Life Cycle Analysis of Road Construction and Use

Department of Civil, Construction and Environmental Engineering, Sapienza University of Rome, 00184 Rome, Italy
*
Author to whom correspondence should be addressed.
Sustainability 2019, 11(2), 377; https://doi.org/10.3390/su11020377
Submission received: 17 December 2018 / Revised: 7 January 2019 / Accepted: 9 January 2019 / Published: 13 January 2019

Abstract

:
Both the construction and use of roads have a range of environmental impacts; therefore, it is important to assess the sources of their burdens to adopt correct mitigation policies. Life cycle analysis (LCA) is a useful method to obtain demonstrable, accurate and non-misleading information for decision-making experts. The study presents a “cradle to gate with options” LCA of a provincial road during 60 year-service life. Input data derive from the bill of quantity of the project and their impacts have been evaluated according to the European standard EN 15804. The study considers the impacts of the construction and maintenance stages, lighting, and use of the vehicles on the built road. The results obtained from a SimaPro model highlight that the almost half of impacts took place during the construction stage rather than the use stage. Therefore, the adoption of environmentally friendly road planning procedures, the use of low-impact procedures in the production of materials, and the use of secondary raw materials could have the largest potential for reducing environmental impacts.

1. Introduction

In recent years, environmental aspects related to road infrastructure construction have increasingly come under examination [1,2] in order to apply environmental award criteria in calls for tender [3] and introduce the green public procurement (GPP). At the international level, several efforts have been made to apply GPP to the road sector: in Sweden, environmental aspects are integrated in road maintenance contracts [4,5,6]; in Finland, procurement methods are implemented to reduce the environmental impacts of roads [7]; in the Netherlands, GPP has been implemented to manage the main road network [8].
Currently, the Italian Ministry of the Environment is transposing the meaning of the document “Green Public Procurement Criteria for Road Design, Construction and Maintenance” published in 2016 by the European Union [9] to encourage the purchasing of products, services and works with reduced environmental impacts. Four criteria are proposed to assess the life cycle impacts of road construction: Life Cycle Impact Assessment (LCIA), Carbon footprint (CF), recycled and re-used content, and Low emissions from transport of heavy materials. The listed criteria have decreasing levels of ambition and technical complexity: in literature the most frequently adopted frameworks are LCIA and CF [10,11,12,13]. LCIA is a holistic assessment tool which considers different environmental impacts (e.g., acidification, eutrophication, abiotic depletion), while CF only evaluates the total amount of greenhouse gas emissions of road processes: CF is the result of a partial LCIA implementation. Recycled and re-used content and low emissions from transport of heavy materials focus respectively on the content of used recycled, re-used or by-products materials, and on CO2 emissions from the transportation of aggregates. These last two approaches are alternatives to LCIA and CF, and it is recommended to combine both in order to achieve an overall environmental benefit. According to the EU environmental objectives and data available in the literature, authors adopted the LCIA because it allows a quantitative and robust evaluation of each examined process [14]. Indeed, the unbiased and comparable results from LCIA depend on the specific production chain, it takes into account the specific boundary system and operational conditions, and could be adopted as an effective environmental decision support system [15]. Since the early 2000s, some research has used the life cycle assessment methodology to assess the environmental performances of a road and its different stages. With different analysis periods and functional units, they examined the environmental impacts of road materials [16,17,18,19,20] and compared construction techniques and maintenance activities [10,21,22,23,24,25] with different methods and software. Marzouk et al. [21] used the software Copert 4 [26] to assess the overall environmental impacts and primary energy associated with earthwork and pavement processes. Hammervold [22] applied the impact assessment method ReCiPe [27] to construction and maintenance activities of two highway projects in southern Norway in order to identify the main aspects affecting LCA results. Burdens of traffic are not considered. According to EN 15804 [28], Moretti et al. [23] assessed the environmental and human health impact of construction of two different road cross-sections (i.e., embankment and trench sections). Sayagh et al. [24] used the tool ERM (elementary road modulus) [29], to assess LCA of construction and maintenance activities three different road pavements. The EU project ECRPD [25] assessed impacts of wearing layers during their construction and maintenance, whereas initial phases of road and pavement construction (e.g., subgrade preparation and subbase construction) were excluded.
Conversely, this study aims to assess, according to the standard EN 15804 “Sustainability of construction works, environmental product declarations, core rules for the product category of construction products” [28] the environmental impacts of construction and use of a provincial road in Central Italy. The analysis starts considering the input data from the bill of quantity of the project: it considers all materials, works and processes needed to have the final product: “the road”. Moreover, the analysis examines the use stage of the road during 60-year service life until its exceptional maintenance of structures occurs: all impacts from traffic and routine maintenance are assessed. The importance of this work is that it provides reliable LCIA results of the environmental impacts of construction and use of a real road. The interpretation of the results allows the identification of the majority of impacting processes currently used in this sector, in order to reduce its burdens and to develop an environmentally aware public procurement policy.

