Abstract

Integrated project delivery (IPD) has been able to optimize the value for money for the owner by integrating diverse talents from the earliest design stage. The nucleus that contributed to the superior IPD performances is multi-agent risk/reward sharing incentive (RRSI). By overviewing the RRSI, four issues (i.e. setting target cost, incentives for non-cost performances, sharing ratios and caps of risk/reward) are important to IPD participants who involve RRSI. Moreover, a closer inspection of the multi-agent RRSI for IPD revealed that compared to any other procurement strategy, IPD has designed its RRSI with (1) a larger size of risk/reward pool, and (2) a greater amount of incentive pool. This explains why IPD empowers to achieve an effective multidisciplinary integration. However, not all the parties are inclined to join the RRSI, due to risk aversion or the concern of “inequity”. To increase the participants’ willingness to join the multi-agent RRSI, an optimum sharing model is proposed. With the application of concepts from cooperative game theory and prospect theory, the model can competently incorporate fairness in an optimum sharing of risk/reward. This chapter is helpful for the industry practitioners who are interested in the use of multi-agent RRSI in IPD projects.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Aashto Subcommittee on Construction. (2000). Constructability review best practices guides. Construction (August). Aashto Subcommittee on Construction. (2000). Constructability review best practices guides. Construction (August).
Zurück zum Zitat Ahmad, I., Azhar, N., & Chowdhury, A. (2019). Enhancement of IPD characteristics as impelled by information and communication technology. Journal of Management in Engineering, 35(1), 4018055. CrossRef Ahmad, I., Azhar, N., & Chowdhury, A. (2019). Enhancement of IPD characteristics as impelled by information and communication technology. Journal of Management in Engineering, 35(1), 4018055. CrossRef
Zurück zum Zitat Ahmed, M. O., Abdul Nabi, M., El-adaway, I. H., Caranci, D., Eberle, J., Hawkins, Z., & Sparrow, R. (2021). Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11), 5021008. CrossRef Ahmed, M. O., Abdul Nabi, M., El-adaway, I. H., Caranci, D., Eberle, J., Hawkins, Z., & Sparrow, R. (2021). Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11), 5021008. CrossRef
Zurück zum Zitat AIA National and AIA California Council. (2009). Experiences in collaboration—On the path to IPD. Washington, DC, pp. 1–17. AIA National and AIA California Council. (2009). Experiences in collaboration—On the path to IPD. Washington, DC, pp. 1–17.
Zurück zum Zitat AIA National and AIA California Council. (2007). Integrated project delivery: A guide. AIA National and AIA California Council. AIA National and AIA California Council. (2007). Integrated project delivery: A guide. AIA National and AIA California Council.
Zurück zum Zitat American Institute of Architects. (2008). AIA Document C195—2008, standard form single purpose entity agreement for integrated project delivery, exhibit D (Work Plan). AIA. Washington, DC, Sacramento, CA. American Institute of Architects. (2008). AIA Document C195—2008, standard form single purpose entity agreement for integrated project delivery, exhibit D (Work Plan). AIA. Washington, DC, Sacramento, CA.
Zurück zum Zitat American Institute of Architects (AIA). (2009). AIA Document C191 TM —2009, Standard form multi-party agreement for integrated project delivery. AIA. Washington, DC. American Institute of Architects (AIA). (2009). AIA Document C191 TM —2009, Standard form multi-party agreement for integrated project delivery. AIA. Washington, DC.
Zurück zum Zitat American Institute of Architects. (AIA). California Council (2007) Integrated project delivery: A working definition. Sacramento, CA. American Institute of Architects. (AIA). California Council (2007) Integrated project delivery: A working definition. Sacramento, CA.
