Skip to main content

2015 | OriginalPaper | Buchkapitel

7. Load Frequency Control Considering Very Short-term Load Prediction and Economic Load Dispatch Using Neural Network and Its Application

verfasst von : Kalyan Chatterjee, Ravi Shankar, T. K. Chatterjee

Erschienen in: Systems Thinking Approach for Social Problems

Verlag: Springer India

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The paper presents a new technique for the load frequency control (LFC) of interconnected power system. The LFC system monitors, at a minimum, power system frequency, generator output, net interchange schedule and tie-line power flows. It compares the actual frequency and tie-line values to the desired or scheduled values and generates an error value called the area control error (ACE). ACE is the instantaneous estimate of load demand in the area. However, due to relatively fast area load demand fluctuations and the relatively slow area generation response rate, only the instantaneous estimate of load demand cannot provide us with a good dynamic response. For this purpose, a look-ahead load forecasting feature is needed for effective LFC. To improve performance for LFC strategies neural network use for very short-term load prediction. From this forecasted load every 5-min ahead find out load change or error of the system can be recorded. This total load change divided all the units by concept of the unit’s participation factor. Because of load is always changing so a fixed integral controller is not suitable for LFC, a fuzzy logic controller is used for this purpose.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Ahamad TP, NagendraRao PS, Sastry PS (2002) A reinforcement learning approach to automatic generation control. Electr Power Syst Res 63:9–26 Ahamad TP, NagendraRao PS, Sastry PS (2002) A reinforcement learning approach to automatic generation control. Electr Power Syst Res 63:9–26
2.
Zurück zum Zitat Akirtzis AG, Theocharis JB, Kiartzis SJ, Satsios KJ (1995) Short term load forecasting using fuzzy neural network. IEEE Trans Power Syst 10(3):1518–1524 Akirtzis AG, Theocharis JB, Kiartzis SJ, Satsios KJ (1995) Short term load forecasting using fuzzy neural network. IEEE Trans Power Syst 10(3):1518–1524
3.
Zurück zum Zitat Asar A, Mcdonald JR (1994) A specification of neural network application in the load forecasting problem. IEEE Trans Control Syst Technol 2(2):135–141 Asar A, Mcdonald JR (1994) A specification of neural network application in the load forecasting problem. IEEE Trans Control Syst Technol 2(2):135–141
4.
Zurück zum Zitat Bakirtzis RC, Petridis V, Klartiz SJ, Alexladls MC (1996) A neural network short term load forecasting model for greek power system. IEEE Trans Power Syst 11:858–863 Bakirtzis RC, Petridis V, Klartiz SJ, Alexladls MC (1996) A neural network short term load forecasting model for greek power system. IEEE Trans Power Syst 11:858–863
5.
Zurück zum Zitat Chown GA, Hartman RC (1998) Design and experience with a fuzzy logic controller for automatic generation control. IEEE Trans Power Syst 13(3):965–970 Chown GA, Hartman RC (1998) Design and experience with a fuzzy logic controller for automatic generation control. IEEE Trans Power Syst 13(3):965–970
6.
Zurück zum Zitat Danishi H, Daneshi A (2008) Real time load forecasting in power system. In: DPRT 2008, Nanjing, 6–9 Apr 2008 Danishi H, Daneshi A (2008) Real time load forecasting in power system. In: DPRT 2008, Nanjing, 6–9 Apr 2008
7.
Zurück zum Zitat Elgerd OE (1982) Electric energy systems theory, 2nd edn. McGraw Hill, New York, pp 315–389 Elgerd OE (1982) Electric energy systems theory, 2nd edn. McGraw Hill, New York, pp 315–389