2. Materials and Methods

In this study, the LCIA methodology has been implemented to assess the environmental impacts of construction and use of an 8.5 km-long provincial road during 60 year-service life. The examined road offers a solution to the local and touristic traffic between two densely populated towns. Figure 1 represents the cross-section of the analyzed infrastructure: it is composed of two 1.25 m wide shoulders and two 3.50 m wide lanes.
The road is in a mountainous region of central Italy, where the Appennine mountains are located. The territory morphology seriously affects the altimetric design of the infrastructure, whose 16.6% in length is raised on above- and under-grade structures. Indeed, the road is composed of:
  • 7.1 km-long open road sections (not more than 5 m-high trench or embankment cross-sections);
  • 0.3 km-long 4-span new bridge with reinforced-concrete slab on three U-shaped precast reinforced-concrete beams;
  • 1.1 km of new single-tube tunnel built with mechanized excavation. According to the geological condition, one part of the rock is granite and the other one is shale. In the joint part the overlying bedrock thickness is approximately 200 m. Water inflows were expected when tunnel excavation approached the joint of two rocks. Therefore, foam consolidation and grouting method were designed to control the displacement of the rock and its supports.
Geometrical and functional issues were adopted for the road design to comply with the current Italian requirements for the construction of minor highways [30]; for the first 20 years of service life, the design traffic consists of the number of passes listed in Table 1.
Table 2 lists the traffic spectrum of commercial and heavy vehicles within the first 20 years of service life.
Given a subgrade resilient modulus equal to 90 MPa, and the traffic data in Table 1 and Table 2, for a 20-year service life the flexible pavement is composed of [31]:
  • 3 cm-thick asphalt wearing course;
  • 5 cm-thick asphalt binder course;
  • 12 cm-thick asphalt base course;
  • 30 cm-thick cement-stabilized sub-base.
In order to assess the impacts of construction and use of the road for 60 years, the authors assumed that traffic volume and spectrum do not change during the overall reference service life.
The bill of quantity, which is not disclosed herein, due to privacy reasons, allowed the identification of works and materials needed for the road construction. These data constituted the Life Cycle Inventory (LCI) and they were modeled according to the characterization factors listed in EN 15804:2012+A1:2013 [28] in order to calculate the Life Cycle Impact Assessment (LCIA). The characterization factors allow for comparing the ability of different substances to cause the same environmental impact because they convert the results from LCI into a common unit of a category indicator, expressed as equivalent (eq.), (Equation (1)):
I C = x C F i c ( x ) · I N V ( x )
where IC is the Impact Category, obtained from the inventory of the substance x, INV(x), and CFic(x) is the characterization factor assigned to the substance x for the calculation of IC.
The database Ecoinvent 3.1 [32], integrated in the software package SimaPro 8.0.5.13 [33], was used to assess the impact categories listed in Table 3. These parameters describe the environmental impacts according to the EN 15804 [28].
The LCIA was carried out according to the standard EN 15804: for each impact category, the study evaluated the overall impact of road construction and/or use, and the partial contributions of four different stages:
  • stage A1: extraction and processing of raw materials, reuse of products or materials from a previous production system, processing of secondary materials used as input, and generation of electricity, steam and heat from primary energy resources, including their extraction, refining and transport;
  • stage A2: transportation of materials and machines to production and construction site;
  • stage A3: in-situ works for road construction (e.g., use of dumpers, graders, lighting installation, waste processing; on-site operations to the road, etc.);
  • stage A4: use of the road (i.e., environmental impacts due to the expected traffic, pavement maintenance, and tunnel lighting).
Figure 2 represents the flow diagram of the phases involved in the “from cradle to gate with options” LCIA.
For pavement maintenance, the authors assumed preventive works according to Table 4 [34] for the first 20 years. At the end of 20th year, the pavement will be demolished, rebuilt and maintained according to Table 4.
For tunnel lighting, the authors derived data from previous studies [35,36]. Therefore, the lighting system complies with the requirements laid down by the Italian Organization for Standardization [37,38,39,40]. Particularly, the standard UNI 11095 [37] divides the longitudinal section of the tunnel in five reference zones (i.e., access, threshold, transition, interior and exit zones). Each zone differs for the minimum luminance value to be ensured as consequence of the design speed, the meteorological visibility distance, the horizontal lighting in the access zone, the natural luminance, and the optics type. As consequence of different daylight conditions, the tunnel lighting system is composed of one permanent and seven reinforcement installations. Lighting Emission Diode (LED) devices are installed, and they are arranged in a single line in permanent lighting, or in a quincunx geometric pattern in the reinforcement system. Table 5 lists details about the lighting system for each 20-year period of service life.
Table 6 lists the routine maintenance program for the lighting system.
For maintenance of structures (e.g., the bridge and the tunnel), the authors assumed the routine maintenance program listed in Table 7.
In order to analyze the effect of the examined stages and identify the most critical works, materials or processes, a sensitivity analysis was carried out. At this purpose, the authors assumed all processes would have a period of less than 20 years occur in cyclic form during the overall service life.