Zurück zum Zitat Ashcraft, H.W. (2011) “Negotiating an Integrated Project Delivery Agreement”. in Hanson Bridgett LLP. Hanson Bridgett LLP, 1–34 Ashcraft, H.W. (2011) “Negotiating an Integrated Project Delivery Agreement”. in Hanson Bridgett LLP. Hanson Bridgett LLP, 1–34
Zurück zum Zitat Asmar, M. E., Asce, A. M., Hanna, A. S., Ph, D., Asce, F., Loh, W., Ph, D., & Asce, A. M. (2016). Evaluating integrated project delivery using the project quarterback rating 3. Journal of Construction Engineering and Management, 142(1), 1–13. CrossRef Asmar, M. E., Asce, A. M., Hanna, A. S., Ph, D., Asce, F., Loh, W., Ph, D., & Asce, A. M. (2016). Evaluating integrated project delivery using the project quarterback rating 3. Journal of Construction Engineering and Management, 142(1), 1–13. CrossRef
Zurück zum Zitat Azhar, N., Kang, Y., & Ahmad, I. (2015). Critical look into the relationship between information and communication technology and integrated project delivery in public sector construction. Journal of Management in Engineering, 31(5). Azhar, N., Kang, Y., & Ahmad, I. (2015). Critical look into the relationship between information and communication technology and integrated project delivery in public sector construction. Journal of Management in Engineering, 31(5).
Zurück zum Zitat Boukendour, S., & Hughes, W. (2014). Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), 279–289. CrossRef Boukendour, S., & Hughes, W. (2014). Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), 279–289. CrossRef
Zurück zum Zitat Cheng, R. (2016) MOTIVATION AND MEANS: How and why IPD and lean lead to success. <Research report> Cheng, R. (2016) MOTIVATION AND MEANS: How and why IPD and lean lead to success. <Research report>
Zurück zum Zitat Cheng, R., Dale, K., Aspenson, A., & Salmela, K. (2012). IPD case studies. AIA, AIA Minnesota, School of Architecture—University of Minnesota. Cheng, R., Dale, K., Aspenson, A., & Salmela, K. (2012). IPD case studies. AIA, AIA Minnesota, School of Architecture—University of Minnesota.
Zurück zum Zitat Cohen, J. (2010). Integrated project delivery: Case studies. In AIA National, AIA California Council, AGC California and McGraw-Hill. Cohen, J. (2010). Integrated project delivery: Case studies. In AIA National, AIA California Council, AGC California and McGraw-Hill.
Zurück zum Zitat ConsensusDocs LLC (2012). ConsensusDocs Guidebook. (April). ConsensusDocs LLC (2012). ConsensusDocs Guidebook. (April).
Zurück zum Zitat Dal Gallo, L., O’Leary, S. T., & Louridas, L .J. (2009). Comparison of integrated project delivery agreements. Dal Gallo, L., O’Leary, S. T., & Louridas, L .J. (2009). Comparison of integrated project delivery agreements.
Zurück zum Zitat Darrington, J. W., & Lichtig, W. A. (2010). Rethinking the ‘G ’ in GMP: Why estimated maximum price contracts make sense on collaborative projects. The Construction Lawyer, 30(2), 1–12. Darrington, J. W., & Lichtig, W. A. (2010). Rethinking the ‘G ’ in GMP: Why estimated maximum price contracts make sense on collaborative projects. The Construction Lawyer, 30(2), 1–12.
