Skip to main content
Erschienen in: Production Engineering 2/2015

01.04.2015 | Production Management

Criticality analysis of spare parts management: a multi-criteria classification regarding a cross-plant central warehouse strategy

verfasst von: J. Stoll, R. Kopf, J. Schneider, G. Lanza

Erschienen in: Production Engineering | Ausgabe 2/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Today an efficient warehouse and inventory management of spare parts for production machinery is essential for service organizations. Optimal strategies in procurement, stocking and supply play an important role for serviceability in spare parts management. In this context, individual item criticality should be considered, which describes how crucial a spare part is. This paper presents a three-dimensional classification approach for spare parts regarding a cross-plant central warehouse strategy of a service network. The approach uses two dimensions to estimate value and predictability of spare parts with aid of an ABC and XYZ analysis. The third dimension VED analyses a multi-criteria criticality classification and six feasible criteria are identified to describe item criticality. The methodology of the analysis is based on a decision tree, which represents the defined criteria by nodes. In addition, the analytic hierarchy process is used to solve the multi-criteria decision problems at the different nodes of the decision tree. The approach is developed in a research project and evaluation of spare parts is performed based on real inventory and transaction data in cooperation with an industrial company. As a result 15,000 out of 50,000 items could be classified as suitable for central warehousing.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Behmann B (2012) Servicefähigkeit: Eine Methode zur Serviceplanung und simulativen Bestimmung der Servicefähigkeit auf Basis des Ausfallverhaltens von Maschinenkomponenten. Shaker Verlag, Aachen Behmann B (2012) Servicefähigkeit: Eine Methode zur Serviceplanung und simulativen Bestimmung der Servicefähigkeit auf Basis des Ausfallverhaltens von Maschinenkomponenten. Shaker Verlag, Aachen
2.
Zurück zum Zitat Lanza G, Behmann B (2011) Advanced steps to optimize the serviceability. Advances in production management systems (APMS), 26.09.2011–28.09.2011, Stavanger. Norwegen. Heidelberg, Springer, New York Lanza G, Behmann B (2011) Advanced steps to optimize the serviceability. Advances in production management systems (APMS), 26.09.2011–28.09.2011, Stavanger. Norwegen. Heidelberg, Springer, New York
3.
Zurück zum Zitat Biedermann H (2008) Ersatzteilmanagement: Effiziente Ersatzteillogistik für Industrieunternehmen, 2nd edn. Springer, Berlin Biedermann H (2008) Ersatzteilmanagement: Effiziente Ersatzteillogistik für Industrieunternehmen, 2nd edn. Springer, Berlin
4.
Zurück zum Zitat Niggeschmidt S (2010) Ausfallgerechte Ersatzteilbereitstellung im Maschinen- und Anlagenbau mittels lastabhängiger Lebensdauerprognose. Shaker Verlag, Aachen Niggeschmidt S (2010) Ausfallgerechte Ersatzteilbereitstellung im Maschinen- und Anlagenbau mittels lastabhängiger Lebensdauerprognose. Shaker Verlag, Aachen
5.
Zurück zum Zitat Oeldorf G, Olfert K (2013) Material-Logistik. Olfert K (ed) Kompendium der praktischen Betriebswirtschaft. 13th edition. NWB Verlag, Heme Oeldorf G, Olfert K (2013) Material-Logistik. Olfert K (ed) Kompendium der praktischen Betriebswirtschaft. 13th edition. NWB Verlag, Heme
6.
Zurück zum Zitat Pawellek G (2013) Integrierte Instandhaltung und Ersatzteillogistik: Vorgehensweisen, Methoden, Tools. Springer, HeidelbergCrossRef Pawellek G (2013) Integrierte Instandhaltung und Ersatzteillogistik: Vorgehensweisen, Methoden, Tools. Springer, HeidelbergCrossRef
7.
Zurück zum Zitat Braglia M, Grassi A, Montanari R (2004) Multi-attribute classification method for spare parts inventory management. J Qual Maint Eng 10(1):55–65CrossRef Braglia M, Grassi A, Montanari R (2004) Multi-attribute classification method for spare parts inventory management. J Qual Maint Eng 10(1):55–65CrossRef
8.