3. Results

The A1 to A3 LCIA results for the examined road are listed in Table 8. They refer only to the materials and processes needed for road construction, as required by the project. All construction materials are transported to the road site over distances no greater than 25 km.
The bar graph in Figure 3 shows the percentage contribution between phases of road construction.
Four main observations can be extracted from Table 7 and Figure 3:
  • in the “from cradle to use” analysis, the most impacting phases are A1 and A3: except for ADP-E, they account on average for more than 90% of total burdens;
  • in the phase A1, ODP and ADP-F have the lowest contribution (i.e., 22%), while EP and POCP have the highest contributions (i.e., 58% and 54%, respectively);
  • transportation (both external and internal) is the phase which implies the lowest contribution: A2 is on average 3.2%;
  • in the phase A3, ADP-F and ODP give the highest contributions (on average 74.5%).
For each impact category, the authors examined the ten most impacting items, which contribute to more than 92% of the totals:
  • for GWP, diesel machines for earth moving, tunnel excavation and cement grouting cause 1.99 × 108 kg CO2 eq. (i.e., 53% of the overall impact). Aggregates, concrete, reinforcing steel, and lime mortar cause 38% of the overall impact; the most impacting freight transport (used for transport of cement concrete up to the roadwork site) causes emissions of 3.50 × 106 kg CO2 eq. (i.e., 1% of total GWP);
  • for ODP and ADP-F, diesel machines for earth moving, tunnel excavation, and cement grouting cause 70% and 69% of the overall impacts, respectively. Aggregates, concrete, reinforcing steel, and lime mortar cause 19% and 20% of the overall impact, respectively; the most impacting freight transport (used for transport of cement concrete up to the roadwork site) causes respectively emissions of 6.03 × 10−1 kg CFC-11 eq. and 4.17 × 107 MJ, (i.e., 1% of total ODP and 1% of total ADP-F);
  • for AP, diesel machines for earth moving, tunnel excavation, and cement grouting cause 6.89 kg SO2 eq. (i.e 48% of total AP). Aggregates, concrete, reinforcing steel, and lime mortar cause 43% of the overall impact. Freight transport contributions do not rank in the top ten items: the first one’s contribution is related to transport of cement concrete up to the roadwork site and represents 1% of total AP;
  • for EP and POCP, diesel machines for earth moving machines and cement grouting cause respectively 37% and 40% of the overall impacts, respectively. Aggregates, concrete, reinforcing steel, and lime mortar cause respectively 54% and 51% of the overall impact. For both ICs, transport of granular materials is 1% of total impact (i.e., 3.36 × 106 kg PO43− eq. and 2.93 × 103 kg C2H4 eq., respectively);
  • ADP-E is the impact category with the lowest contribution of earth moving machines (i.e., 32%), while construction materials account for 48% of total consumption of abiotic depletion for non-fossil resources. The most impacting transport items (transport of cement concrete and granular materials up to the roadwork site) imply 6% of the overall impact.
The analysis of the ten most impacting items for each IC highlights the need for adopting strategies to reduce the impacts of tunnel excavation, road materials production and excavation. In particular, it focuses on the serious impact of tunnel construction and calls for reflection on a wider scale, involving geometric and strategic choices in the design process. Moreover, the high impacts of “standard” building materials used for road construction point out the importance of using secondary raw materials to conserve resources and promote recycling in such sector. Indeed, for each impact category, the road pavement and its materials and works cause on average not more than 1% of total impacts; on the other hand, tunnel lighting equipment does not provide relevant contributions to ICs.
Table 9 lists the overall A4 impacts of traffic, pavement and structures maintenance, consumption and maintenance of tunnel lighting during the 60-year service life. For the effects of the design traffic, refer to Euro 4 and Euro IV vehicle stages in reference [41]. It is a conservative approach compliant with the current Italian total fleet.
Therefore, this analysis can be correctly defined a “cradle to gate with transportation to work site and use options” study.
The bar graph in Figure 4 represents the percentage contributions of A1 to A4 phases of the examined road during its 60-year reference service life.
One main observation can be extracted from Figure 4: on average, A4 contributes to 53% of the overall impact of LCIA. Therefore, the reason why the road has been constructed has overall about half the total impact on the environment: raw materials, fuels, transportation and construction site set-up cause more than 47% of the overall impacts. The possible future renovation of total fleet (e.g., renovation of current fleet, use of environment-friendly engines and fuels as gas-propelled or electric vehicles) could accentuate the relative impact of the construction stage. Under the present conditions, the obtained results in terms of “transportation” incidence during the service life comply with reference [42]. According to Stripple [42], the emissions of NOx, SO2 and CO2 are dominated by the road construction during a 40 year-service life.
As discussed above, the pavement contribution to the total impacts is not relevant; construction of the wearing, binder, base and subbase contribute on average to less than 1%. Even if motorization will change, loads to be transported on the road will not have substantial increases, and pavement contributions will maintain a low incidence. Accordingly, construction and impacts of big structures needed for the road (e.g., bridges and tunnels) will become even more significant.
Given the obtained results, an in-depth impact analysis with more severe traffic conditions has been carried out. According to reference [31], the authors modified the scenario and considered an increase of the road traffic volume. The number of passes of commercial and heavy vehicles varied from 1.5 million/20 years to 10 million/20 years, which is the maximum value expected in the Italian Catalogue of road pavements. The number of cars and mopeds varied accordingly to the traffic spectrum in Table 2. The increase in traffic volume required to adjust the road pavement composition [43] and its related construction and maintenance works in order to achieve the required level of service [44]. The new flexible pavement is composed of 5 cm-thick asphalt wearing course, 8 cm-thick asphalt binder course, 17 cm-thick asphalt base course, and 15 cm-thick granular sub-base.
Table 10 lists the A1 to A4 LCIA results for the amended scenario. The modification of pavement composition affects all the examined phases because it varies both the amount of materials and works (i.e., A1 to A3, upstream phases) before opening up to traffic volume and the maintenance works (i.e., A4). Conversely the increase in traffic volume only affects the use stage (i.e., A4).
With reference to Table 8, the assumed increase in traffic volume (+667%) more than triples the overall IC values: the differences range between +293% of EP and +567% of ADP-E.
Figure 5 represents the percentage contributions of A1 to A4 phases of the amended scenario during its 60-year reference service life.
All trends of the seven examined ICs significantly differ from the original scenario. All significant variations are due to the increase in traffic volume: the impacts of A1 to A3 phases in the amended scenario change by not more than 0.8% from the original results. An inversion of “until opening to traffic” vs “use” phase has been observed. Indeed, the contribution of A1 to A3 phases to the total impacts has almost halved (e.g., for GWP it decreases from 54% to 17%, for ADP-F from 50% to 15%). For ADP-E, due to its reliance on fuel consumption, the contribution of A4 phase varies from 10% to 2%.
Given the obtained results, it is possible to identify the breakeven point which represents the number of passes of commercial and heavy vehicles when the “until opening for traffic” impacts match the “use” ones. Figure 6 graphs the findings about the trend of the investigated ICs contributions: the millions of passes of commercial and heavy vehicles are represented on the abscissa, and the percentages of traffic impacts compared to the total value of each parameter are represented on the ordinate.
According to Figure 6, the expected traffic volume during the overall service life (i.e., 4.5 million passes of commercial and heavy vehicles) causes 87% of total ADP-E, 46% of ODP, 45% of total ADP-F, 44% of ODP, 41% of GWP and AP, and 37% of EP. A traffic volume with more than 6 million passes of commercial and heavy vehicles is expected to set the condition for the traffic to contribute to half the overall environmental impacts for ADP-F, POCP, and ODP at least. More than 8 million passes of commercial and heavy vehicles are needed to obtain these results for GWP, EP, and AP.

