Overall multiobjective optimization of construction projects scheduling using particle swarm

Emad Elbeltagi (Department of Structural Engineering, Mansoura University, Mansoura, Egypt)
Mohammed Ammar (Department of Structural Engineering, Tanta University, Tanta, Egypt)
Haytham Sanad (Department of Structural Engineering, Tanta University, Tanta, Egypt)
Moustafa Kassab (Department of Civil Engineering, Taibah University, Almadinah, Saudi Arabia)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 16 May 2016

1837

Abstract

Purpose

Developing an optimized project schedule that considers all decision criteria represents a challenge for project managers. The purpose of this paper is to provide a multi-objectives overall optimization model for project scheduling considering time, cost, resources, and cash flow. This development aims to overcome the limitations of optimizing each objective at once resulting of non-overall optimized schedule.

Design/methodology/approach

In this paper, a multi-objectives overall optimization model for project scheduling is developed using particle swarm optimization with a new evolutionary strategy based on the compromise solution of the Pareto-front. This model optimizes the most important decisions that affect a given project including: time, cost, resources, and cash flow. The study assumes each activity has different execution methods accompanied by different time, cost, cost distribution pattern, and multiple resource utilization schemes.

Findings

Applying the developed model to schedule a real-life case study project proves that the proposed model is valid in modeling real-life construction projects and gives important results for schedulers and project managers. The proposed model is expected to help construction managers and decision makers in successfully completing the project on time and reduced budget by utilizing the available information and resources.

Originality/value

The paper presented a novel model that has four main characteristics: it produces an optimized schedule considering time, cost, resources, and cash flow simultaneously; it incorporates a powerful particle swarm optimization technique to search for the optimum schedule; it applies multi-objectives optimization rather than single-objective and it uses a unique Pareto-compromise solution to drive the fitness calculations of the evolutionary process.

Keywords

Citation

Elbeltagi, E., Ammar, M., Sanad, H. and Kassab, M. (2016), "Overall multiobjective optimization of construction projects scheduling using particle swarm", Engineering, Construction and Architectural Management, Vol. 23 No. 3, pp. 265-282. https://doi.org/10.1108/ECAM-11-2014-0135

Publisher

:

Emerald Group Publishing Limited

Copyright © 2016, Emerald Group Publishing Limited

Related articles