[1]
Z. Xie, S. Hao, G. Ye, G. Tan, A new algorithm for complex product flexible scheduling with constraint between jobs. Computers & Industrial Engineering, vol. 57 (2009), pp.766-772.
DOI: 10.1016/j.cie.2009.02.004
Google Scholar
[2]
P. Pongcharoen, C. Hicks, P.M. Braiden, D.J. Stewardson, Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products. International Journal of Production Economics, vol. 78 (2002), pp.311-322.
DOI: 10.1016/s0925-5273(02)00104-4
Google Scholar
[3]
K. Kalinowski, Decision making stages in production scheduling of complex products, Journal of Machine Engineering, vol. 11, no. 1-2, (2011), pp.68-77.
Google Scholar
[4]
W. Imrich, S. Klavzar, D.F. Rall, Topics in Graph Theory: Graphs and Their Cartesian Product. AK PETERS LTD. Wellesley, Massachusetts (2008).
Google Scholar
[5]
J.L. Gross, J. Yellen, Graph Theory and Its Applications. Chapman & Hall/CRC, (2006).
Google Scholar
[6]
T. Dzitkowski, A. Dymarek, Active synthesis of machine drive systems using a comparative method. Journal of Vibroengineering 14 (2) 2012, pp.528-533.
Google Scholar
[7]
C. Grabowik, D. Krenczyk, K. Kalinowski, The hybrid method of knowledge representation in a CAPP knowledge based system. Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 7209 LNAI (PART 2), (2012).
DOI: 10.1007/978-3-642-28931-6_28
Google Scholar
[8]
C. Grabowik, K. Kalinowski, Object-oriented models in an integration of CAD/CAPP/CAP systems. Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 6679 LNAI (PART 2), (2011).
DOI: 10.1007/978-3-642-21222-2_49
Google Scholar
[9]
W. Janik, P. Gendarz, Disassembly and aggregation in computer aided overhaul preparation, Journal of Achievements in Materials and Manufacturing Engineering, 44/2 (2011), pp.187-197.
Google Scholar
[10]
G. Ćwikła, Elements and systems allowing acquisition, analysis and presentation of production data (in Polish). Innowacje w Zarządzaniu i Inżynierii Produkcji, Tom I. Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją, Opole 2012, pp.780-789.
Google Scholar
[11]
K. Kalinowski, D. Krenczyk, C. Grabowik, Predictive-reactive strategy for real time scheduling of manufacturing systems. Applied Mechanics and Materials, 307 (2013), pp.470-473.
DOI: 10.4028/www.scientific.net/amm.307.470
Google Scholar
[12]
I. Paprocka, B. Skołud, Robust scheduling, a production scheduling model of failures, Applied Mechanics and Materials, vol. 307 (2013), pp.443-446.
DOI: 10.4028/www.scientific.net/amm.307.443
Google Scholar
[13]
J. Świder, M. Hetmańczyk, P. Michalski, Utilization of advanced self-diagnostic functions implemented in frequency inverters for the purpose of the computer-aided identification of operating conditions. Journal of Vibroengineering, 14 (1) (2012).
Google Scholar
[14]
D. Krenczyk, K. Kalinowski, C. Grabowik, Integration production planning and scheduling systems for determination of transitional phases in repetitive production. Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 7209 LNAI (PART 2), (2012).
DOI: 10.1007/978-3-642-28931-6_27
Google Scholar
[15]
K. Kalinowski, The scheduling of discrete production processes. (in Polish) Wydawnictwo Politechniki Śląskiej, Gliwice (2013).
Google Scholar
[16]
R. Marinescu, R. Dechter, AND/OR Tree Search for Constraint Optimization. Proceedings of the 6th International Workshop on Preferences and Soft Constraints, Toronto (2004).
Google Scholar