4. Discussion

The obtained numerical results permitted to analyze the environmental impacts of the examined road and its theoretical amended scenario during their 60-year service life.
The quantitative measurements of environmental performances can be used to compare different equivalent proposals when decision-making must be carried out. Indeed, the adopted methodology can be applied to other studies in order to analyze different road projects and facilitate knowledge-based comparative assertions. Although the LCA results are quantitative, however in a (green) public procurement procedure, a decision process should identify the least environmentally damaging choice from a multidimensional perspective [45]. Comparison of all indicators against each other, which is possible only when all the adopted rules and procedures coincide, is not simple because the quantity of data, the multiple unit of measures, the various media to which substances outflow, therefore, a multicriteria decision analysis (MCDA) needs to interpret the results [46] and solve the trade-off between environmental impacts.
Moreover, the comparison of the environmental performances between the original and the amended scenario highlighted that LCA results are specific and each project should be examined under its own boundary system, geographical, social and operational conditions. In the examined case, the decision to construct a route resulted from deepen analysis and assessment of available strategic and theater lift assets, transportation infrastructure, and economic and financial forecasts. Therefore, as a result of the preliminary studies, the road alignment and geometric design cross mountain areas: this determines the structural and technical solutions, which are complex and environmentally-expensive compared to the design traffic, which is relatively low. Therefore, a comprehensive and critical analysis needs to establish the feasibility and sustainability of a road project [47]. To achieve this purpose, MCDA may be applied within the LCA context to aid interpretation of outcomes within the framework of sustainable and environmentally-friendly strategies. Indeed, the multicriteria approach would make it possible to reconcile environmental, economic, and social issues and to synthesize their various aspects.

