[1]
Ali M. B., Sassi M., Gossa M., Harrath Y.: Simultaneous scheduling of production and maintenance tasks in the job shop, International Journal of Production Research, Vol. 49, No. 13 (2011), pp.3891-3918.
DOI: 10.1080/00207543.2010.492405
Google Scholar
[2]
Al-Hinai N, ElMekkawy T.Y.: Robust and flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm, Int Journal of Production Economics 132 (2011), pp.279-291.
DOI: 10.1016/j.ijpe.2011.04.020
Google Scholar
[3]
Goren S., Sabuncuoglu I.: Robustness and stability measures for scheduling: single-machine environment. IIE Transactions (2008) 40, pp.66-83.
DOI: 10.1080/07408170701283198
Google Scholar
[4]
Grabowik C., Kalinowski K., Paprocka I., Kempa W.: UML models of design and knowledge representation for technical production preparation needs. Advanced Materials Research, vol. 837 (2014), pp.369-374.
DOI: 10.4028/www.scientific.net/amr.837.369
Google Scholar
[5]
Gupta A. K., Sivakumar A. I., Simulation based multiobjective schedule optimization in semiconductor manufacturing. Proceedings of the 2002 winter simulation conference, (2002).
DOI: 10.1109/wsc.2002.1166480
Google Scholar
[6]
Gwiazda A.: Technical project management using quality methods, Journal of Achievements in Materials and Manufacturing Engineering, 31/2 (2008), pp.739-746.
Google Scholar
[7]
Hsu T., Dupas R., Jolly D., Goncalves G.: Evolution of mutatuion heuristics for the solving of multiobjective flexible job shop by an evolutionary algorithm. Proceedings of the 2002 IEEE international conference on systems, man and cyberentics, pp.6-9.
DOI: 10.1109/icsmc.2002.1176444
Google Scholar
[8]
Kalinowski K, Grabowik C., Kempa W., Paprocka I.: The graph representation of multivariant and complex processes for production scheduling. Advanced Materials Research, vol. 837 (2014), pp.422-427.
DOI: 10.4028/www.scientific.net/amr.837.422
Google Scholar
[9]
Lin Liu, Han-yu Gu, Yu-geng Xi, Robust and stable scheduling of a single machine with random machine breakdowns, Int J Adv. Manuf. Technol (2007) 31, 645-656.
DOI: 10.1007/s00170-005-0237-0
Google Scholar
[10]
Montusiewicz J., Evolutionary multi-criteria analysis in technical issues (in Polish). Institute of Fundamental Technological Research, W-wa, (2004).
Google Scholar
[11]
Paprocka I., Skołud B.: Robust scheduling, a production scheduling model of failures, Applied Mechanics and Materials Vol. 307 (2013), pp.443-446.
DOI: 10.4028/www.scientific.net/amm.307.443
Google Scholar
[12]
Paprocka I, Kempa W.: Modeling and simulation of a production system in order to reach a robust Schedule. Part I (in Polish), Przegląd Mechaniczny nr 2, 2013, s 28 -31.
Google Scholar
[13]
Paprocka I, Kempa W.: Modeling and simulation of a production system in order to reach a robust schedule : numerical example. Part II (in Polish), nr 3, 2013, s 22-26.
Google Scholar
[14]
Turkcan A., Akturk M.S., Robert H. Storer: Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties, IIE Transactions (2009) 41, p.1080 – 1095.
DOI: 10.1080/07408170902905995
Google Scholar