Zurück zum Zitat Department of Treasury and Finance (2010) The Practitioners ’ Guide to Alliance Contracting. (October). Victoria Department of Treasury and Finance (2010) The Practitioners ’ Guide to Alliance Contracting. (October). Victoria
Zurück zum Zitat Durdyev, S., Hosseini, M. R., Martek, I., Ismail, S., & Arashpour, M. (2019). Barriers to the use of integrated project delivery (IPD): A quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(1), 186–204. CrossRef Durdyev, S., Hosseini, M. R., Martek, I., Ismail, S., & Arashpour, M. (2019). Barriers to the use of integrated project delivery (IPD): A quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(1), 186–204. CrossRef
Zurück zum Zitat El-adaway, I., Abotaleb, I., & Eteifa, S. (2017). Framework for multiparty relational contracting. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(3), 4517018. CrossRef El-adaway, I., Abotaleb, I., & Eteifa, S. (2017). Framework for multiparty relational contracting. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(3), 4517018. CrossRef
Zurück zum Zitat El Asmar, M., Hanna, A. S., & Loh, W. (2013). Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11), 1–14. CrossRef El Asmar, M., Hanna, A. S., & Loh, W. (2013). Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11), 1–14. CrossRef
Zurück zum Zitat Elghaish, F., Abrishami, S., & Hosseini, M. R. (2020). (2020) Integrated project delivery with blockchain: An automated financial system. Automation in Construction, 114, 103182. CrossRef Elghaish, F., Abrishami, S., & Hosseini, M. R. (2020). (2020) Integrated project delivery with blockchain: An automated financial system. Automation in Construction, 114, 103182. CrossRef
Zurück zum Zitat Elghaish, F., Pour Rahimian, F., Brooks, T., Dawood, N., & Abrishami, S. (2023). Web-based management system to share risk/reward for IPD projects. In Blockchain of things and deep learning applications in construction. Springer, pp. 83–97. Elghaish, F., Pour Rahimian, F., Brooks, T., Dawood, N., & Abrishami, S. (2023). Web-based management system to share risk/reward for IPD projects. In Blockchain of things and deep learning applications in construction. Springer, pp. 83–97.
Zurück zum Zitat Forbes, L. H., & Ahmed, S. M. (2010). Modern construction: Lean project delivery and integrated practices. CRC Press. CrossRef Forbes, L. H., & Ahmed, S. M. (2010). Modern construction: Lean project delivery and integrated practices. CRC Press. CrossRef
Zurück zum Zitat Hall, D., & Scott, W. R. (2016). Early stages in the institutionalization of integrated project delivery. Hall, D., & Scott, W. R. (2016). Early stages in the institutionalization of integrated project delivery.
Zurück zum Zitat Hall, D. M., & Bonanomi, M. M. (2021). Governing collaborative project delivery as a common-pool resource scenario. Project Management Journal, 52(3), 250–263. CrossRef Hall, D. M., & Bonanomi, M. M. (2021). Governing collaborative project delivery as a common-pool resource scenario. Project Management Journal, 52(3), 250–263. CrossRef
Zurück zum Zitat Han, J., Rapoport, A., & Fong, P. S. W. (2019). Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(1), 49–65. CrossRef Han, J., Rapoport, A., & Fong, P. S. W. (2019). Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(1), 49–65. CrossRef
Zurück zum Zitat Hanna, A. S. (2016). Benchmark performance metrics for integrated project delivery. Journal of Construction Engineering and Management, 142(9), 04016040. CrossRef Hanna, A. S. (2016). Benchmark performance metrics for integrated project delivery. Journal of Construction Engineering and Management, 142(9), 04016040. CrossRef
Zurück zum Zitat Hosseinian, M., Farahpour, E., & Carmichael, D. G. (2020). Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7), 4020067. CrossRef Hosseinian, M., Farahpour, E., & Carmichael, D. G. (2020). Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7), 4020067. CrossRef
Zurück zum Zitat Hughes, D., Williams, T., & Ren, Z. (2012). Is incentivisation significant in ensuring successful partnered projects? Engineering, Construction and Architectural Management, 19(3), 306–319. CrossRef Hughes, D., Williams, T., & Ren, Z. (2012). Is incentivisation significant in ensuring successful partnered projects? Engineering, Construction and Architectural Management, 19(3), 306–319. CrossRef
Zurück zum Zitat Hunhevicz, J. J., Brasey, P. -A., Bonanomi, M. M. M., & Hall, D. (2020). Blockchain and smart contracts for integrated project delivery: Inspiration from the commons. EPOC 2020 Working Paper Proceedings. Hunhevicz, J. J., Brasey, P. -A., Bonanomi, M. M. M., & Hall, D. (2020). Blockchain and smart contracts for integrated project delivery: Inspiration from the commons. EPOC 2020 Working Paper Proceedings.
