet J, Audenaert A (2013) Life cycle assessment in the construction sector: a review. Renew Sust Energ Rev 26:379–388CrossRef Buyle M, Braet J, Audenaert A (2013) Life cycle assessment in the construction sector: a review. Renew Sust Energ Rev 26:379–388CrossRef
Zurück zum Zitat Chevalier J-L, Téno J-FL (1996) Life cycle analysis with ill-defined data and its application to building products. Int J Life Cycle Assess 1:90–96CrossRef Chevalier J-L, Téno J-FL (1996) Life cycle analysis with ill-defined data and its application to building products. Int J Life Cycle Assess 1:90–96CrossRef
Zurück zum Zitat Choe D-E, Gardoni P, Rosowsky D, Haukaas T (2008) Probabilistic capacity models and seismic fragility estimates for RC columns subject to corrosion. Reliab Eng Syst Saf 93:383–393CrossRef Choe D-E, Gardoni P, Rosowsky D, Haukaas T (2008) Probabilistic capacity models and seismic fragility estimates for RC columns subject to corrosion. Reliab Eng Syst Saf 93:383–393CrossRef
Zurück zum Zitat Ciroth A (2009) Cost data quality considerations for eco-efficiency measures. Ecol Econ 68:1583–1590CrossRef Ciroth A (2009) Cost data quality considerations for eco-efficiency measures. Ecol Econ 68:1583–1590CrossRef
Zurück zum Zitat Ciroth A, Muller S, Weidema B, Lesage P (2013) Empirically based uncertainty factors for the pedigree matrix in ecoinvent. Int J Life Cycle Assess. doi:10.1007/s11367-013-0670-5 Ciroth A, Muller S, Weidema B, Lesage P (2013) Empirically based uncertainty factors for the pedigree matrix in ecoinvent. Int J Life Cycle Assess. doi:10.​1007/​s11367-013-0670-5
Zurück zum Zitat Ciuffo B, Miola A, Punzo V, Sala S (2012) Dealing with uncertainty in sustainability assessment. Report on the application of different sensitivity analysis techniques to field specific simulation models Ciuffo B, Miola A, Punzo V, Sala S (2012) Dealing with uncertainty in sustainability assessment. Report on the application of different sensitivity analysis techniques to field specific simulation models
Zurück zum Zitat Clavreul J, Guyonnet D, Christensen TH (2012) Quantifying uncertainty in LCA-modelling of waste management systems. Waste Manage 32:2482–2495CrossRef Clavreul J, Guyonnet D, Christensen TH (2012) Quantifying uncertainty in LCA-modelling of waste management systems. Waste Manage 32:2482–2495CrossRef
Zurück zum Zitat Cole RC, Morandi F, Avenell J, Daniel GB (2005) Trans-splenic portal scintigraphy in normal dogs. Vet Radiol Ultrasound 46:146–152CrossRef Cole RC, Morandi F, Avenell J, Daniel GB (2005) Trans-splenic portal scintigraphy in normal dogs. Vet Radiol Ultrasound 46:146–152CrossRef
Zurück zum Zitat Cooper HM (1982) Scientific guidelines for conducting integrative research reviews. Rev Educ Res 52:291–302CrossRef Cooper HM (1982) Scientific guidelines for conducting integrative research reviews. Rev Educ Res 52:291–302CrossRef
Zurück zum Zitat Corominas L, Foley J, Guest JS et al (2013) Life cycle assessment applied to wastewater treatment: state of the art. Water Res 47:5480–5492CrossRef Corominas L, Foley J, Guest JS et al (2013) Life cycle assessment applied to wastewater treatment: state of the art. Water Res 47:5480–5492CrossRef
Zurück zum Zitat Crane D (1969) Social structure in a group of scientists: a test of the “invisible college” hypothesis. Ame Sociol Rev 34:335CrossRef Crane D (1969) Social structure in a group of scientists: a test of the “invisible college” hypothesis. Ame Sociol Rev 34:335CrossRef
Zurück zum Zitat de Saxcé M, Rabenasolo B, Perwuelz A (2014) Assessment and improvement of the appropriateness of an LCI data set on a system level—application to textile manufacturing. Int J Life Cycle Assess 19:950–961CrossRef de Saxcé M, Rabenasolo B, Perwuelz A (2014) Assessment and improvement of the appropriateness of an LCI data set on a system level—application to textile manufacturing. Int J Life Cycle Assess 19:950–961CrossRef
Zurück zum Zitat Dixit MK, Fernandez-Solis JL, Lavy S, Culp CH (2010) Identification of parameters for embodied energy measurement: a literature review. Energ Buildings 42:1238–1247CrossRef Dixit MK, Fernandez-Solis JL, Lavy S, Culp CH (2010) Identification of parameters for embodied energy measurement: a literature review. Energ Buildings 42:1238–1247CrossRef
Zurück zum Zitat Engelhardt S, Schwarz J, Thewes M (2014) The lifecycle cost concept for implementation of economic sustainability in tunnel construction / Das Lebenszykluskostenkonzept zur Umsetzung der ökonomischen Nachhaltigkeit von Tunnelbauwerken. Geomechanik und Tunnelbau 7:593–600CrossRef Engelhardt S, Schwarz J, Thewes M (2014) The lifecycle cost concept for implementation of economic sustainability in tunnel construction / Das Lebenszykluskostenkonzept zur Umsetzung der ökonomischen Nachhaltigkeit von Tunnelbauwerken. Geomechanik und Tunnelbau 7:593–600CrossRef
