A type-2 fuzzy set model for contractor prequalification

https://doi.org/10.1016/j.autcon.2017.10.003Get rights and content

Highlights

  • Prequalification is a multi-criteria decision making problem involving uncertainty.

  • Interval type-2 fuzzy sets is used for a group version of the problem.

  • It becomes feasible to compute with the ‘footprint of uncertainty’ (FOU).

  • The FOU of each alternative can be compared in the final outcome.

Abstract

Prequalification helps decision makers find the right contractor for the job, which is key to the successful delivery of a construction project. The procedure involves judging the suitability, capability and competency of the contractor on various criteria, using both anecdotal and empirical evidence. The evidence used is often imprecise and subjective, and so is the evaluation and decision making procedure. Type-1 fuzzy sets have been used in the prequalification procedure to handle uncertain information. However, type-1 fuzzy sets are unable to reflect the differences in opinion among experts involved in group decision making. The purpose of this paper is to propose a practical prequalification procedure that uses interval type-2 fuzzy sets to address both linguistic imprecision and differences of opinion. A numerical example shows how the proposed procedure is carried out and the benefits that result compared to a similar procedure using type-1 fuzzy sets.

Introduction

Finding the ‘right’ contractor for a job is important to gain the maximum assurance that the contractor can deliver the project, meet expectations of quality, cost, time, as well as obligations on safety, social and environmental responsibility. The ‘right’ contractor is defined in terms of its capability – the resources, equipment, work methods and processes to perform certain types of work, and competency – the skill at applying capability to a task/problem to obtain a successful outcome. Prequalification enables the decision maker to find the contractor(s) with the right capability and competency for the project based on evidence. The purpose of prequalifying contractors is to filter from a potentially long list of candidates down to a shorter list, where members of the latter list have the best potential of bidding, undertaking and completing the project. However, prequalification is carried out at the early stage of the project development cycle when information about the project is not fully detailed or precise, and there are many alternative candidates for the right candidate. Furthermore, prequalification is often done under tight constraints of time and resources. Still, it is important for the owner to narrow the field of candidates and focus the search on a few strong prospects even on the basis of imprecise information. It may also be required to rank the contractors based on how well they meet the selection criteria.

Prequalification can be characterized as a Multi-criteria Decision Making (MCDM) problem. This problem has been addressed from different perspectives, using different computational methods. Holt [1] published a review of ‘contractor selection’ models described in the research literature over two decades. It was found that most of the models were deterministic in nature, i.e. information uncertainty was not explicitly accounted for. Preferred methods of research included `system interrogation`, rank order analysis and the use of Likert scales. This indicates that relatively coarse methods are used to encode expert knowledge and preferences. The study also called into question the reliability and longevity of the selection criteria used, as well as the usefulness of the models proposed due to their complexity. Nevertheless, the quest for better models that are easy to use and maintain must continue. We review a few key papers, each representative of a particular approach to the derivation of a MCDM model for contractor prequalification. The purpose is to illustrate some of the prominent approaches, and highlight the way in which key issues are addressed.

Russell and Skibniewski [2] proposed the logic of a general procedure involving selection criteria, the purpose of which was to rank contractors on their suitability for the project. Russell and Skibniewski [3] later proposed a computerized program, namely Qualifier-1 to facilitate the prequalification decision making. However, in this model, a user was required to have the expertise to do a subjective evaluation of the contractor based on a scale from 1 to 10. The subjectivity of this evaluation was addressed by further development in Qualifier-2 [4] where the MCDM procedure was presented as a hierarchical tree of composite and (elemental) decision factors, with the use of heuristic rules involving the decision factors to address the prequalification problem.

Another notable approach for the contractor prequalification problem is the use of Artificial Neural Networks [5] to learn the association between the data presented as selection criteria and the binary outcome of the prequalification decision. If data is plentiful, the ANN-based decision model can learn the non-linear mapping between criteria and decision, even in the face of uncertainty associated with the input data. Ng [6] encoded the experience on past prequalification decisions directly using Case-based Reasoning (CBR). Exemplar cases can capture more concisely the association between the performance on selection criteria, and the prequalification decision. There is no need to compile a large amount of training data, unlike the case with ANNs.

Sönmez et al. [7] approached the contractor prequalification problem as one involving reasoning from evidence. Rather than being a drawback, they combined partial evidence to derive reasonable and plausible conclusions using Dempster-Shafer Theory. One of the advantages of this model was that it could handle both quantitative and qualitative evidence within the same reasoning framework. Ever since their introduction by Zadeh [8], fuzzy sets have proven to be a popular approach to encode and compute with uncertain data, whether arising from measurement error, lack of details, or the use of imprecise linguistic terms in the decision rules. Lam et al. [9] describe the use of fuzzy sets to encode fuzzy rules for a Fuzzy Neural Network in order to solve the contractor prequalification problem. It was found that the use of fuzzy sets improves both the model efficiency (as measured by the R2 error) and the mean absolute percentage error, compared to a general feedforward neural network trained on the same data.

