Determination of potential failure Initiation Time using Cumulative Sum Chart

https://doi.org/10.1016/j.ifacol.2016.11.008Get rights and content

Abstract:

Hard competition forces companies to reduce uncertainty in production planning through, e.g. reducing the probability of failures. In this paper, more accurate data analysis through reducing randomness in vibration measurements is introduced. Quality control tool Cumulative Sum (Cusum) Chart is adapted for monitoring variation in vibration level to determine the time of potential failure initiation. The result confirms the possibility of reducing false alarms arise due to randomness in vibration signals. The major conclusion; applying Cusum chart it is possible to determine the time of initiation of a potential failure for follow up its progression and accurate planning of maintenance.

Keywords

Condition Monitoring
Failure Consequences
Identification of the Time of a Potential Failure Initiation

Cited by (0)