Zurück zum Zitat Ergonul S (2005) A probabilistic approach for earthquake loss estimation. Struct Saf 27:309–321CrossRef Ergonul S (2005) A probabilistic approach for earthquake loss estimation. Struct Saf 27:309–321CrossRef
Zurück zum Zitat Erkoyuncu JA, Roy R, Shehab E, Cheruvu K (2011) Understanding service uncertainties in industrial product–service system cost estimation. Int J Adv Manuf Tech 52:1223–1238CrossRef Erkoyuncu JA, Roy R, Shehab E, Cheruvu K (2011) Understanding service uncertainties in industrial product–service system cost estimation. Int J Adv Manuf Tech 52:1223–1238CrossRef
Zurück zum Zitat EU-COM JRC IES (2015) European Platform on Life Cycle Assessment: ILCD Handbook, available at: http://eplca.jrc.ec.europa.eu/ EU-COM JRC IES (2015) European Platform on Life Cycle Assessment: ILCD Handbook, available at: http://​eplca.​jrc.​ec.​europa.​eu/​
Zurück zum Zitat Fink A (2013) Conducting research literature reviews: from the Internet to paper. Sage Publications, Thousand Oaks, US-CA Fink A (2013) Conducting research literature reviews: from the Internet to paper. Sage Publications, Thousand Oaks, US-CA
Zurück zum Zitat Firouzi A, Rahai A (2012) An integrated ANN-GA for reliability based inspection of concrete bridge decks considering extent of corrosion-induced cracks and life cycle costs. Sci Iranica 19:974–981CrossRef Firouzi A, Rahai A (2012) An integrated ANN-GA for reliability based inspection of concrete bridge decks considering extent of corrosion-induced cracks and life cycle costs. Sci Iranica 19:974–981CrossRef
Zurück zum Zitat Gavankar S, Anderson S, Keller AA (2015) Critical components of uncertainty communication in life cycle assessments of emerging technologies: nanotechnology as a case study. J Ind Ecol 19:468–479CrossRef Gavankar S, Anderson S, Keller AA (2015) Critical components of uncertainty communication in life cycle assessments of emerging technologies: nanotechnology as a case study. J Ind Ecol 19:468–479CrossRef
Zurück zum Zitat Georgiadou MC, Hacking T, Guthrie P (2012) A conceptual framework for future-proofing the energy performance of buildings. Energ Policy 47:145–155CrossRef Georgiadou MC, Hacking T, Guthrie P (2012) A conceptual framework for future-proofing the energy performance of buildings. Energ Policy 47:145–155CrossRef
Zurück zum Zitat Gluch P, Baumann H (2004) The life cycle costing (LCC) approach: a conceptual discussion of its usefulness for environmental decision-making. Build Environ 39:571–580CrossRef Gluch P, Baumann H (2004) The life cycle costing (LCC) approach: a conceptual discussion of its usefulness for environmental decision-making. Build Environ 39:571–580CrossRef
Zurück zum Zitat Goh YM, Newnes LB, Mileham AR et al (2010) Uncertainty in through-life costing—review and perspectives. IEEE Trans Eng Manage 57:689–701CrossRef Goh YM, Newnes LB, Mileham AR et al (2010) Uncertainty in through-life costing—review and perspectives. IEEE Trans Eng Manage 57:689–701CrossRef
Zurück zum Zitat Gransberg DD, Diekmann J (2004) Quantifying pavement life cycle cost inflation uncertainty. AACE International Transactions, pp 1–1 Gransberg DD, Diekmann J (2004) Quantifying pavement life cycle cost inflation uncertainty. AACE International Transactions, pp 1–1
Zurück zum Zitat Greenberg M, Mayer H, Lewis D (2004) Life-cycle cost in a highly uncertain economic environment: the case of managing the US Department of Energy’s nuclear waste legacy. Fed Facil Environ J 15:67–82CrossRef Greenberg M, Mayer H, Lewis D (2004) Life-cycle cost in a highly uncertain economic environment: the case of managing the US Department of Energy’s nuclear waste legacy. Fed Facil Environ J 15:67–82CrossRef
Zurück zum Zitat Guinée JB, Heijungs R, Huppes G et al (2011) Life cycle assessment: past, present, and future. Environ Sci Technol 45:90–96CrossRef Guinée JB, Heijungs R, Huppes G et al (2011) Life cycle assessment: past, present, and future. Environ Sci Technol 45:90–96CrossRef
Zurück zum Zitat Han G, Srebric J, Enache-Pommer E (2014) Variability of optimal solutions for building components based on comprehensive life cycle cost analysis. Energ Build 79:223–231CrossRef Han G, Srebric J, Enache-Pommer E (2014) Variability of optimal solutions for building components based on comprehensive life cycle cost analysis. Energ Build 79:223–231CrossRef