Group decision making and uncertainty are taken into account by modelling the inherent uncertainty involved when different experts are involved. Each expert in the group has to evaluate both the importance (weights) of the different criteria, and the performance of a contractor on the criteria. Fuzzy sets were used to model the uncertainty in both the criteria weights and the performance scores. Nguyen [10], for the first time, used these sets in order to build a contractor selection model. In the proposed model, three major criteria: - cost, presentation of bid information, and past experience were included. Plebankiewicz [11] presented a prequalification procedure based on fuzzy sets in which different objectives of owner such as time, cost and quality of works were considered. Imprecision and ambiguity in the prequalification procedure was addressed by the use of linguistic variables in the contractor prequalification model [12].

Jaskowski et al. [13] describe a model in which the decision for contractor prequalification is made by making pairwise comparisons between the candidates using the Analytic Hierarchy Process (AHP) in a group decision making procedure. Fuzzy sets were used to define the criteria weights elicited by aggregating the judgment of several decision makers. It was found that the fuzzy approach resulted in improved quality of criteria prioritization. Hosny et al. [14] propose the use of fuzzy sets in the pairwise comparison stage of the AHP when attempting to assess the relative importance of the criteria for contractor prequalification. Nasab [15] also advocated the use of fuzzy sets and the AHP procedure to elicit the relative importance of the prequalification criteria. The weighted criteria are then used in a TOPSIS-like procedure to determine the candidate closest to the ideal solution. Nieto-Morote and Ruz-Vila [16] also proposed the use of fuzzy sets and linguistic terms in a TOPSIS-like procedure for prequalifying contractors, and proposed a way to handle inconsistencies in the preference relationship between pairs of alternatives.

Plebankiewicz [17] presented a statistical survey of the methods and criteria of contractor selection used by public and private clients in the Polish building industry. The results indicated that public clients were using only one criterion in most of the restricted tenders in order to qualify the contractors; a significant percentage of private clients did not have a prequalification procedure.

Plebankiewicz [18] suggests a pre-evaluation screening step in the prequalification procedure where: (1) minimum thresholds are defined for some key criteria (especially financial and technical capability); (2) any contractor that fails to meet the minimum threshold is immediately eliminated from further consideration. Those that pass this screening step are evaluated in more detail to determine a suitability score with which they can be ranked. Plebankiewicz [19] modeled decision-making processes of contractor and client in bidding procedures using fuzzy sets. Alhumaidi [20] formulated a model which allowed group decision making in the prequalification problem. Data was encoded using fuzzy sets, and the fuzzy weighted average of the responses of the different experts was used to determine the final contractor suitability and ranking.

From the review of the literature discussed above, it is concluded that the use of fuzzy sets to encode information uncertainty in a MCDM model generally improves the performance of the model. It makes the application of human expert knowledge easier since linguistic terms are used. However, much of the research using fuzzy sets cited above is based on Type-1 Fuzzy Sets (T1FSs) with crisp membership functions. Although a piece of measured data can belong to more than one fuzzy set (with different degrees of membership for each set), T1FSs cannot accommodate the situation when the membership value of the data itself is uncertain. This situation arises when the evaluation and the decision are made by a group rather than a single person (group MCDM). Thus, the results obtained from using T1FSs for a group MCDM problem like contractor prequalification can be unreliable. Also, there is uncertainty about the setting of thresholds for concepts and the activation of rules as more than one rule (and consequence) could be applicable. These new sources of information uncertainty can be more efficiently represented using a higher-level type-2 fuzzy set (described in more detail later). In spite of the widespread use of T1FSs in MCDM, the use of general type-2 fuzzy sets is not as common. Previously, it had been computationally onerous to maintain the many degrees of possibility associated with maintaining this level of information using T2FSs. However, with the introduction of a special type-2 fuzzy set, namely Interval Type-2 Fuzzy Sets (IT2FSs), such computations are now possible, even using software run on general purpose desktop computers. Therefore, it is not necessary to sacrifice information content for computational expediency. It is the intention of this paper to present a group MCDM model which incorporates the use of IT2FSs to encode information uncertainty. IT2FSs efficiently model the uncertainties inherent in group decision making for the contractor prequalification problem, and requires less computational effort than general type-2 fuzzy sets. A numerical example demonstrates its application and offers a comparison with the result from T1FSs. Also, Interval Weighted Average (IWA) method is used as a MCDM method. Since hybridization of IT2FSs with any MCDM method increases the complexity of the calculations, the IWA approach, which is simpler and needs less calculation than other approaches such as AHP, TOPSIS, etc., makes it computationally tractable to compute with T2FSs for the prequalification problem. In summary, the paper describes how to encode uncertainty in a group decision making problem like contractor prequalification using IT2FS, and to efficiently compute results without sacrificing information along the way.

Section snippets

The role of information in contractor prequalification

In the contractor prequalification problem, information about the problem is collected about: (1) the requirements of the project, and owner; (2) evidence on the characteristics of the contractor relevant to the different criteria used in the prequalification exercise; (3) the importance (weight) of the criteria; (4) rubrics and scales used to evaluate performance based on the evidence; and (5) rules to draw implications from the evidence.