5. Conclusions

Life Cycle Analysis has been recently adopted to study the environmental impacts of road transport infrastructure. This approach facilitates the unbiased assessment and critical interpretation of a product. This study compares—for the first time—reliable LCIA results of the environmental impacts of construction and use of an Italian provincial road. The importance of the obtained results is that they allow the identification of processes and technologies responsible for the majority of potential negative impacts on the environment. The examined road is in a mountainous region of the central Italy: therefore, 16.6% in length is raised on tunnels and viaducts. The design traffic consists of low volume: 4.5 million passes of commercial and heavy vehicles during 60-year reference service life. This condition seriously affects the LCA: the high incidence of “until opening for traffic” phases reflects the complexity of the work. According to the European standard EN 15804, seven impact categories have been assessed: the results showed that the largest part of burdens are from structural materials (e.g., aggregates, concrete, reinforcing steel and earth moving machines), while burdens from the “use” phase (i.e., maintenance, traffic, and lighting) are not more than 50% throughout the service life. Moreover, the results demonstrated that it is incorrect to consider only one environmental impact to identify the “greenest” process among several alternatives. Indeed, each indicator has a different incidence in terms of its environmental impact, and the contribution of each stage related to the LCA significantly differs from the examined parameters. In particular, the analysis highlighted the need for MCDA to interpret the results and solve the trade-off between environmental impacts.
Finally, it has been found that high traffic volumes may reduce the impacts of “until opening for traffic” to 28% of the total: when 30 million passes of commercial and heavy vehicles are expected, the “traffic” phase cause on average 82% of impacts. This demonstrates that there are important differences in the environmental performance of a road varying its design traffic: the same geometric design significantly varies its degree of environmental sustainability. Therefore, the proposed environmental approach should be integrated with social and economic criteria in order to obtain a comprehensive sustainability assessment.

Author Contributions

Conceptualization, L.M.; Data curation, L.M.; Formal analysis, G.T.; Investigation, G.T. and L.M.; Methodology, L.M.; Supervision, A.D.; Visualization, L.M.; Writing—original draft, G.T. and L.M.