Zurück zum Zitat Heidmann I, Milde J (2013) Communication about scientific uncertainty: how scientists and science journalists deal with uncertainties in nanoparticle research. Environ Sci Europe 25:25CrossRef Heidmann I, Milde J (2013) Communication about scientific uncertainty: how scientists and science journalists deal with uncertainties in nanoparticle research. Environ Sci Europe 25:25CrossRef
Zurück zum Zitat Heijungs R (1996) Identification of key issues for further investigation in improving the reliability of life-cycle assessments. J Clean Prod 4:159–166CrossRef Heijungs R (1996) Identification of key issues for further investigation in improving the reliability of life-cycle assessments. J Clean Prod 4:159–166CrossRef
Zurück zum Zitat Heijungs R, Huijbregts MA (2004) A review of approaches to treat uncertainty in LCA. Osnabruck, DE Heijungs R, Huijbregts MA (2004) A review of approaches to treat uncertainty in LCA. Osnabruck, DE
Zurück zum Zitat Heijungs R, Settanni E, Guinée J (2013) Toward a computational structure for life cycle sustainability analysis: unifying LCA and LCC. Int J Life Cycle Assess 18:1722–1733CrossRef Heijungs R, Settanni E, Guinée J (2013) Toward a computational structure for life cycle sustainability analysis: unifying LCA and LCC. Int J Life Cycle Assess 18:1722–1733CrossRef
Zurück zum Zitat Henriksson PJG, Guinée JB, Heijungs R et al (2014) A protocol for horizontal averaging of unit process data—including estimates for uncertainty. Int J Life Cycle Assess 19:429–436CrossRef Henriksson PJG, Guinée JB, Heijungs R et al (2014) A protocol for horizontal averaging of unit process data—including estimates for uncertainty. Int J Life Cycle Assess 19:429–436CrossRef
Zurück zum Zitat Herbold KD (2000) Using Monte Carlo simulation for pavement cost analysis. Public Roads 64:2 Herbold KD (2000) Using Monte Carlo simulation for pavement cost analysis. Public Roads 64:2
Zurück zum Zitat Hinow M, Mevissen M (2011) Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm. IEEE T Power Deliver 26:197–204CrossRef Hinow M, Mevissen M (2011) Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm. IEEE T Power Deliver 26:197–204CrossRef
Zurück zum Zitat Hong T, Han S, Lee S (2007) Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels. Autom Constr 16:140–152CrossRef Hong T, Han S, Lee S (2007) Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels. Autom Constr 16:140–152CrossRef
Zurück zum Zitat Hong T, Hastak M (2007) Life-cycle cost assessment model for fiber reinforced polymer bridge deck panels. Can J Civil Eng 34:976–991CrossRef Hong T, Hastak M (2007) Life-cycle cost assessment model for fiber reinforced polymer bridge deck panels. Can J Civil Eng 34:976–991CrossRef
Zurück zum Zitat Hoogmartens R, Van Passel S, Van Acker K, Dubois M (2014) Bridging the gap between LCA, LCC and CBA as sustainability assessment tools. Environ Impact Assess 48:27–33CrossRef Hoogmartens R, Van Passel S, Van Acker K, Dubois M (2014) Bridging the gap between LCA, LCC and CBA as sustainability assessment tools. Environ Impact Assess 48:27–33CrossRef
Zurück zum Zitat Huijbregts MAJ, Norris G, Bretz R et al (2001) Framework for modelling data uncertainty in life cycle inventories. Int J Life Cycle Assess 6:127–132CrossRef Huijbregts MAJ, Norris G, Bretz R et al (2001) Framework for modelling data uncertainty in life cycle inventories. Int J Life Cycle Assess 6:127–132CrossRef
Zurück zum Zitat IEC 62198 (2013) Managing risk in projects—application guidelines IEC 62198 (2013) Managing risk in projects—application guidelines
Zurück zum Zitat IEC 60300-3-3 (2004) Dependability management—part 3–3: Application guide - Life cycle costing IEC 60300-3-3 (2004) Dependability management—part 3–3: Application guide - Life cycle costing
Zurück zum Zitat Ilg P, Hoehne C, Guenther E (2016) High-performance materials in infrastructure: a review of applied life cycle costing and its drivers—the case of fiber-reinforced composites. J Clean Prod 112:926–945CrossRef Ilg P, Hoehne C, Guenther E (2016) High-performance materials in infrastructure: a review of applied life cycle costing and its drivers—the case of fiber-reinforced composites. J Clean Prod 112:926–945CrossRef
Zurück zum Zitat ISO 31000 (2009) Risk management—principles and guidelines ISO 31000 (2009) Risk management—principles and guidelines
Zurück zum Zitat ISO 14040 (2006) Environmental management—life cycle assessment—principles and framework ISO 14040 (2006) Environmental management—life cycle assessment—principles and framework
Zurück zum Zitat ISO 14044 (2006) Environmental management—life cycle assessment—requirements and guidelines ISO 14044 (2006) Environmental management—life cycle assessment—requirements and guidelines
Zurück zum Zitat Jørgensen A, Hermann IT, Mortensen JB (2010) Is LCC relevant in a sustainability assessment? Int J Life Cycle Assess 15:531–532CrossRef Jørgensen A, Hermann IT, Mortensen JB (2010) Is LCC relevant in a sustainability assessment? Int J Life Cycle Assess 15:531–532CrossRef
Zurück zum Zitat Jung P, Seo J, Lee J (2009) Probabilistic value analysis methodology for public water supply systems. Civ Eng Environ Syst 26:141–155CrossRef Jung P, Seo J, Lee J (2009) Probabilistic value analysis methodology for public water supply systems. Civ Eng Environ Syst 26:141–155CrossRef
Zurück zum Zitat Kayrbekova D, Markeset T, Ghodrati B (2011) Activity-based life cycle cost analysis as an alternative to conventional LCC in engineering design. Int J Syst Assur Eng Manag 2:218–225CrossRef Kayrbekova D, Markeset T, Ghodrati B (2011) Activity-based life cycle cost analysis as an alternative to conventional LCC in engineering design. Int J Syst Assur Eng Manag 2:218–225CrossRef
Zurück zum Zitat Kennedy DJ, Montgomery DC, Quay BH (1996) Data quality: stochastic environmental life cycle assessment modeling a probabilistic approach to incorporating variable input data quality. Int J Life Cycle Assess 1:199–207CrossRef Kennedy DJ, Montgomery DC, Quay BH (1996) Data quality: stochastic environmental life cycle assessment modeling a probabilistic approach to incorporating variable input data quality. Int J Life Cycle Assess 1:199–207CrossRef
Zurück zum Zitat Kim S, Frangopol DM (2011) Inspection and monitoring planning for RC structures based on minimization of expected damage detection delay. Prob Eng Mech 26:308–320CrossRef Kim S, Frangopol DM (2011) Inspection and monitoring planning for RC structures based on minimization of expected damage detection delay. Prob Eng Mech 26:308–320CrossRef
Zurück zum Zitat Kishk M (2004) Combining various facets of uncertainty in whole-life cost modelling. Constr Manage Econ 22:429–435CrossRef Kishk M (2004) Combining various facets of uncertainty in whole-life cost modelling. Constr Manage Econ 22:429–435CrossRef
Zurück zum Zitat Klöpffer W (2008) Life cycle sustainability assessment of products. Int J Life Cycle Assess 13:89–95CrossRef Klöpffer W (2008) Life cycle sustainability assessment of products. Int J Life Cycle Assess 13:89–95CrossRef
Zurück zum Zitat Klöpffer W, Ciroth A (2011) Is LCC relevant in a sustainability assessment? Int J Life Cycle Assess 16:99–101CrossRef Klöpffer W, Ciroth A (2011) Is LCC relevant in a sustainability assessment? Int J Life Cycle Assess 16:99–101CrossRef
Zurück zum Zitat Kumar YP, Bhimasingu R (2015) Renewable energy based microgrid system sizing and energy management for green buildings. J Modern Power Syst Clean Energy 3:1–13CrossRef Kumar YP, Bhimasingu R (2015) Renewable energy based microgrid system sizing and energy management for green buildings. J Modern Power Syst Clean Energy 3:1–13CrossRef
Zurück zum Zitat Laurent A, Clavreul J, Bernstad A et al (2014) Review of LCA studies of solid waste management systems—Part II: methodological guidance for a better practice. Waste Manage 34:589–606CrossRef Laurent A, Clavreul J, Bernstad A et al (2014) Review of LCA studies of solid waste management systems—Part II: methodological guidance for a better practice. Waste Manage 34:589–606CrossRef
Zurück zum Zitat Li C-T, Peng H, Sun J (2014) Life cycle cost analysis of wind power considering stochastic uncertainties. Energy 75:411–418CrossRef Li C-T, Peng H, Sun J (2014) Life cycle cost analysis of wind power considering stochastic uncertainties. Energy 75:411–418CrossRef
Zurück zum Zitat Lindholm A, Suomala P (2007) Learning by costing: sharpening cost image through life cycle costing? Int J Product Perform Manag 56:651–672CrossRef Lindholm A, Suomala P (2007) Learning by costing: sharpening cost image through life cycle costing? Int J Product Perform Manag 56:651–672CrossRef
Zurück zum Zitat Liu Z, Atamturktur S, Juang CH (2014) Reliability based multi-objective robust design optimization of steel moment resisting frame considering spatial variability of connection parameters. Eng Struct 76:393–403CrossRef Liu Z, Atamturktur S, Juang CH (2014) Reliability based multi-objective robust design optimization of steel moment resisting frame considering spatial variability of connection parameters. Eng Struct 76:393–403CrossRef
Zurück zum Zitat Li Y, Chen J, Feng L (2013) Dealing with uncertainty: a survey of theories and practices. IEEE T Knowl Data Eng 25:2463–2482CrossRef Li Y, Chen J, Feng L (2013) Dealing with uncertainty: a survey of theories and practices. IEEE T Knowl Data Eng 25:2463–2482CrossRef