Zurück zum Zitat Hunhevicz, J. J., & Hall, D. M. (2019). Managing mistrust in construction using DLT: A review of use-case categories for technical design decisions. In Proceedings of the European Conference for Computing in Construction. held 2019, pp. 100–109. Hunhevicz, J. J., & Hall, D. M. (2019). Managing mistrust in construction using DLT: A review of use-case categories for technical design decisions. In Proceedings of the European Conference for Computing in Construction. held 2019, pp. 100–109.
Zurück zum Zitat Ibrahim, M. W., Hanna, A., & Kievet, D. (2020). Quantitative comparison of project performance between project delivery systems. Journal of Management in Engineering, 36(6), 4020082. CrossRef Ibrahim, M. W., Hanna, A., & Kievet, D. (2020). Quantitative comparison of project performance between project delivery systems. Journal of Management in Engineering, 36(6), 4020082. CrossRef
Zurück zum Zitat Kagioglou, M., & Tzortzopoulos, P. (2010). Improving healthcare through built environment infrastructure. Wiley. CrossRef Kagioglou, M., & Tzortzopoulos, P. (2010). Improving healthcare through built environment infrastructure. Wiley. CrossRef
Zurück zum Zitat Kent, D. C., Asce, S. M., Becerik-gerber, B., & Asce, A. M. (2010). Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management (August), 815–825. Kent, D. C., Asce, S. M., Becerik-gerber, B., & Asce, A. M. (2010). Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management (August), 815–825.
Zurück zum Zitat Lahdenperä, P. (2012). Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), 57–79. CrossRef Lahdenperä, P. (2012). Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), 57–79. CrossRef
Zurück zum Zitat Lahdenperä, P. (2010). Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), 783–796. CrossRef Lahdenperä, P. (2010). Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), 783–796. CrossRef
Zurück zum Zitat Laryea, S., & Watermeyer, R. (2016). Early contractor involvement in framework contracts. In Proceedings of the 24th Annual Conference of the International Group for Lean Construction, held 2016 at Boston, MA, USA, pp. 13–22. Laryea, S., & Watermeyer, R. (2016). Early contractor involvement in framework contracts. In Proceedings of the 24th Annual Conference of the International Group for Lean Construction, held 2016 at Boston, MA, USA, pp. 13–22.
Zurück zum Zitat Latham, M. (1994). Constructing the Team. HM Stationery Office London. Latham, M. (1994). Constructing the Team. HM Stationery Office London.
Zurück zum Zitat Lichtig, W. (2005a). Sutter health: Developing a contracting model to support lean project delivery. Lean Construction Journal, 2(1), 105–112. Lichtig, W. (2005a). Sutter health: Developing a contracting model to support lean project delivery. Lean Construction Journal, 2(1), 105–112.
Zurück zum Zitat Lichtig, W. (2005b). Integrated Form of Agreement for Integrated Lean Project Delivery Among Owner, Architect & CM/GC. Lichtig, W. (2005b). Integrated Form of Agreement for Integrated Lean Project Delivery Among Owner, Architect & CM/GC.
