Ground Treatment and its Application in Shallow Subway Tunnel Crossing Urban River by Shield Tunneling Method

Article Preview

Abstract:

On the basis of the geological and environmental conditions of surrounding rock around a shallow subway tunnel used to cross a river in Chengdu subway line one, the ground treatment technique such as uplift piles, cast-in-place reinforced concrete slabs and site grouting have been summarized in the paper. The riverbed above shallow shield tunnel is reinforced with covering slabs and uplift piles; meanwhile, the surrounding rock is reinforced with cement and sodium silicate grout by high pressure grouting method conducted inside the tunnel. The practice of the scenario presented in the paper turns out to be a great success and shows that the treatment technique can be used to guide the design and construction of ground reinforcement for shallow tunnel used to cross urban rivers in subway lines by shield tunneling method under similar conditions.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 919-921)

Pages:

853-856

Citation:

Online since:

April 2014

Authors:

Export:

Price:

[1] Zhou Xiaojun, Wang Jinghe, Hu Hongyun. Design of Enclosure for Subway Station Foundation Pit in Southward Extension Line of Chengdu Metro Line One. Advanced Materials Research 2013, Vols: 671-674, pp.1122-1125.

DOI: 10.4028/www.scientific.net/amr.671-674.1122

Google Scholar

[2] Zhou Xiaojun, Zhou Jiamei. Urban Metro and Light Rail Transit (in Chinese). Chengdu: Southwest Jiaotong University Press, (2012).

Google Scholar

[3] Zhou Xiaojun, Hu Hongyun, Wang Xiaofeng. Design of a Subway Station Crossing Urban Trunk Road by Open Cut and Tunneling method. The 4th international Conference on Digital Manufacturing & Automation, 2013, IEEE computer society, pp: 457-460.

DOI: 10.1109/icdma.2013.107

Google Scholar

[4] Zhou Xiaojun, Yang Changyu, Wang Jinghe, Yu Xueying. Study on structural design and construction procedure for a triple arch railway tunnel. The 4th International Conference on Digital Manufacturing & Automation, 2013, IEEE computer society, pp: 1299-1301.

DOI: 10.1109/icdma.2013.309

Google Scholar

[5] Zhou Xiaojun, Yu Heran, Hu Hongyun, Wang Xaiofeng, Cao Yaodong. Design and Construction of Shaft for Xijiang Shield Tunnel in the Pipeline Project of Guangdong Provincial Natural Gas Grid (in Chinese). Chinese Journal of Underground Space and Engineering. Vol. 9, No. 4 pp.0884-0895, (2013).

DOI: 10.1061/9780784413142.061

Google Scholar