8.
Zurück zum Zitat Elgerd OL, Fosla CE (1970) Optimum megawatt frequency control of multi-area electric energy systems. IEEE Trans Power Apparatus Syst PAS-89(4):556–563 Elgerd OL, Fosla CE (1970) Optimum megawatt frequency control of multi-area electric energy systems. IEEE Trans Power Apparatus Syst PAS-89(4):556–563
9.
Zurück zum Zitat El-Hawary ME (1998) Electric power applications of fuzzy systems, Chap. 5. Series on power engineering. IEEE Press, New York, pp 112–148 El-Hawary ME (1998) Electric power applications of fuzzy systems, Chap. 5. Series on power engineering. IEEE Press, New York, pp 112–148
10.
Zurück zum Zitat El-Naggar MK, Al-Rumaih AK (2007) Electric load forecasting using genetic based algorithm, optimal filter estimator and least error squares technique: comparative study. World Acad Sci Eng Technol 6:945–949 El-Naggar MK, Al-Rumaih AK (2007) Electric load forecasting using genetic based algorithm, optimal filter estimator and least error squares technique: comparative study. World Acad Sci Eng Technol 6:945–949
11.
Zurück zum Zitat Farook S, Sangamasmeswara Raju P (2011) Optimization of feedback controller in restructured power system using evolutionary genetic algorithm. Int J Eng Sci Technol 3(5):4074–4083 Farook S, Sangamasmeswara Raju P (2011) Optimization of feedback controller in restructured power system using evolutionary genetic algorithm. Int J Eng Sci Technol 3(5):4074–4083
12.
Zurück zum Zitat Hippert HS, Pedriera CE, Souza RC (2001) Neural networks for short-term load forecasting: a review and evaluation. IEEE Trans Power Syst 16(1):44–55 Hippert HS, Pedriera CE, Souza RC (2001) Neural networks for short-term load forecasting: a review and evaluation. IEEE Trans Power Syst 16(1):44–55
14.
Zurück zum Zitat IEEE Committee Report (1973) Dynamic models for steam and hydro turbines in power system studies. Trans Power Apparatus Syst 92(6):1904–915 IEEE Committee Report (1973) Dynamic models for steam and hydro turbines in power system studies. Trans Power Apparatus Syst 92(6):1904–915
15.
Zurück zum Zitat Karnavas YL, Papadopoulos DP (2002) AGC for autonomous power system using combined intelligent techniques. Electr Power Syst Res 62:225–239CrossRef Karnavas YL, Papadopoulos DP (2002) AGC for autonomous power system using combined intelligent techniques. Electr Power Syst Res 62:225–239CrossRef
16.
Zurück zum Zitat Khan MR, Abraham A (2003) Short term load forecasting models in Czech Republic using soft computing paradigm. Int J Knowl Based Intell Eng Syst 7(4):172–179 Khan MR, Abraham A (2003) Short term load forecasting models in Czech Republic using soft computing paradigm. Int J Knowl Based Intell Eng Syst 7(4):172–179
17.
Zurück zum Zitat Kothari ML, Nanda J, Kothari DP, Das D (1988) Discrete-mode automatic generation control of a two-area reheat thermal system with new area control error. IEEE Trans Power Syst 4(2):1988–1994 Kothari ML, Nanda J, Kothari DP, Das D (1988) Discrete-mode automatic generation control of a two-area reheat thermal system with new area control error. IEEE Trans Power Syst 4(2):1988–1994
18.
Zurück zum Zitat Kundur P (1994) Power system stability and control. McGraw Hill, New York Kundur P (1994) Power system stability and control. McGraw Hill, New York
19.
Zurück zum Zitat Lu CN, Vemuri S (1993) Neural network for short-term load forecasting. IEEE Trans Power Syst 8(8):336–342 Lu CN, Vemuri S (1993) Neural network for short-term load forecasting. IEEE Trans Power Syst 8(8):336–342
20.
