Robust optimal design of chilled water systems in buildings with quantified uncertainty and reliability for minimized life-cycle cost
Introduction
The building sector is the largest energy consumer in most countries and regions worldwide, especially in the metropolis such as Hong Kong [1], [2], [3]. Building central chilled water systems, which are the major sub-systems in heating, ventilation and air-conditioning (HVAC) systems, accounts for a significant proportion to the total electricity used in buildings [4], [5].
The sizing and selection of chilled water pump systems is one of the most important aspects in determining the energy performance of the HVAC systems [6], [7]. The conventional design of chilled water pump systems, proposed by ASHRAE Handbook [8], mainly concerns the design flow required and design pressure head required. The intersection of the required head and flow on the pump curve should occur close to or perhaps a little to the left of best efficiency point (BEP), which may maintain the pumps operating at high efficiency and thus minimize the electricity cost of operating the pumps [9]. Considering that pumps are only manufactured in certain sizes, selection range between 66% and 115% of design flow at the BEP are suggested [10]. In a central air-conditioning system, the designer tends to use identical pumps in parallel to share the system flow [10]. In addition, a standby or backup pump of equal capacity and pressure installed in parallel to the main pumps is recommended to operate to ensure continuous operation when a pump fails to operate or needs to be maintained [11].
Oversizing of chilled water pump systems, which is a common problem in HVAC fields [12], may result in high capital cost, high operation cost, and increased maintenance problems over the system life-cycle when compared to properly sized systems [9]. Oversizing of pump systems contain the oversizing of design flow and oversizing of design pressure head. Due to the inevitable uncertainty of input parameters (e.g., weather condition, occupancy) on cooling load calculation [13], designers tend to select a larger design cooling capacity than the peak duty (e.g., multiply a safety factor) in order that the design cooling capacity can fulfil the cooling demand for safety [14], [15]. This may result in significant oversizing of cooling capacity and thus the design flow [16]. Based on the design flow rate and actual design information of the chilled water loop, component pressure drop information is utilized to calculate the assumed pump head. Then additional design safety factors are added on the assumed pump head to get the design pump head to allow the changes of system load and to cover unknown or unforeseen pressure drop factors [12]. Sometimes an artificial aging factor (e.g., an extra 15%) is included to account for the decrease in pipe diameter as deposits build up on the inside surfaces of the pipes due to aging [9]. Since part load conditions frequently occur throughout the entire cooling season [17], some engineers think they can grossly oversize a pump system and then use variable speed drives to maintain high efficiency and reduce operation cost during the part load period [18]. However, the capital cost and operation cost are still high while the variable speed drives are used.
Conventional optimal design of building energy systems are typically based on the annual cooling load under the predefined conditions, which is commonly subject to a deterministic model-based simulation [13], [15]. However, many researchers had taken the impacts of uncertainties into account when calculating cooling loads and evaluating the performance of building energy systems [19], [20], [21], [22], [23]. The peak cooling load distribution was studied by Domínguez-Muñoz et al. [24] considering the uncertainties in the building material, heat transfer coefficients of external and internal wall, internal sources, etc. Eisenhower et al. [25] conducted an uncertainty study in the intermediate processes by performing decomposition, aiming to find the most important subsystem in modelling. Sun et al. [15] proposed a design method to size building energy systems considering uncertainties in weather conditions, building envelope and operation. Cheng [26] proposed a probabilistic approach for uncertainty-based optimal design to size the chiller plant considering uncertainties of input parameters, which ensures that the chiller plant operate at a high efficiency and the minimum annual total cost could be achieved under various possible cooling load conditions.
Reliability can be defined as the probability of successful operation or performance of systems and their related equipment, with minimum risk of loss or disaster [27]. Reliability analysis or assessment is necessary to avoid/reduce losses caused by both the normal situations and abnormal situations such as the failure of some components [28]. Myrefelt [29] used actual data collected from buildings of seven large real estate operators to analyze the reliability of the HVAC systems. Peruzzi et al. [30] emphasized the importance of the reliability parameters considering financial (reduction of energy and maintenances costs), environmental and resources managing (both concerning the energy and staff) profits. Au-Yong et al. [31] investigated the maintenance characteristics of HVAC systems that affect occupants' satisfaction, subsequently established a relationship between the characteristics and occupants' satisfaction through questionnaire surveys and interviews and finally develop a regression model for prediction purpose. Gang et al. [32], [33] proposed a robust optimal design of cooling systems considering uncertainties of inputs and system reliability, which could obtain the optimal cooling systems with low cost and high robustness and provide a promising means for designers to make their best design decisions.