Funding

This research received no external funding.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Miccoli, S.; Finucci, F.; Murro, R. Urban Green Infrastructures and Social Shared Choices: A Deliberative Valuation Method. Appl. Mech. Mater. 2014, 641–642, 1082–1086. [Google Scholar] [CrossRef]
  2. Miccoli, S.; Finucci, F.; Murro, R. Criteria and Procedures for Regional Environmental Regeneration: A European Strategic Project. Appl. Mech. Mater. 2014, 675–677, 401–405. [Google Scholar] [CrossRef]
  3. Parikka-Alhola, K.; Nissinen, A. Environmental Impacts of Transport as Award Criteria in Public Road Construction Procurement. Int. J. Constr. Manag. 2012, 12, 35–49. [Google Scholar] [CrossRef]
  4. Faith-Ell, C. The Application of Environmental Requirements in Procurement of Road Maintenance in Sweden. Ph.D. Thesis, KTH Land and Water Resources Engineering, Stockholm, Sweden, 2015. [Google Scholar]
  5. Faith-Ell, C.; Balfors, B.; Folkeson, L. The application of environmental requirements in Swedish road maintenance contracts. J. Clean. Prod. 2006, 14, 163–171. [Google Scholar] [CrossRef]
  6. Varnäs, A.; Balfors, B.; Faith-Ell, C. Environmental consideration in procurement of construction contracts: Current practice, problems and opportunities in green procurement in the Swedish construction industry. J. Clean. Prod. 2009, 17, 1214–1222. [Google Scholar] [CrossRef]
  7. Procurement Strategy of the Finnish Road Administration. 2003. Edita Prima Oy, Helsinki. Available online: http://www.doria.fi/bitstream/handle/10024/133234/tie1673.pdf?sequence=1 (accessed on 12 January 2019).
  8. Versteeg, H. Netherlands’ experience with sustainable procurement in road construction. International Road Federation. In Proceedings of the IRF Environment Study Day—GPP & Technology Advancements in the Road Sector, Brussels, Belgium, 20 September 2011. [Google Scholar]
  9. European Commission. EU Green Public Procurement Criteria for Road Design, Construction and Maintenance; European Commission: Brussels, Belgium, 2016. [Google Scholar]
  10. Celauro, C.; Corriere, F.; Guerrieri, M.; Lo Casto, B.; Rizzo, A. Environmental analysis of different construction techniques and maintenance activities for a typical local road. J. Clean. Prod. 2017, 142, 3482–3489. [Google Scholar] [CrossRef]
  11. Balaguera, A.; Carvajal, G.I.; Alberti, J.; Fullana-i-Palmerb, P. Life cycle assessment of road construction alternative materials: A literature review. Resour. Conserv. Recycl. 2018, 132, 37–48. [Google Scholar] [CrossRef]
  12. Kar, S.S.; Behl, A.; Shukla, A.; Jain, P.K. Estimation of Carbon Footprints of Bituminous Road Construction Process. J. Civil Environ. Eng. 2015, 5, 198. [Google Scholar]
  13. Sreedhar, S.; Jichkar, P.; Biligir, K.P. Investigation of Carbon Footprints of Highway Construction Materials in India. Transp. Res. Procedia 2016, 17, 291–300. [Google Scholar] [CrossRef]
  14. Löfgren, B.; Tillman, A.; Rinde, B. Manufacturing actor’s LCA. J. Clean. Prod. 2011, 19, 17–18. [Google Scholar] [CrossRef]
  15. Poch, M.; Comas, J.; Rodrıguez-Roda, I.; Sànchez-Marrè, M.; Cortès, U. Designing and building real environmental decision support systems. Environ. Model. Softw. 2014, 19, 857–887. [Google Scholar] [CrossRef]
  16. Praticò, F.; Casciano, A.; Tramontana, D. Pavement life-cycle cost and asphalt binder quality: Theoretical and experimental investigation. J. Constr. Eng. Manag. 2010, 137, 99–107. [Google Scholar] [CrossRef]
  17. Moretti, L.; Mandrone, V.; D’Andrea, A.; Caro, S. Comparative “from cradle to gate” Life Cycle Assessments of Hot Mix Asphalt (HMA) Materials. Sustainability 2017, 9, 400. [Google Scholar] [CrossRef]
  18. Azarijafari, H.; Yahia, A.; Ben Amor, M. Life cycle assessment of pavements: Reviewing research challenges and opportunities. J. Clean. Prod. 2016, 112, 2187–2197. [Google Scholar] [CrossRef]
  19. Moretti, L.; Caro, S. Critical analysis of the Life Cycle Assessment of the Italian Cement Industry. J. Clean. Prod. 2017, 152, 198–210. [Google Scholar] [CrossRef]
  20. Moretti, L.; Di Mascio, P.; Bellagamba, S. Environmental, human health and socio-economic effects of cement powders: The multicriteria analysis as decisional methodology. Int. J. Environ. Res. Public Health 2017, 14, 645. [Google Scholar] [CrossRef] [PubMed]
  21. Marzouk, M.; Abdelkader, E.M.; El-zayat, M.; Aboushady, A. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries. Sustainability 2017, 9, 843. [Google Scholar] [CrossRef]
  22. Hammervold, J. Towards Greener Road Infrastructure: Life cycle Assessment of Case Studies and Recommendations for Impact Reductions and Planning of Road Infrastructure. Ph.D. Thesis, NTNU, Trondheim, Norway, 2015. [Google Scholar]
  23. Moretti, L.; Mandrone, V.; D’Andrea, A.; Caro, S. Evaluation of the environmental and human health impact of road construction activities. J. Clean. Prod. 2018, 172, 1004–1013. [Google Scholar] [CrossRef]
  24. Sayagh, S.; Venturaa, A.; Hoanga, T.; Franc, D.; Jullien, A. Sensitivity of the LCA allocation procedure for BFS recycled into pavement structures. Resour. Conserv. Recycl. 2010, 54, 348–358. [Google Scholar] [CrossRef]