Zurück zum Zitat Li Z, Madanu S (2009) Highway project level life-cycle benefit/cost analysis under certainty, risk, and uncertainty: methodology with case study. J Transp Eng 135:516–526CrossRef Li Z, Madanu S (2009) Highway project level life-cycle benefit/cost analysis under certainty, risk, and uncertainty: methodology with case study. J Transp Eng 135:516–526CrossRef
Zurück zum Zitat Lloyd SM, Ries R (2007) Characterizing, propagating, and analyzing uncertainty in life-cycle assessment: a survey of quantitative approaches. J Ind Ecol 11:161–179CrossRef Lloyd SM, Ries R (2007) Characterizing, propagating, and analyzing uncertainty in life-cycle assessment: a survey of quantitative approaches. J Ind Ecol 11:161–179CrossRef
Zurück zum Zitat Mata É, Sasic Kalagasidis A, Johnsson F (2015) Cost-effective retrofitting of Swedish residential buildings: effects of energy price developments and discount rates. Energy Efficiency 8:223–237CrossRef Mata É, Sasic Kalagasidis A, Johnsson F (2015) Cost-effective retrofitting of Swedish residential buildings: effects of energy price developments and discount rates. Energy Efficiency 8:223–237CrossRef
Zurück zum Zitat Mavrotas G, Florios K, Vlachou D (2010) Energy planning of a hospital using Mathematical Programming and Monte Carlo simulation for dealing with uncertainty in the economic parameters. Energ Convers Manage 51:722–731CrossRef Mavrotas G, Florios K, Vlachou D (2010) Energy planning of a hospital using Mathematical Programming and Monte Carlo simulation for dealing with uncertainty in the economic parameters. Energ Convers Manage 51:722–731CrossRef
Zurück zum Zitat May J, Brennan D (2003) Application of data quality assessment methods to an LCA of electricity generation. Int J Life Cycle Assess 8:215–225CrossRef May J, Brennan D (2003) Application of data quality assessment methods to an LCA of electricity generation. Int J Life Cycle Assess 8:215–225CrossRef
Zurück zum Zitat Mayring P (2003) Qualitative Inhaltsanalyse. Grundlagen und Techniken, Springer, Berlin, DE Mayring P (2003) Qualitative Inhaltsanalyse. Grundlagen und Techniken, Springer, Berlin, DE
Zurück zum Zitat McDonald M, Madanat S (2012) Life-cycle cost minimization and sensitivity analysis for mechanistic-empirical pavement design. J Transp Eng 138:706–713CrossRef McDonald M, Madanat S (2012) Life-cycle cost minimization and sensitivity analysis for mechanistic-empirical pavement design. J Transp Eng 138:706–713CrossRef
Zurück zum Zitat Menikpura SNM, Gheewala S, Bonnet S (2012) Sustainability assessment of municipal solid waste management in Sri Lanka: problems and prospects. J Mater Cycles Waste 14:181–192CrossRef Menikpura SNM, Gheewala S, Bonnet S (2012) Sustainability assessment of municipal solid waste management in Sri Lanka: problems and prospects. J Mater Cycles Waste 14:181–192CrossRef
Zurück zum Zitat Mishalani RG, Gong L (2009) Optimal infrastructure condition sampling over space and time for maintenance decision-making under uncertainty. Transport Res B: Meth 43:311–324CrossRef Mishalani RG, Gong L (2009) Optimal infrastructure condition sampling over space and time for maintenance decision-making under uncertainty. Transport Res B: Meth 43:311–324CrossRef
Zurück zum Zitat Moore T, Morrissey J (2014) Lifecycle costing sensitivities for zero energy housing in Melbourne, Australia. Energy Build 79:1–11CrossRef Moore T, Morrissey J (2014) Lifecycle costing sensitivities for zero energy housing in Melbourne, Australia. Energy Build 79:1–11CrossRef
Zurück zum Zitat Morcous G, Lounis Z (2005) Maintenance optimization of infrastructure networks using genetic algorithms. Autom Constr 14:129–142CrossRef Morcous G, Lounis Z (2005) Maintenance optimization of infrastructure networks using genetic algorithms. Autom Constr 14:129–142CrossRef
Zurück zum Zitat Muench S, Guenther E (2013) A systematic review of bioenergy life cycle assessments. Appl Energ 112:257–273CrossRef Muench S, Guenther E (2013) A systematic review of bioenergy life cycle assessments. Appl Energ 112:257–273CrossRef
Zurück zum Zitat Muller S, Lesage P, Ciroth A et al (2014) The application of the pedigree approach to the distributions foreseen in ecoinvent v3. Int J Life Cycle Assess. doi:10.1007/s11367-014-0759-5 Muller S, Lesage P, Ciroth A et al (2014) The application of the pedigree approach to the distributions foreseen in ecoinvent v3. Int J Life Cycle Assess. doi:10.​1007/​s11367-014-0759-5