In order to achieve more flexible, resilient and cost effective design of the chilled water pump systems, a life-cycle based robust optimal design method is proposed in this paper. It can ensure that the chilled water system could operate at high energy performance and the minimum total life-cycle cost could be achieved under various possible cooling load conditions considering the uncertainties of design inputs and reliability of the components. A series of so-called uncertainty “scenarios” generated by Monte Carlo simulation, is used for obtaining the accurate cooling load distribution and accurate hydraulic resistance distribution. Markov method is used to obtain the steady probability distribution of each state of the system considering the reliability. Besides, pump models and three different control methods are used for evaluating the proposed design method. In order to achieve the minimum total cost, trials of simulations on different design flows and different nominal flows are conducted to obtain the optimum chilled water pump system. Section 2 describes the concept of robust optimal design in the HVAC domain. Section 3 presents the method of the robust optimal design for chilled water pump systems. Section 4 shows a case study on the proposed robust optimal design of the chilled water pump system of a building in Hong Kong. The last section draws the conclusions.
Section snippets
Concept of robust optimal design
The objective of the robust optimal design is to achieve an optimal design option of minimized life-cycle cost, which provides the system with the capability to operate at relatively high efficiency at various possible conditions considering the uncertainties of design inputs and system reliability in operation. This proposed method takes into account the uncertainty and reliability compared with the conventional/optimal design method, which has the following features:
- •
Uncertainty being
Robust optimal design method for chilled water pump systems
There are two main advanced chilled water systems in which the chilled water can be distributed from the chiller to the terminal users (air handling unit)-i.e. primary-secondary pump system and primary only pump system [36]. For primary-secondary pump system, constant-speed pumps are usually used to circulate the water in the primary loop whereas variable-speed pumps are usually employed for varying the water circulation in the secondary loop depending upon the cooling demands of terminal
Case study and results
A case study on the chilled water pump system design for a building in Hong Kong is conducted to test and evaluate the proposed robust optimal design. At first, Monte Carlo simulation is used to generate the cooling load distribution profile and the design flow is determined based on the cooling load distribution. Then, the hydraulic resistance distribution and design flow are determined according to the cooling load distribution profile. Reliability assessment of the pump system is conducted
Conclusion
This paper presented a robust optimal design method which is based on a minimized life-cycle cost to ensure the high performance of chilled water pump systems and achieve the minimum annual total cost considering uncertainties of inputs and system reliability. It is realized by optimizing the pump pressure head, the total pump flow capacity and number of chilled water pumps. A case study is given as an example to test and demonstrate the proposed method. Conclusions can be made as follows:
- •
Acknowledgements
The research presented in this paper is financially supported a general research grant (5267/13E) of the Research Grant Council of Hong Kong SAR and a grant of the MTR Corporation Limited.
References (51)
- et al.
Quantitative energy performance assessment methods for existing buildings
Energy Build.
(2012) - et al.
A simplified energy performance assessment method for existing buildings based on energy bill disaggregation
Energy Build.
(2012) - Hong Kong energy end-use data 2012, Hong Kong Electrical & Mechanical Services Department,...
- et al.
Enhancing the performance of large primary-secondary chilled water systems by using bypass check valve
Energy
(2011) - et al.
Optimal chilled water temperature calculation of multiple chiller systems using Hopfield neural network for saving energy
Energy
(2009) - et al.
Performance analysis of a chilled water system with various pumping schemes
Appl. Energy
(2012) Why efficiency matters
World Pumps
(2004)- ASHRAE Handbook, HVAC systems and equipment, Atlanta, GA...
Why did I buy such an oversized pump?
ASHRAE Trans.
(2001)- ASHRAE Handbook, HVAC systems and equipment, Atlanta, GA...
Oversized pumps—a look at practical field experiences
ASHRAE Trans.
Sensitivity analysis for robust design of building energy systems
Energy
Uncertainty in peak cooling load calculations
Energy Build.
Exploring HVAC system sizing under uncertainty
Energy Build.
Chiller plant sizing by cooling load simulation as a means to avoid oversized plant
HKIE Trans.
HVAC Equipment right-sizing: occupant comfort and energy savings potential
Energy Eng.
Some surprises in estimating the efficiency of variable speed pumps with the pump affinity laws
Proc. World Water Environ. Resour. Congr.
Uncertainty analysis in building simulation with Monte Carlo techniques
SimBuild 2010 Fourth National Conference of IBPSA-USA
Uncertainty quantification for combined building performance and cost-benefit analyses
Build. Environ.
Towards a methodology to include building energy simulation uncertainty in the Life Cycle Cost analysis of rehabilitation alternatives
J. Build. Eng.
Climatic effects on cooling load determination in subtropical regions
Energy Convers. Manage.
Identification of the building parameters that influence heating and cooling energy loads for apartment buildings in hot-humid climates
Energy
Uncertainty in peak cooling load calculations
Energy Build.
Uncertainty and sensitivity decomposition of building energy models
J. Build. Perform. Simul.
Cited by (42)
Condition-based maintenance of ceramic curved tiles roof in Primary Healthcare buildings using Markov chains
2021, Journal of Building EngineeringPreventive maintenance optimisation of accessible flat roofs in healthcare centres using the Markov chain
2020, Journal of Building EngineeringResearch on systematic optimization methods for chilled water systems in a high-rise office building
2020, Energy and BuildingsApplicability analysis of solar heating system in China based on a reliability-based optimization method for auxiliary heater capacity
2020, Sustainable Cities and Society