Many studies have presented lists of criteria that can

General prequalification procedure

Generally, in most of the countries, contractors are classified into different eligibility levels based on a few general criteria (such as the size of previous projects). Even so, for important projects, contractors that express interest in responding to a tender must still be prequalified based on more comprehensive criteria. There is agreement on the general procedure to prequalify contractors. Fig. 1 shows the high level steps in a generic contractor prequalification procedure.

  • 1.

    Selection of

Type-1 fuzzy sets

Fuzzy sets [22] is the most frequently used method to implement plausible reasoning associated with linguistic imprecision. Encoding uncertainty is beneficial in several ways. First, it leads to more robust logic systems unlike decision models that depend on crisp definitions of concepts and thresholds for correct operation. Fuzzy logic systems are more resilient to uncertainty in their inputs. Secondly, it is easier to encode, verify and validate the expertise of experts encoded as inference

Interval type-2 fuzzy sets

Another source of uncertainty is when the membership of x in a fuzzy set is itself uncertain. This may arise when a group of experts are asked about the membership of the fuzzy sets. Type-2 fuzzy sets (T2FS) can be used to encode uncertainty associated with the membership function itself. When type-2 fuzzy sets are involved in the inference procedure, the operations on fuzzy sets must again be defined properly. A common situation when the membership function is itself ambiguous arises when

Proposed prequalification procedure using type-2 fuzzy sets

The general contractor prequalification procedure (depicted previously in Fig. 1) has been modified to incorporate the handling of imprecise information and multiple expert opinions using IT2FS.

  • 1.

    Selection of criteria from a larger list, customized to the requirements of the client and the project.

  • 2.

    [Modified] Determining the importance of the criteria and the weight to be attached. In the case of fuzzy logic systems, linguistic terms are used to describe the degree of importance. A 7-term

Example

A numerical example is presented to illustrate how the prequalification procedure can be employed, and how the steps and computations in the modified generic procedure are carried out. The example involves 6 contractors invited to tender on a project. The opinions of ten experts were sought on the suitability of the contractors through a survey questionnaire. The number of contractors in the example has been kept small in order to enhance the clarity of presentation in the following tables and

Conclusion

Prequalification is an important part of the process for finding the right contractor for the project. As a MCDM problem, it has been richly addressed in the literature using a variety of methods. All methods involve making judgements about suitability and performance on selected criteria based on the evidence presented.

Fuzzy sets have been extensively used, in conjunction with a MCDM method, to address the imprecision and subjectivity inherent in any form of human decision making. However,

References (28)

  • J. Russell et al.

    Qualifier-1: contractor prequalification model

    J. Comput. Civ. Eng.

    (1990)
  • J. Russell et al.

    Qualifier-2: knowledge-based system for contractor prequalification

    J. Constr. Eng. Manag.

    (1990)
  • K.C. Lam et al.

    Decision support system for contractor pre-qualification-artificial neural network model

    Eng. Constr. Archit. Manag.

    (2000)
  • M. Sönmez et al.

    Applying evidential reasoning to prequalifying construction contractors

    J. Manag. Eng.

    (2002)
  • Cited by (42)

    • A multicriteria model to select candidates for public contracting using the OPTIONCARDS method

      2022, Automation in Construction
      Citation Excerpt :

      The proposed approach includes the formulation of the multi-attribute model following the TRIDENT contribution and the OptionCard method allowing the estimation of the weights of the criteria in terms of choices between alternatives made by the contracting authority and revealing the relative importance allocated to each weight. The application of this method complies with the two principles already mentioned and avoids subjective and less clear questions to be asked to the decision maker which have been treated by other authors using fuzzy sets as mentioned before [10] [11] [12]. Then, after the elicitation of the weights, the TRIDENT model should be used to estimate the multi-attribute score of each applicant to obtain their ranking.

    • Comprehensive analysis of state-of-the-art contractor selection models in construction environment-A critical review and future call

      2022, Socio-Economic Planning Sciences
      Citation Excerpt :

      Under such criteria, it is hard for a client to analyze the information and such criteria are not credible. Similarly, several other ambiguous criteria are noticed in a few other studies such as record of timely payment to workers [84], past failures [68,69], history of past claims [64,69], salary satisfaction and behavior with staff [72], etc. Furthermore, a long chain of confusion found in many studies such as in understanding performance, experience, and past achievements and mishaps by El-Abbasy et al. [1], Anagnostopoulos and Vavatsikos [38], Taylan et al. [79].

    • Integrating value estimation and simulation for contractor selection

      2020, Automation in Construction
      Citation Excerpt :

      Palaneeswaran and Kumaraswamy [4] develop a model for contractor prequalifications and bid evaluations for design/build projects. Studies have employed various techniques and mechanisms to improve contractor prequalifications including the fuzzy model [6,17], support vector machine model [24], and multiple kernel learning-based decision support model [18]. However, prequalification models are also based on multi-criteria evaluations and, thus, are subject to the same limitations as those of multi-criteria decision-making models.

    View all citing articles on Scopus
    View full text