Zurück zum Zitat Ling, F. Y. Y., Teo, P. X., Li, S., Zhang, Z., & Ma, Q. (2020). Adoption of integrated project delivery practices for superior project performance. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(4), 5020014. CrossRef Ling, F. Y. Y., Teo, P. X., Li, S., Zhang, Z., & Ma, Q. (2020). Adoption of integrated project delivery practices for superior project performance. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(4), 5020014. CrossRef
Zurück zum Zitat Liu, J., & Cheah, C. Y. J. (2009). Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), 331–342. CrossRef Liu, J., & Cheah, C. Y. J. (2009). Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), 331–342. CrossRef
Zurück zum Zitat Liu, J., Gao, R., Cheah, C. Y. J., & Luo, J. (2016). Incentive mechanism for inhibiting investors’ opportunistic behavior in PPP projects. International Journal of Project Management, 34(7), 1102–1111. CrossRef Liu, J., Gao, R., Cheah, C. Y. J., & Luo, J. (2016). Incentive mechanism for inhibiting investors’ opportunistic behavior in PPP projects. International Journal of Project Management, 34(7), 1102–1111. CrossRef
Zurück zum Zitat Liu, J., Yu, X., & Cheah, C. Y. J. (2014). Evaluation of restrictive competition in PPP projects using real option approach. International Journal of Project Management, 32(3), 473–481. CrossRef Liu, J., Yu, X., & Cheah, C. Y. J. (2014). Evaluation of restrictive competition in PPP projects using real option approach. International Journal of Project Management, 32(3), 473–481. CrossRef
Zurück zum Zitat Lostuvali, B., da Alves, T., & C.L., and Modrich, R.-U. (2014). Learning from the Cathedral hill hospital project during the design and preconstruction phases. International Journal of Construction Education and Research, 10(3), 160–180. CrossRef Lostuvali, B., da Alves, T., & C.L., and Modrich, R.-U. (2014). Learning from the Cathedral hill hospital project during the design and preconstruction phases. International Journal of Construction Education and Research, 10(3), 160–180. CrossRef
Zurück zum Zitat Love, P. E. D., Davis, P. R., Chevis, R., & Edwards, D. J. (2011). Risk/reward compensation model for civil engineering infrastructure alliance projects. Journal of Construction Engineering and Management, 137(2), 127–136. CrossRef Love, P. E. D., Davis, P. R., Chevis, R., & Edwards, D. J. (2011). Risk/reward compensation model for civil engineering infrastructure alliance projects. Journal of Construction Engineering and Management, 137(2), 127–136. CrossRef
Zurück zum Zitat Ma, Q., Li, S., & Cheung, S. O. (2022a). Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1), 4021180. CrossRef Ma, Q., Li, S., & Cheung, S. O. (2022a). Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1), 4021180. CrossRef
Zurück zum Zitat Ma, Q., Shan, L., Teo, P. X., & Ling, F. Y. Y. (2022b). Barriers to adopting integrated project delivery practices. Engineering Construction and Architectural Management ahead-of-p (ahead-of-print). Ma, Q., Shan, L., Teo, P. X., & Ling, F. Y. Y. (2022b). Barriers to adopting integrated project delivery practices. Engineering Construction and Architectural Management ahead-of-p (ahead-of-print).
Zurück zum Zitat Ma, Z., & Ma, J. (2017). Formulating the application functional requirements of a BIM-based collaboration platform to support IPD projects. KSCE Journal of Civil Engineering, 21(6), 2011–2026. CrossRef Ma, Z., & Ma, J. (2017). Formulating the application functional requirements of a BIM-based collaboration platform to support IPD projects. KSCE Journal of Civil Engineering, 21(6), 2011–2026. CrossRef
Zurück zum Zitat Matthews, O., & Howell, G. A. (2005). Integrated project delivery an example of relational contracting. Lean Construction Journal, 2(1), 46–61. Matthews, O., & Howell, G. A. (2005). Integrated project delivery an example of relational contracting. Lean Construction Journal, 2(1), 46–61.
Zurück zum Zitat Mauck, R., Lichtig, W. A., Christian, D. R., & Darrington, J. (2009). Integrated project delivery: Different outcomes, different rules. In The 48th Annual Meeting of Invited Attorneys. held 2009. Victor O. Schinnerer & Company, Inc., pp 105–128. Mauck, R., Lichtig, W. A., Christian, D. R., & Darrington, J. (2009). Integrated project delivery: Different outcomes, different rules. In The 48th Annual Meeting of Invited Attorneys. held 2009. Victor O. Schinnerer & Company, Inc., pp 105–128.