  25. ECRPD. Energy Conservation in Road Pavement Design, Maintenance and Utilization; Intelligent Energy Europe: Brussels, Belgium, 2010. [Google Scholar]
  26. Gkatzoflias, D.; Kouridis, C.; Ntziachristos, L.; Samaras, Z. COPERT 4 Computer Programme to Calculate Emissions from Road Transport, User manual version 9.0; European Environment Agency: Copenhagen, Denmark, 2012. [Google Scholar]
  27. Goedkoop, M.; Heijungs, R.; Huijbregts, M.; De Schryver, A.; Struijs, J.; van Zelm, R. ReCiPe 2008 a Life Cycle Impact Assessment Method Which Comprises Harmonised Category Indicators at the Midpoint and the Endpoint Level. First Edition Report I: Characterisation. 2009. Available online: https://www.leidenuniv.nl/cml/ssp/publications/recipe_characterisation.pdf (accessed on 12 January 2019).
  28. EN (European Committee for Standardization). EN 15804:2012+A1:2013. Sustainability of Construction Works—Environmental Product Declarations—Core Rules for the Product Category of Construction Products; European Committee for Standardization: Brussels, Belgium, 2013. [Google Scholar]
  29. Hoang, T.; Durand, C.; Ventura, A.; Jullien, A.; Laurent, G. A Global Tool for Environmental Assessment of Roads—Application to Transport for Road Building; European Conference of Transport Research Institutes: Hague, The Netherlands, 2005. [Google Scholar]
  30. Ministero delle Infrastrutture e dei Trasporti. Norme Funzionali e Geometriche per la Costruzione Delle Strade; Italian Ministry of Transportation Decreto Ministeriale: Rome, Italy, 2001.
  31. CNR. Catalogo delle Pavimentazioni Stradali. Consiglio Nazionale delle Ricerche, Bollettino Ufficiale 178/95; Consiglio Nazionale delle Ricerche: Rome, Italy, 1995. [Google Scholar]
  32. Wernet, G.; Bauer, C.; Steubing, B.; Reinhard, J.; Moreno-Ruiz, E.; Weidema, B. The ecoinvent database version 3 (part I): Overview and methodology. Int. J. Life Cycle Assess. 2016, 21, 1218–1230. [Google Scholar] [CrossRef]
  33. SimaPro 8.0.5.13; Software SimaPro. Pré; Consultants: Amersfoort, The Netherlands, 2016.
  34. Di Mascio, P.; Moretti, L. Concrete vs Asphalt: Pavement and Lighting Costs in Italian Road Tunnels; ACI Special Publication 2018, SP 326, 71; American Concrete Institute: Farmington Hills, MI, USA, 2018. [Google Scholar]
  35. Moretti, L.; Cantisani, G.; Di Mascio, P. Management of road tunnels: Construction, maintenance and lighting costs. Tunn. Undergr. Space Technol. 2016, 51, 84–89. [Google Scholar] [CrossRef]
  36. Moretti, L.; Cantisani, G.; Di Mascio, P.; Caro, S. Technical and economic evaluation of lighting and pavement in Italian road tunnels. Tunn. Undergr. Space Technol. 2017, 65, 42–52. [Google Scholar] [CrossRef]
  37. Ente Nazionale Italiano di Normazione (UNI). UNI 11095:2011: Illuminazione Delle Gallerie Stradali; UNI: Milan, Italy, 2011. (In Italian) [Google Scholar]
  38. Ente Nazionale Italiano di Normazione (UNI). UNI 10439:2001: Illuminotecnica—Requisiti Illuminotecnici Delle Strade Con Traffico Motorizzato; UNI: Milan, Italy, 2001. (In Italian) [Google Scholar]
  39. Ente Nazionale Italiano di Normazione (UNI). UNI 11248:2012: Illuminazione Stradale—Selezione Delle Categorie Illuminotecniche; UNI: Milan, Italy, 2012. (In Italian) [Google Scholar]
  40. Ente Nazionale Italiano di Normazione (UNI). UNI EN 13201-2:2004: Illuminazione Stradale—Parte 2: Requisiti Prestazionali; UNI: Milan, Italy, 2004. (In Italian) [Google Scholar]
  41. European Commission. Commission Directive 2002/80/EC of 3 October 2002 Adapting to Technical Progress Council Directive 70/220/EEC Relating to Measures to be Taken against Air Pollution by Emissions from Motor Vehicles; European Commission: Brussels, Belgium, 2002. [Google Scholar]
  42. Stripple, H. Life Cycle Assessment of Road. A Pilot Study for Inventory Analysis, 2nd ed.; Report IVL Swedish Environmental Research Institute: Gothenburg, Sweden, 2001. [Google Scholar]
  43. Di Mascio, P.; Loprencipe, G.; Maggioni, F. Visco-elastic modeling for railway track structure layers. [Modellazione del comportamento visco-elastico degli strati della sede ferroviaria]. Ingegneria Ferroviaria 2014, 69, 207–222. [Google Scholar]
  44. Loprencipe, G.; Pantuso, A. A Specified Procedure for Distress Identification and Assessment for Urban Road Surfaces Based on PCI. Coatings 2017, 7, 65. [Google Scholar] [CrossRef]
  45. Zanghelini, G.M.; Cherubini, E.; Soares, S.R. How Multi-Criteria Decision Analysis (MCDA) is aiding Life Cycle Assessment (LCA) in results interpretation. J. Clean. Prod. 2018, 172, 609–622. [Google Scholar] [CrossRef]
  46. Benoit, V.; Rousseaux, P. Aid for aggregating the impacts in life cycle assessment. Int. J. Life Cycle Assess. 2003, 8, 74–82. [Google Scholar] [CrossRef]
  47. Albuquerque, G.A.; Maciel, P.; Lima, R.M.F.; Magnani, F. Strategic and tactical evaluation of conflicting environment and business goals in green supply chains. IEEE Trans. Syst. Man Cybern. Syst. 2013, 43, 1013–1027. [Google Scholar] [CrossRef]
Figure 1. Design cross section (unit of measure: cm).