Zurück zum Zitat Syntetos AA, Keyes M, Babai MZ, (2008) Demand categorisation in a European spare parts logistics network. Int J Oper Prod Manag 29(3):292–316. Methoden, Tools. Springer, Heidelberg Syntetos AA, Keyes M, Babai MZ, (2008) Demand categorisation in a European spare parts logistics network. Int J Oper Prod Manag 29(3):292–316. Methoden, Tools. Springer, Heidelberg
9.
Zurück zum Zitat Molenaers A, Baets H, Pintelon L, Waeyenbergh G (2011) Criticality classification of spare parts: a case study. Int J Prod Econ 140:570–578CrossRef Molenaers A, Baets H, Pintelon L, Waeyenbergh G (2011) Criticality classification of spare parts: a case study. Int J Prod Econ 140:570–578CrossRef
10.
Zurück zum Zitat Matyas K (2013) Instandhaltungslogistik: Qualität und Produktivität steigern, 5th edn. Hanser Verlag, MünchenCrossRef Matyas K (2013) Instandhaltungslogistik: Qualität und Produktivität steigern, 5th edn. Hanser Verlag, MünchenCrossRef
11.
Zurück zum Zitat Flores BE, Whybark DC (1987) Implementing multiple criteria ABC analysis. J Oper Manag 7(1 and 2):79–85CrossRef Flores BE, Whybark DC (1987) Implementing multiple criteria ABC analysis. J Oper Manag 7(1 and 2):79–85CrossRef
12.
Zurück zum Zitat Chu C-W, Liang G-S, Liao C-T (2008) Controlling inventory by combining ABC analysis and fuzzy classification. Comput Ind Eng 55:841–851CrossRef Chu C-W, Liang G-S, Liao C-T (2008) Controlling inventory by combining ABC analysis and fuzzy classification. Comput Ind Eng 55:841–851CrossRef
13.
Zurück zum Zitat Ramanathan R (2004) ABC inventory classification with multiple-criteria using weighted linear optimization. Comput Oper Res 33:695–700CrossRef Ramanathan R (2004) ABC inventory classification with multiple-criteria using weighted linear optimization. Comput Oper Res 33:695–700CrossRef
14.
Zurück zum Zitat Partovi FY, Anandarajan M (2001) Classifying inventory using an artificial neural network approach. Comput Ind Eng 41:389–404CrossRef Partovi FY, Anandarajan M (2001) Classifying inventory using an artificial neural network approach. Comput Ind Eng 41:389–404CrossRef
15.
Zurück zum Zitat Ernst R, Cohen MA (1990) Operations related groups (ORGs): a clustering procedure for production/inventory systems. J Oper Manag 9(4):574–598CrossRef Ernst R, Cohen MA (1990) Operations related groups (ORGs): a clustering procedure for production/inventory systems. J Oper Manag 9(4):574–598CrossRef
16.
Zurück zum Zitat De Almeida AT (2000) Multicriteria decision making on maintenance: spares and contracts planning. Eur J Oper Res 129:235–241CrossRef De Almeida AT (2000) Multicriteria decision making on maintenance: spares and contracts planning. Eur J Oper Res 129:235–241CrossRef
17.
Zurück zum Zitat Petrović D, Petrović R (1992) SPARTA II: further development in an expert system for advising on stocks of spare parts. Int J Prod Econ 24:291–300CrossRef Petrović D, Petrović R (1992) SPARTA II: further development in an expert system for advising on stocks of spare parts. Int J Prod Econ 24:291–300CrossRef
18.
Zurück zum Zitat Huiskonen J (2001) Maintenance spare parts logistics: special characteristics and strategic choices. Int J Prod Econ 71:125–133CrossRef Huiskonen J (2001) Maintenance spare parts logistics: special characteristics and strategic choices. Int J Prod Econ 71:125–133CrossRef
19.
Zurück zum Zitat Paaki J, Huiskonen J, Pirttilä T (2010) Improving global spare parts distribution chain performance through part categorization: a case study. Int J Prod Econ 133:164–171 Paaki J, Huiskonen J, Pirttilä T (2010) Improving global spare parts distribution chain performance through part categorization: a case study. Int J Prod Econ 133:164–171
20.
Zurück zum Zitat Dekker R, Kleijn MJ, de Rooij PJ (1996) A spare parts stocking policy based on equipment criticality. Int J Prod Econ 56–57:69–77 Dekker R, Kleijn MJ, de Rooij PJ (1996) A spare parts stocking policy based on equipment criticality. Int J Prod Econ 56–57:69–77
21.
Zurück zum Zitat Porras E, Dekker R (2006) An inventory control system for spare parts at a refinery: an empirical comparison of different re-order point methods. Eur J Oper Res 184:101–132CrossRef Porras E, Dekker R (2006) An inventory control system for spare parts at a refinery: an empirical comparison of different re-order point methods. Eur J Oper Res 184:101–132CrossRef