Zurück zum Zitat Nachtmann H, Needy KL (2003) Methods for handling uncertainty in activity-based costing systems. Eng Econ 48:259–282CrossRef Nachtmann H, Needy KL (2003) Methods for handling uncertainty in activity-based costing systems. Eng Econ 48:259–282CrossRef
Zurück zum Zitat Nilsen T, Aven T (2003) Models and model uncertainty in the context of risk analysis. Reliab Eng Syst Saf 79:309–317CrossRef Nilsen T, Aven T (2003) Models and model uncertainty in the context of risk analysis. Reliab Eng Syst Saf 79:309–317CrossRef
Zurück zum Zitat Noori M, Tatari O, Nam B et al (2014) A stochastic optimization approach for the selection of reflective cracking mitigation techniques. Transport Res A: Pol 69:367–378 Noori M, Tatari O, Nam B et al (2014) A stochastic optimization approach for the selection of reflective cracking mitigation techniques. Transport Res A: Pol 69:367–378
Zurück zum Zitat Ostermeyer Y, Wallbaum H, Reuter F (2013) Multidimensional Pareto optimization as an approach for site-specific building refurbishment solutions applicable for life cycle sustainability assessment. Int J Life Cycle Assess 18:1762–1779CrossRef Ostermeyer Y, Wallbaum H, Reuter F (2013) Multidimensional Pareto optimization as an approach for site-specific building refurbishment solutions applicable for life cycle sustainability assessment. Int J Life Cycle Assess 18:1762–1779CrossRef
Zurück zum Zitat Pappenberger F, Beven KJ (2006) Ignorance is bliss: or seven reasons not to use uncertainty analysis: OPINION. Water Resour Res 42:n/a–n/a. doi: 10.1029/2005WR004820 Pappenberger F, Beven KJ (2006) Ignorance is bliss: or seven reasons not to use uncertainty analysis: OPINION. Water Resour Res 42:n/a–n/a. doi: 10.​1029/​2005WR004820
Zurück zum Zitat Park CS, Sharp-Bette GP (1990) Advanced engineering economics. Wiley, New York, US-NY Park CS, Sharp-Bette GP (1990) Advanced engineering economics. Wiley, New York, US-NY
Zurück zum Zitat Patra AP, Söderholm P, Kumar U (2009) Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration. Proc Inst Mech Eng PtF: J Rail Rapid Transit 223:285–293CrossRef Patra AP, Söderholm P, Kumar U (2009) Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration. Proc Inst Mech Eng PtF: J Rail Rapid Transit 223:285–293CrossRef
Zurück zum Zitat Rabl A (1985) Optimizing investment levels for energy conservation: Individual versus social perspective and the role of uncertainty. Energy Econ 7:259–264CrossRef Rabl A (1985) Optimizing investment levels for energy conservation: Individual versus social perspective and the role of uncertainty. Energy Econ 7:259–264CrossRef
Zurück zum Zitat Reap J, Roman F, Duncan S, Bras B (2008) A survey of unresolved problems in life cycle assessment. Part 2: impact assessment and interpretation. Int J Life Cycle Assess 13:374–388CrossRef Reap J, Roman F, Duncan S, Bras B (2008) A survey of unresolved problems in life cycle assessment. Part 2: impact assessment and interpretation. Int J Life Cycle Assess 13:374–388CrossRef
Zurück zum Zitat Reich MC (2005) Economic assessment of municipal waste management systems—case studies using a combination of life cycle assessment (LCA) and life cycle costing (LCC). J Clean Prod 13:253–263CrossRef Reich MC (2005) Economic assessment of municipal waste management systems—case studies using a combination of life cycle assessment (LCA) and life cycle costing (LCC). J Clean Prod 13:253–263CrossRef
Zurück zum Zitat Robert F, Gosselin L (2014) New methodology to design ground coupled heat pump systems based on total cost minimization. Appl Therm Eng 62:481–491CrossRef Robert F, Gosselin L (2014) New methodology to design ground coupled heat pump systems based on total cost minimization. Appl Therm Eng 62:481–491CrossRef
Zurück zum Zitat Ross S, Evans D, Webber M (2002) How LCA studies deal with uncertainty. Int J Life Cycle Assess 7:47–52CrossRef Ross S, Evans D, Webber M (2002) How LCA studies deal with uncertainty. Int J Life Cycle Assess 7:47–52CrossRef
Zurück zum Zitat Saassouh B, Lounis Z (2012) Probabilistic modeling of chloride-induced corrosion in concrete structures using first- and second-order reliability methods. Cement Concrete Comp 34:1082–1093CrossRef Saassouh B, Lounis Z (2012) Probabilistic modeling of chloride-induced corrosion in concrete structures using first- and second-order reliability methods. Cement Concrete Comp 34:1082–1093CrossRef
Zurück zum Zitat Schau EM, Traverso M, Lehmann A, Finkbeiner M (2011) Life cycle costing in sustainability assessment—a case study of remanufactured alternators. Sustainability 3:2268–2288CrossRef Schau EM, Traverso M, Lehmann A, Finkbeiner M (2011) Life cycle costing in sustainability assessment—a case study of remanufactured alternators. Sustainability 3:2268–2288CrossRef