Figure 1. Design cross section (unit of measure: cm).
Sustainability 11 00377 g001
Figure 2. Flow diagram of the phases (or modules) involved in LCIA.
Figure 2. Flow diagram of the phases (or modules) involved in LCIA.
Sustainability 11 00377 g002
Figure 3. Environmental performances—A1 to A3 phases.
Figure 3. Environmental performances—A1 to A3 phases.
Sustainability 11 00377 g003
Figure 4. Environmental performances—A1 to A4 phases.
Figure 4. Environmental performances—A1 to A4 phases.
Sustainability 11 00377 g004
Figure 5. Environmental performances—A1 to A4 phases of the amended scenario.
Figure 5. Environmental performances—A1 to A4 phases of the amended scenario.
Sustainability 11 00377 g005
Figure 6. Incidence of traffic volume on traffic contributions to ICs.
Figure 6. Incidence of traffic volume on traffic contributions to ICs.
Sustainability 11 00377 g006
Table 1. Passes of vehicles within the first 20 years of service life.
Table 1. Passes of vehicles within the first 20 years of service life.
Vehicle TypeMaximum Mass (t)Number of Passes
Commercial and heavy vehicles561,500,000
Cars315,000,000
Mopeds0.5189,000
Table 2. Traffic spectrum within the first 20 years of service life.
Table 2. Traffic spectrum within the first 20 years of service life.
Vehicle CodeMaximum Mass (t)Number of Passes during the Service Life
V112882,000
V216441,000
V32688,500
V43642,000
V5563000
V61343,500
Table 3. Impact categories considered in the LCA.
Table 3. Impact categories considered in the LCA.
Impact CategoryICUnit of Measure
Global Warming PotentialGWPkg CO2 eq.
Ozone layer Depletion PotentialODPkg CFC11-eq.
Acidification Potential of soil and waterAPkg SO2 eq.
Eutrophication PotentialEPkg PO43− eq.
Photochemical Ozone Creation PotentialPOCPkg C2H4 eq.
Depletion of abiotic resources-elementsADP-Ekg Sb eq.
Depletion of abiotic resources-fossil fuelsADP-FMJ
Table 4. Pavement maintenance.
Table 4. Pavement maintenance.
Type of MaintenanceYearExtension
Wearing + binder course milling and patching31% lanes’ surface
Wearing course milling and re-construction6100% lanes + shoulders surface
Wearing + binder course milling and patching92% lanes’ surface
Wearing + binder course milling and re-construction12100% lanes + shoulders surface
Table 5. Lighting design data.
Table 5. Lighting design data.
Lighting DataValue
Total installed power (W)84,295
Annual consumption (kWh)59,500
Table 6. Routine maintenance program for the lighting system.
Table 6. Routine maintenance program for the lighting system.
Type of WorkFrequency
Replacing of lampsonce every 10 years
Cleaning of lampsonce every 2.5 years
Table 7. Routine maintenance program for structures.
Table 7. Routine maintenance program for structures.
StructureType of WorkFrequency
BridgeDeck and crack sealingonce every 3 years
Clean and flush drainsonce every 2 years
Clean and reseal deck jointsonce every 10 years
Exposed steel cleaning and repaintingonce every 5 years
Remove, replace, repair tiles and spallsonce every 2 years
TunnelWash tunnel walls and ceilingonce every 1 year
Repair or replace deteriorated or failed jointsonce every 2 years
Clean and seal exposed barsonce every 4 years
Table 8. LCIA—A1 to A3 phases.
Table 8. LCIA—A1 to A3 phases.
ICImpact CategoryValueUnit of Measure
GWPGlobal Warming Potential3.58 × 108kg CO2 eq.
ODPOzone layer Depletion Potential48.38kg CFC11-eq.
APAcidification Potential of soil and water1.37 × 106kg SO2 eq.
EPEutrophication Potential3.94 × 105kg PO43− eq.
POCPPhotochemical Ozone Creation Potential3.03 × 105kg C2H4 eq.
ADP-EDepletion of abiotic resources-elements37.34kg Sb eq.
ADP-FDepletion of abiotic resources-fossil fuels3.44 × 109MJ
Table 9. LCIA—A4 phase.
Table 9. LCIA—A4 phase.
ICUnit of MeasureTrafficPavement and Structures MaintenanceTunnel Lighting ConsumptionTunnel Lighting Maintenance
GWPkg CO2 eq.1.44 × 1081.10 × 1072.03 × 1083.10 × 108
ODPkg CFC11-eq.1.06 × 1011.81 × 1003.60 × 1014.92 × 101
APkg SO2 eq.6.26 × 1054.34 × 1047.02 × 1051.05 × 106
EPkg PO43− eq.2.27 × 1051.18 × 1041.55 × 1052.92 × 105
POCPkg C2H4 eq.1.64 × 1059.16 × 1031.29 × 1053.03 × 105
ADP-Ekg Sb eq.1.95 × 1011.56 × 1012.51 × 1003.42 × 102
ADP-FMJ7.74 × 1081.40 × 1082.54 × 1093.46 × 109
Table 10. A1 to A4 LCIA of the amended scenario.
Table 10. A1 to A4 LCIA of the amended scenario.
ICValueUnit of Measure
GWP2.12 × 109kg CO2 eq.
ODP3.39 × 102kg CFC11-eq.
AP7.19 × 106kg SO2 eq.
EP2.01 × 106kg PO43− eq.
POCP2.02 × 106kg C2H4 eq.
ADP-E2.15 × 103kg Sb eq.
ADP-F2.33 × 1010MJ

Share and Cite

MDPI and ACS Style

Trunzo, G.; Moretti, L.; D’Andrea, A. Life Cycle Analysis of Road Construction and Use. Sustainability 2019, 11, 377. https://doi.org/10.3390/su11020377

AMA Style

Trunzo G, Moretti L, D’Andrea A. Life Cycle Analysis of Road Construction and Use. Sustainability. 2019; 11(2):377. https://doi.org/10.3390/su11020377

Chicago/Turabian Style

Trunzo, Giampiero, Laura Moretti, and Antonio D’Andrea. 2019. "Life Cycle Analysis of Road Construction and Use" Sustainability 11, no. 2: 377. https://doi.org/10.3390/su11020377

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop