Title: A Review of Strand Development Length for Pretensioned Concrete Members
Date: March-April, 1995
Volume: 40
Issue: 2
Page number: 84-105
Author(s): C. Dale Buckner
https://doi.org/10.15554/pcij.03011995.84.105

Click here to access the full journal article

Abstract

In October 1988, the Federal Highway Administration (FHWA) issued a memorandum that placed restrictions on the use of seven-wire strands for pretensioned concrete members in highway bridge  applications. As a result of this memorandum, research projects on strand transfer and development lengths were initiated at many institutions across the United States and Canada, often resulting in conflicting design recommendations for transfer and development lengths of pretensioned strands. In an attempt to reconcile some of the differences in the design recommendations, the FHWA  conducted an independent review of the recent research. This paper represents a summary of that effort. The specific objectives of the study were: (1) .conduct a review of literature related to strand transfer and development length research; (2) analyze data from recent studies and rationalize discrepancies among conclusions drawn from these studies; and (3) recommend equations for strand transfer and  development lengths consistent with the current state-of-knowledge.

References

1. ACI Committee 318, "Building Code Requirements for Reinforced Concrete (ACI 318-89)," American Concrete Institute, Detroit, MI, 1989.

2. AASHTO, Standard Specifications for Highway Bridges, Fifteenth Edition, American Association of State Highway and Transportation Officials, Washington, D.C., 1992.

3. Hanson, N. W., and Kaar, P. H., "Flexural Bond Tests of Pretensioned Prestressed Beams," ACI Journal, V. 55, No.7, 1959, pp. 783-803.

4. Tabatabai, H., and Dickson, T. J., "The History of the Pretensioning Strand Development Length Equation," PCI JOURNAL, V. 38, No. 6, November-December 1993, pp. 64-75.

5. Martin, L. D., and Scott, N. L., "Development of Prestressing Strand in Pretensioned Members," ACI Journal, V. 73, No. 8, August 1976, pp. 453-456.

6. Anderson, Arthur R., Anderson, Richard G., Holmberg, Ake, Martin, Leslie D., Scott, Norman L., Nijhawan, Jagdish C., Sanderson, K. J., Zia, P., and Mostafa, T., Discussion of Ref. 7, "Development  ength of Prestressing Strands," PCI JOURNAL,  V. 23, No. 4, July-August 1978, pp. 97-106.

7. Zia, P., and Mostafa, T., "Development Length of Prestressing Strands," PCI JOURNAL, V. 22, No. 5, September-October 1977, pp. 54-65.

8. Cousins, T. T., Johnston, D. W., and Zia, P., "Transfer and Development Length of Epoxy-Coated and Uncoated Prestressing Strand," PCI JOURNAL, V. 35, No. 4, July-August 1990, pp. 92-103.

9. FHWA, "Prestressing Strand for Pretension Applications - Development Length Revisited," Memorandum, Chief, Bridge Division, Federal Highway Administration, Washington, D.C., October 1988.

10. Russell, Bruce W., "Impact of High Strength Concrete on the Design and Construction of Pretensioned Concrete Bridges," PCI JOURNAL, V. 39, No.4, July-August 1994, pp. 76-89.

11. Deatherage, J. H., Burdette, E. G., and Chew, C. K., "Development Length and Lateral Spacing Requirements of Prestressing Strand for Prestressed Concrete Bridge Girders," PCI JOURNAL, V. 39, No. 1, January-February 1994, pp. 70-83.

12. Shahawy, M. A., Issa, M., and Batchelor, B., "Strand Transfer Lengths in Full Scale AASHTO Prestressed Concrete Girders," PCI JOURNAL, V. 37, No.3, May-June 1992, pp. 84-96.

13. Shahawy, M., and Batchelor, B., "Bond and Shear Behavior of Prestressed AASHTO Type II Beams," Progress Report No. 1, Structural Research Center, Florida Department of Transportation,  February 1991.

14. Shahawy, M.A., and Issa, M., "Effect of Pile Embedment on the Development Length of Prestressing Strands," PCI JOURNAL, V. 37, No.6, November- December 1992, pp. 44-59.

15. Lane, S. N., "Development Length of Prestressing Strand," Public RoadsA Journal of Highway Research and Development, Federal Highway Administration, V. 54, No. 2, September 1990,pp.200-205.

16. Russell, B. W., and Burns, N. A., "Design Guidelines for Transfer, Development and Bonding of Large Diameter Seven-Wire Strands in Pretensioned Concrete Girders," Research Report No.  1210-SF, Center for Transportation Research, University of Texas at Austin, Austin, TX, 1993, 286 pp.

17. Abdalla, 0. A., Ramirez, J. A., and Lee, R. H., "Strand Debonding in Pretensioned Beams - Precast Prestressed Concrete Bridges With Debonded Strands - Simply Supported Tests," Part 2, Final  Report FHW AI INDOT/JHRP-92, 1993,228 pp.

18. Cousins, T. E., Francis, L. H., Stallings, J. M, and Gopu, V. K. A., "Spacing and Cover Requirements of Epoxy-Coated Prestressing Strands in Unconfined Sections," PCI JOURNAL, V. 38, No. 5,  September-October 1993, pp. 76-84.

19. Mitchell, D., Cook, W. D., Khan, A. A., and Tham, T., "Influence of High Strength Concrete on Transfer and Development Length of Pretensioning Strand," PCI JOURNAL, V. 38, No.3, May-June  1993, pp. 52-66.

20. den Uijl, J. A., "Background CEB-FIP MC90 Clauses on Anchorage and Transverse Tensile Actions in the An- March-April 1995 chorage Zone of Prestressed Concrete Members," Draft Bulletin of  the CEB, Delft University of Technology, Delft, The Netherlands.

21. Balazs, G. L., "Transfer Lengths of  Prestressing Strand as a Function of Draw-in and Initial Prestress," PCI JOURNAL, V. 38, No. 2, MarchApril 1993, pp. 86-93.

22. Loov, R., "A General Equation for the Steel Stress for Bonded Prestressed Concrete Members," PCI JOURNAL, V. 33, No. 6, November-December 1988, pp. 108-148.

23. Buckner, C. D., "An  Analysis of Transfer and Development Lengths for Pretensioned Concrete Structures," Report No. FHWA-RD-94-049, Federal Highway Administration, Washington, D.C.,  December 1994, 108 pp.

24. Deatherage, J. J., and Burdette, E. G., "Development Length and Lateral Spacing Requirements of Prestressing Strand for Prestressed Concrete Bridge Products," PCI Report, Transportation Center,  University of Tennessee, Knoxville, September 1991, 127 pp.

25. Deatherage, J. H., Chew, C. K., and Burdette, E. G., "Behavior of Prestressed AASHTO Girders Under Static Loading," Preprint No. 0870, Transportation Research Board, National Academy of  Sciences, Washington, D.C., January 1993, 23 pp. 26. Shahawy, M., "An Investigation of Shear Strength of Pretensioned Concrete AASHTO Type II Girders," Structures Research Center, Florida Department of Transportation, May 1993, 132 pp.

27. Buckner, C. D., Shahawy, M. A., and Issa, M., Discussion of "Effect of Pile Embedment on the Development Length of Prestressing Strands," PCI JOURNAL, V. 38, No. 5, September-October 1993, pp. 86-88.

28. Russell, B. W., and Burns, N. H., "Development Length and Flexural Bond Behavior of AASHTO-Type Girders With Fully Bonded and Blanketed Strands," Technical Memo 1210-2, Center for  Transportation Research, University of Texas at Austin, Austin, TX, March 1991, 20 pp.

29. Stocker, M. F., and Sozen, M.A., "Investigation  of Prestressed Concrete for Highway Bridges, Part VI: Bond Characteristics of Prestressing Strand," Bulletin 503, University of Illinois, Urbana,  Illinois, 1970.

30. Anderson, A. R., and Anderson, R. G., "An Assurance Criterion for Flexural Bond in Pretensioned Hollow Core Units," ACI Journal, V. 73, No. 8, August 1976, pp. 457-464.

31. Russell, B. W., and Burns, N. H., "Static and Fatigue Behavior of Pretensioned Composite Bridge Girders Made With High Strength Concrete," PCI JOURNAL, V. 38, No. 3, MayJune 1993,pp.116-128.

32. Ralls, M. A., Ebonies, L., and Panache, J. J., "The New Texas UBeam Bridges: An Aesthetic and Economical Design Solution," PCI JOURNAL, V. 38, No. 5, SeptemberOctober 1993, pp. 20-29.

33. PCI Design Handbook: Precast and Prestressed Concrete, Fourth Edition, Precast/Prestressed Concrete Institute, Chicago, IL, 1992.