Zurück zum Zitat Schmidt W-P (2003) Life cycle costing as part of design for environment environmental business cases. Int J Life Cycle Assess 8:167–174CrossRef Schmidt W-P (2003) Life cycle costing as part of design for environment environmental business cases. Int J Life Cycle Assess 8:167–174CrossRef
Zurück zum Zitat Seuring S, Müller M (2008) From a literature review to a conceptual framework for sustainable supply chain management. J Clean Prod 16:1699–1710CrossRef Seuring S, Müller M (2008) From a literature review to a conceptual framework for sustainable supply chain management. J Clean Prod 16:1699–1710CrossRef
Zurück zum Zitat Silvestre J, Lasvaux S, Hodková J et al (2015) NativeLCA—a systematic approach for the selection of environmental datasets as generic data: application to construction products in a national context. Int J Life Cycle Assess 20:731–750CrossRef Silvestre J, Lasvaux S, Hodková J et al (2015) NativeLCA—a systematic approach for the selection of environmental datasets as generic data: application to construction products in a national context. Int J Life Cycle Assess 20:731–750CrossRef
Zurück zum Zitat Simões C, Costa Pinto L, Simoes R, Bernardo CA (2013) Integrating environmental and economic life cycle analysis in product development: a material selection case study. Int J Life Cycle Assess 18:1734–1746CrossRef Simões C, Costa Pinto L, Simoes R, Bernardo CA (2013) Integrating environmental and economic life cycle analysis in product development: a material selection case study. Int J Life Cycle Assess 18:1734–1746CrossRef
Zurück zum Zitat Singh D, Tiong RLK (2005) Development of life cycle costing framework for highway bridges in Myanmar. Int J Project Manage 23:37–44CrossRef Singh D, Tiong RLK (2005) Development of life cycle costing framework for highway bridges in Myanmar. Int J Project Manage 23:37–44CrossRef
Zurück zum Zitat Srivastava AK, Nema AK (2012) Fuzzy parametric programming model for multi-objective integrated solid waste management under uncertainty. Expert Syst Appl 39:4657–4678CrossRef Srivastava AK, Nema AK (2012) Fuzzy parametric programming model for multi-objective integrated solid waste management under uncertainty. Expert Syst Appl 39:4657–4678CrossRef
Zurück zum Zitat Stamford L, Azapagic A (2014) Life cycle sustainability assessment of UK electricity scenarios to 2070. Energ Sust Dev 23:194–211CrossRef Stamford L, Azapagic A (2014) Life cycle sustainability assessment of UK electricity scenarios to 2070. Energ Sust Dev 23:194–211CrossRef
Zurück zum Zitat Sterner E (2000) Life-cycle costing and its use in the Swedish building sector. Build Res Inf 28:387–393CrossRef Sterner E (2000) Life-cycle costing and its use in the Swedish building sector. Build Res Inf 28:387–393CrossRef
Zurück zum Zitat Swarr TE, Hunkeler D, Klöpffer W et al (2011) Environmental life cycle costing: a code of practice. SETAC, Pensacola, US-FL Swarr TE, Hunkeler D, Klöpffer W et al (2011) Environmental life cycle costing: a code of practice. SETAC, Pensacola, US-FL
Zurück zum Zitat Tähkämö L, Ylinen A, Puolakka M, Halonen L (2012) Life cycle cost analysis of three renewed street lighting installations in Finland. Int J Life Cycle Assess 17:154–164CrossRef Tähkämö L, Ylinen A, Puolakka M, Halonen L (2012) Life cycle cost analysis of three renewed street lighting installations in Finland. Int J Life Cycle Assess 17:154–164CrossRef
Zurück zum Zitat Terzi S, Serin S (2014) Planning maintenance works on pavements through ant colony optimization. Neural Comput & Applic 25:143–153CrossRef Terzi S, Serin S (2014) Planning maintenance works on pavements through ant colony optimization. Neural Comput & Applic 25:143–153CrossRef
Zurück zum Zitat Truffer B, Störmer E, Maurer M, Ruef A (2010) Local strategic planning processes and sustainability transitions in infrastructure sectors. Environ Policy Gov 20:258–269CrossRef Truffer B, Störmer E, Maurer M, Ruef A (2010) Local strategic planning processes and sustainability transitions in infrastructure sectors. Environ Policy Gov 20:258–269CrossRef
Zurück zum Zitat Upadhyay TP, Shahi C, Leitch M, Pulkki R (2012) Economic feasibility of biomass gasification for power generation in three selected communities of northwestern Ontario, Canada. Energ Policy 44:235–244CrossRef Upadhyay TP, Shahi C, Leitch M, Pulkki R (2012) Economic feasibility of biomass gasification for power generation in three selected communities of northwestern Ontario, Canada. Energ Policy 44:235–244CrossRef