22.
Zurück zum Zitat Botter R, Fortuin L (2000) Stocking strategy for service parts—a case study. Int J Oper Prod Manag 20(6):656–674CrossRef Botter R, Fortuin L (2000) Stocking strategy for service parts—a case study. Int J Oper Prod Manag 20(6):656–674CrossRef
23.
Zurück zum Zitat Bošnjaković M (2010) Multicriteria inventory model for spare parts. Tech Gaz 17(4):499–504 Bošnjaković M (2010) Multicriteria inventory model for spare parts. Tech Gaz 17(4):499–504
24.
Zurück zum Zitat Gajpal PP, Ganesh LS, Rajendran C (1994) Criticality analysis of spare parts using the analytic hierarchy process. Int J Prod Econ 35:293–297CrossRef Gajpal PP, Ganesh LS, Rajendran C (1994) Criticality analysis of spare parts using the analytic hierarchy process. Int J Prod Econ 35:293–297CrossRef
25.
Zurück zum Zitat Sharaf MA, Helmy HA (2001) A classification model for inventory management of spare parts. In: Proceedings of the 7th international conference on production, industrial engineering, design and control, p 375–82 Sharaf MA, Helmy HA (2001) A classification model for inventory management of spare parts. In: Proceedings of the 7th international conference on production, industrial engineering, design and control, p 375–82
26.
Zurück zum Zitat Knut A (2005) Planung und Betrieb von Logistiknetzwerken: Unternehmensübergreifendes supply chain management; mit 27 Tabellen, 2nd edn. Springer Verlag, Berlin Knut A (2005) Planung und Betrieb von Logistiknetzwerken: Unternehmensübergreifendes supply chain management; mit 27 Tabellen, 2nd edn. Springer Verlag, Berlin
27.
Zurück zum Zitat Bose DC (2006) Inventory management. Prentice-Hall of India Private Limited, New Delhi Bose DC (2006) Inventory management. Prentice-Hall of India Private Limited, New Delhi
28.
Zurück zum Zitat Schawel C, Billing F (2012) Top 100 management tools: Das wichtigste Buch eines Managers: Von ABC-Analyse bis Zielvereinbarung, 4th edn. Springer Gabler Verlag, Wiesbaden Schawel C, Billing F (2012) Top 100 management tools: Das wichtigste Buch eines Managers: Von ABC-Analyse bis Zielvereinbarung, 4th edn. Springer Gabler Verlag, Wiesbaden
29.
Zurück zum Zitat Skinner DC (2001) Introduction to decision analysis: a practitioner’s guide to improving decision quality, 2nd edn. Probabilistic Publishing, Gainesville Skinner DC (2001) Introduction to decision analysis: a practitioner’s guide to improving decision quality, 2nd edn. Probabilistic Publishing, Gainesville
30.
Zurück zum Zitat Harker PT (1989) The art and science of decision making: the analytic hierarchy process. In: Golden BL, Wasil EA, Harker PT (eds) The analytic hierarchy process: applications and studies. Springer, New York, pp 3–36CrossRef Harker PT (1989) The art and science of decision making: the analytic hierarchy process. In: Golden BL, Wasil EA, Harker PT (eds) The analytic hierarchy process: applications and studies. Springer, New York, pp 3–36CrossRef
31.
Zurück zum Zitat Saaty TL (2008) Decision making with the analytic hierarchy process. Int J Serv Sci 1(1):83–98MathSciNet Saaty TL (2008) Decision making with the analytic hierarchy process. Int J Serv Sci 1(1):83–98MathSciNet
32.
Zurück zum Zitat Saaty TL (1990) How to make a decision: the analytic hierarchy process. Eur J Oper Res 48:9–26CrossRefMATH Saaty TL (1990) How to make a decision: the analytic hierarchy process. Eur J Oper Res 48:9–26CrossRefMATH
33.
Zurück zum Zitat Linkov I, Bakr Ramadian A (2004) Comparative risk assessment and environmental decision making. Kluwer Academic Publishers, Dordrecht Linkov I, Bakr Ramadian A (2004) Comparative risk assessment and environmental decision making. Kluwer Academic Publishers, Dordrecht
Metadaten
Titel
Criticality analysis of spare parts management: a multi-criteria classification regarding a cross-plant central warehouse strategy
verfasst von
J. Stoll
R. Kopf
J. Schneider
G. Lanza
Publikationsdatum
01.04.2015
Verlag
Springer Berlin Heidelberg
Erschienen in
Production Engineering / Ausgabe 2/2015
Print ISSN: 0944-6524
Elektronische ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-015-0602-2

Weitere Artikel der Ausgabe 2/2015

Production Engineering 2/2015 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.