Abstract
Many studies on integration of process planning and production scheduling have been carried out during the last decade. While various integration approaches and algorithms have been proposed, the implementation of these approaches is still a difficult issue. To achieve successful implementation, it is important to examine and evaluate integration approaches or algorithms beforehand. Based on an object-oriented integration testbed, a simulation study that compares different integration algorithms is presented in this paper. Separated planning method and integrated planning methods are examined. Also, situations of both fixed and variable processing times are simulated, and useful results have been observed. The successful simulation with the object-oriented integration testbed eventually will be extended to include other new planning algorithms for examining their effectiveness and implementation feasibility.
Similar content being viewed by others
References
Adam, E.E. and Ebert, R.J., Production and Operations Management, 4th ed., Prentice-Hall, Englewood Cliffs, NJ (1989).
Brandimarte, P. and Calderini, M., “A Hierarchical Bicriterion Approach to Integrated Process Plan Selection and Job Shop Scheduling,” International Journal of Production Research, Vol. 33, No. 1, pp. 161-181 (1995).
Chen, Q. and Khoshnevis, B., “Scheduling with Flexible Process Plans,” Production Planning and Control, Vol. 4, No. 4, pp. 333-343 (1993).
Chryssolouris, G., Chan, S., and Cobb, W., “Decision Making on the Shop Floor: An Integrated Approach to Process Planning and Scheduling,” Robotics and Computer-Integrated Manufacturing, Vol. 1, Nos. 3-4, pp. 315-319 (1984).
Dong, J., Jo, H.H., and Parsaei, H.R., “A Feature Based Dynamic Process Planning and Scheduling,” Computers and Industrial Engineering, Vol. 23, Nos. 1-4, pp. 141-144 (1992).
Elmaraghy, H.A. and Elmaraghy, W.H., “Bridging the Gap Between Process Planning and Production Planning and Scheduling,” Manufacturing Systems, Vol. 22, No. 1, pp. 5-11 (1993).
Gu, P. and Zhang, Y., “OOPPS: An Object-oriented Process Planning System,” Computers and Industrial Engineering, Vol. 26, No. 4, pp. 709-732 (October 1994).
Ham, I. and Lu, S.C.-Y., “Computer-Aided Process Planning: The Present and the Future,” Annals of the CIRP, Vol. 37, No. 2, pp. 591-602 (1988).
Iwata, K. and Fukuda, Y., “A New Proposal Dynamic Process Planning in Machine Shop,” Proceedings of CIRP International Workshop on CAPP, Hannover, Germany, pp. 73-83 (September 1989).
Khoshnevis, B. and Chen, Q., “Integration of Process Planning and Scheduling Functions,” Journal of Intelligent Manufacturing, Vol. 1, pp. 165-167 (1990).
Larsen, N.E. and Alting, L., “Dynamic Planning Enriches Concurrent Process Production Planning,” International Journal of Production Research, Vol. 30, No. 8, pp. 1861-1876 (August 1992).
Larsen, N.E. and Clausen, J., “Applied Methods for Integration of Process Planning and Production Control,” Proceedings of Manufacturing International '92, ASME, pp. 349-364 (1992).
Lenderink, A. and Kals, H.J.J., “The Integration of Process Planning and Machine Loading in Small Batch Part Manufacturing,” Robotics and Computer-Integrated Manufacturing, Vol. 10, Nos. 1-2, pp. 89-98 (1993).
Liao, T.W., Coates, F., Aghazaden, F., Mann, L., and Guha, N., “Modification of CAPP Systems for CAPP/Scheduling Integration,” Computers and Industrial Engineering, Vol. 26, No. 3, pp. 451-463 (1994).
Mettala, E. and Joshi, S., “A Compact Representation of Alternative Process Plans/Routings for FMS Control Activities,” Journal of Design and Manufacturing, No. 3, pp. 91-104 (1993).
Ray, Steven R., “Using the ALPS Process Plan Model,” Manufacturing International 92' pp. 365-379 (1992).
Rumbaugh, J., Blaha, M., Premerlani, W., Eddy, F., and Lorensen, W., Object-Oriented Modeling and Design, Prentice-Hall, Englewood Cliffs, NJ (1991).
Singh, N., Aneja, Y.P., and Rana, S.P., “A Bicriterion Framework for Operations Assignment and Routing Flexibility Analysis in Cellular Manufacturing System,” European Journal of Operational Research, Vol. 60, pp. 200-210 (1992).
Tönshoff, H.K., Beckendroff, U., and Anders, N., “FLEXPLAN—A Concept for Intelligent Process Planning and Scheduling,” Proceedings of the CIRP International Workshop on CAPP, Hannover, Germany, pp. 88-106 (September 1989).
Tönshoff, H.K., Beckendroff, U., Anders, N., and Detand, J., “AProcess Description Concept for Process Planning, Scheduling and Job Shop Control,” Manufacturing Systems, Vol. 20, No. 1, pp. 53-60 (1991).
Zhang, D. and Zhang, H.C., “Integrated Process Planning and Production Scheduling: Object-Oriented Approach,” ASME Winter Annual Meeting, pp. 12-17 (November 1995).
Zhang, D. and Zhang, H.C., “An Object-oriented Integration Testbed for Process Planning and Production Scheduling,” Journal of Computer Integrated Engineering, Vol. 4, No. 4, pp. 319-338 (1997a).
Zhang, H.C., “IPPM—A Prototype to Integrate Process Planning and Job Shop Scheduling Functions,” Annals of the CIRP, Vol. 42, No. 1, pp. 513-518 (1993).
Zhang, H.C. and Zhang, D., “Integration of Process Planning and Production Scheduling,” chapter 12 of Integrated Product, Process and Enterprise Design, H.P. Wang (Ed.), Chapman & Hall, London (1997b).
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Zhang, D., Zhang, H.C. A Simulation Study of an Object-Oriented Integration Testbed for Process Planning and Production Scheduling. International Journal of Flexible Manufacturing Systems 11, 19–35 (1999). https://doi.org/10.1023/A:1008040622456
Issue Date:
DOI: https://doi.org/10.1023/A:1008040622456