Zurück zum Zitat Wang E, Shen Z (2013) A hybrid data quality indicator and statistical method for improving uncertainty analysis in LCA of complex system—application to the whole-building embodied energy analysis. J Clean Prod 43:166–173CrossRef Wang E, Shen Z (2013) A hybrid data quality indicator and statistical method for improving uncertainty analysis in LCA of complex system—application to the whole-building embodied energy analysis. J Clean Prod 43:166–173CrossRef
Zurück zum Zitat Weidema BP, Wesnæs MS (1996) Data quality management for life cycle inventories—an example of using data quality indicators. J Clean Prod 4:167–174CrossRef Weidema BP, Wesnæs MS (1996) Data quality management for life cycle inventories—an example of using data quality indicators. J Clean Prod 4:167–174CrossRef
Zurück zum Zitat Weiler H (1965) The use of the incomplete beta functions for prior distributions inbinomial sampling. Technometrics 7(3):335–347 Weiler H (1965) The use of the incomplete beta functions for prior distributions inbinomial sampling. Technometrics 7(3):335–347
Zurück zum Zitat Wen YK, Kang YJ (2001) Minimum building life-cycle cost design criteria II: applications. J Struct Eng 127:338–346CrossRef Wen YK, Kang YJ (2001) Minimum building life-cycle cost design criteria II: applications. J Struct Eng 127:338–346CrossRef
Zurück zum Zitat Williams ED, Weber CL, Hawkins TR (2009) Hybrid framework for managing uncertainty in life cycle inventories. J Ind Ecol 13:928–944CrossRef Williams ED, Weber CL, Hawkins TR (2009) Hybrid framework for managing uncertainty in life cycle inventories. J Ind Ecol 13:928–944CrossRef
Zurück zum Zitat Xu Y, Elgh F, Erkoyuncu JA et al (2012) Cost engineering for manufacturing: current and future research. Int J Comput Integr Manuf 25:300–314CrossRef Xu Y, Elgh F, Erkoyuncu JA et al (2012) Cost engineering for manufacturing: current and future research. Int J Comput Integr Manuf 25:300–314CrossRef
Zurück zum Zitat Zakeri B, Syri S (2015) Electrical energy storage systems: a comparative life cycle cost analysis. Renew Sust Energ Rev 42:569–596CrossRef Zakeri B, Syri S (2015) Electrical energy storage systems: a comparative life cycle cost analysis. Renew Sust Energ Rev 42:569–596CrossRef
Zurück zum Zitat Zamagni A (2012) Life cycle sustainability assessment. Int J Life Cycle Assess 17:373–376CrossRef Zamagni A (2012) Life cycle sustainability assessment. Int J Life Cycle Assess 17:373–376CrossRef
Zurück zum Zitat Zamagni A, Masoni P, Buttol P et al (2012) Finding life cycle assessment research direction with the aid of meta-analysis. J Ind Ecol 16:S39–S52CrossRef Zamagni A, Masoni P, Buttol P et al (2012) Finding life cycle assessment research direction with the aid of meta-analysis. J Ind Ecol 16:S39–S52CrossRef
Zurück zum Zitat Zayed TM, Chang L-M, Fricker JD (2002) Life-cycle cost based maintenance plan for steel bridge protection systems. J Perform Constr Facil 16:55–62CrossRef Zayed TM, Chang L-M, Fricker JD (2002) Life-cycle cost based maintenance plan for steel bridge protection systems. J Perform Constr Facil 16:55–62CrossRef
Zurück zum Zitat Zhang Y, Liao R, Yang L et al (2014) A cost-effectiveness assessment model using grey correlation analysis for power transformer selection based on life cycle cost. Kybernetes 43:5–23CrossRef Zhang Y, Liao R, Yang L et al (2014) A cost-effectiveness assessment model using grey correlation analysis for power transformer selection based on life cycle cost. Kybernetes 43:5–23CrossRef
Zurück zum Zitat Zhu Y, Tao Y, Rayegan R (2012) A comparison of deterministic and probabilistic life cycle cost analyses of ground source heat pump (GSHP) applications in hot and humid climate. Energy Build 55:312–321CrossRef Zhu Y, Tao Y, Rayegan R (2012) A comparison of deterministic and probabilistic life cycle cost analyses of ground source heat pump (GSHP) applications in hot and humid climate. Energy Build 55:312–321CrossRef
Metadaten
Titel
Uncertainty in life cycle costing for long-range infrastructure. Part II: guidance and suitability of applied methods to address uncertainty
verfasst von
Christoph Scope
Patrick Ilg
Stefan Muench
Edeltraud Guenther
Publikationsdatum
05.04.2016
Verlag
Springer Berlin Heidelberg
Erschienen in
The International Journal of Life Cycle Assessment / Ausgabe 8/2016
Print ISSN: 0948-3349
Elektronische ISSN: 1614-7502
DOI
https://doi.org/10.1007/s11367-016-1086-9

Weitere Artikel der Ausgabe 8/2016

The International Journal of Life Cycle Assessment 8/2016 Zur Ausgabe

POLICIES AND SUPPORT IN RELATION TO LCA

A distance-to-target weighting method for Europe 2020