Zurück zum Zitat Lui K, Subbarayan S, Shoults R, Manery MT, Kwan C, Lewis FL, Naccarion J (1996) Comparison of very short-term load forecasting techniques. IEEE Trans Power Syst 11:877–882 Lui K, Subbarayan S, Shoults R, Manery MT, Kwan C, Lewis FL, Naccarion J (1996) Comparison of very short-term load forecasting techniques. IEEE Trans Power Syst 11:877–882
21.
Zurück zum Zitat Moghram I, Rahman S (1989) Analysis and evaluation of five short term load forecasting techniques. IEEE Trans Power Syst 4(4):1484–1491 Moghram I, Rahman S (1989) Analysis and evaluation of five short term load forecasting techniques. IEEE Trans Power Syst 4(4):1484–1491
22.
Zurück zum Zitat Ramakrishna KS, Sharma P, Bhatti PS (2010) Automatic generation control of interconnected power system with diverse sources of power generation. Int J Eng Sci Technol 2(5):51–65 Ramakrishna KS, Sharma P, Bhatti PS (2010) Automatic generation control of interconnected power system with diverse sources of power generation. Int J Eng Sci Technol 2(5):51–65
23.
Zurück zum Zitat Rothe JP, Wadhwani AK, Wadhwani S (2009) Short term load forecasting using multi parameter regression. Int J Comput Sci Inf Secur 6(2):303–306 Rothe JP, Wadhwani AK, Wadhwani S (2009) Short term load forecasting using multi parameter regression. Int J Comput Sci Inf Secur 6(2):303–306
24.
Zurück zum Zitat Senjyu T, Uazato T, Higa P (1998) Future load curve shaping based on similarities using fuzzy logic approach. IEE Proc Gener Transm Distrib 145(4):375–380 Senjyu T, Uazato T, Higa P (1998) Future load curve shaping based on similarities using fuzzy logic approach. IEE Proc Gener Transm Distrib 145(4):375–380
25.
Zurück zum Zitat Shulte RP (1996) An automatic generation control modification for present demands on interconnected power systems. IEEE Trans Power Syst 11:1286–1294 Shulte RP (1996) An automatic generation control modification for present demands on interconnected power systems. IEEE Trans Power Syst 11:1286–1294
26.
Zurück zum Zitat Talaq J, Al-Basri F (1999) Adaptive fuzzy gain scheduling for load frequency control. IEEE Trans Power Syst 14:145–150CrossRef Talaq J, Al-Basri F (1999) Adaptive fuzzy gain scheduling for load frequency control. IEEE Trans Power Syst 14:145–150CrossRef
27.
Zurück zum Zitat Tripathy SC, Hope GS, Malik OP (1982) Optimization of load-frequency control parameters for power systems with reheat steam turbines and governor dead band nonlinearity. IEE Proc Gener Transm Distrib 129(1):10–16 Tripathy SC, Hope GS, Malik OP (1982) Optimization of load-frequency control parameters for power systems with reheat steam turbines and governor dead band nonlinearity. IEE Proc Gener Transm Distrib 129(1):10–16
28.
Zurück zum Zitat Trudnowski J, McReynold L, Jonson J (2001) Real-time very short-term load prediction for power-system automatic generation control. IEEE Trans Control Syst Technol 9(2):254–260 Trudnowski J, McReynold L, Jonson J (2001) Real-time very short-term load prediction for power-system automatic generation control. IEEE Trans Control Syst Technol 9(2):254–260
29.
Zurück zum Zitat Wood AJ, Woolenberg BF (1998) Power generation operation and control. Wiley, New York Wood AJ, Woolenberg BF (1998) Power generation operation and control. Wiley, New York
30.
Zurück zum Zitat Yager RR, Filev DP (1994) Essentials of fuzzy modelling and control. Wiley, New York Yager RR, Filev DP (1994) Essentials of fuzzy modelling and control. Wiley, New York
Metadaten
Titel
Load Frequency Control Considering Very Short-term Load Prediction and Economic Load Dispatch Using Neural Network and Its Application
verfasst von
Kalyan Chatterjee
Ravi Shankar
T. K. Chatterjee
Copyright-Jahr
2015
Verlag
Springer India
DOI
https://doi.org/10.1007/978-81-322-2141-8_7