Zurück zum Zitat Medda, F. (2007). A game theory approach for the allocation of risks in transport public private partnerships. International Journal of Project Management, 25(2007), 213–218. CrossRef Medda, F. (2007). A game theory approach for the allocation of risks in transport public private partnerships. International Journal of Project Management, 25(2007), 213–218. CrossRef
Zurück zum Zitat Melese, Y., Lumbreras, S., Ramos, A., Stikkelman, R., & Herder, P. (2017). Cooperation under uncertainty: Assessing the value of risk sharing and determining the optimal risk-sharing rule for agents with pre-existing business and diverging risk attitudes. International Journal of Project Management, 35(3), 530–540. CrossRef Melese, Y., Lumbreras, S., Ramos, A., Stikkelman, R., & Herder, P. (2017). Cooperation under uncertainty: Assessing the value of risk sharing and determining the optimal risk-sharing rule for agents with pre-existing business and diverging risk attitudes. International Journal of Project Management, 35(3), 530–540. CrossRef
Zurück zum Zitat Mosey, D. (2009). Chapter four: Early contractor involvement in design , pricing and risk management. In Early Contractor Involvement in Building Procurement: Contracts, Partnering and Project Management, pp 57–94. Mosey, D. (2009). Chapter four: Early contractor involvement in design , pricing and risk management. In Early Contractor Involvement in Building Procurement: Contracts, Partnering and Project Management, pp 57–94.
Zurück zum Zitat Nwajei, U. O. K., Bølviken, T., & Hellström, M. M. (2022). Overcoming the principal-agent problem: The need for alignment of tools and methods in collaborative project delivery. International Journal of Project Management, 40(7), 750–762. CrossRef Nwajei, U. O. K., Bølviken, T., & Hellström, M. M. (2022). Overcoming the principal-agent problem: The need for alignment of tools and methods in collaborative project delivery. International Journal of Project Management, 40(7), 750–762. CrossRef
Zurück zum Zitat O’Connor, P. J. (2009). Integrated project delivery: collaboration through new contract forms. Minneapolis. O’Connor, P. J. (2009). Integrated project delivery: collaboration through new contract forms. Minneapolis.
Zurück zum Zitat Pishdad-Bozorgi, P. (2017). Case studies on the role of integrated project delivery (IPD) approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), 1–23. CrossRef Pishdad-Bozorgi, P. (2017). Case studies on the role of integrated project delivery (IPD) approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), 1–23. CrossRef
Zurück zum Zitat Pishdad-Bozorgi, P., & Srivastava, D. (2018). Assessment of integrated project delivery (IPD) risk and reward sharing strategies from the standpoint of collaboration: A game theory approach. In Construction Research Congress 2018. held 2018, pp 196–206. Pishdad-Bozorgi, P., & Srivastava, D. (2018). Assessment of integrated project delivery (IPD) risk and reward sharing strategies from the standpoint of collaboration: A game theory approach. In Construction Research Congress 2018. held 2018, pp 196–206.
Zurück zum Zitat Ross, J. (2013). Gainshare/Painshare regime—Guidance paper with sample model/drafting. Www. Pci-Aus. Com/Downloads/PCI_Gainshare-GuideModel_A_07Feb2011. Pdf (Accessed January 11, 2013). Ross, J. (2013). Gainshare/Painshare regime—Guidance paper with sample model/drafting. Www. Pci-Aus. Com/Downloads/PCI_Gainshare-GuideModel_A_07Feb2011. Pdf (Accessed January 11, 2013).
Zurück zum Zitat Ross, J. (2003). Introduction to project alliancing. Project Control International Pty Limited. Ross, J. (2003). Introduction to project alliancing. Project Control International Pty Limited.
Zurück zum Zitat Ross, J. (1999). Project alliancing in Australia. In Industry Summit on Relationship Contracting in Construction. held 1999 at Sydney, Australia, pp 1–24. Ross, J. (1999). Project alliancing in Australia. In Industry Summit on Relationship Contracting in Construction. held 1999 at Sydney, Australia, pp 1–24.
Zurück zum Zitat Rowlinson, S. (2017). Building information modelling, integrated project delivery and all that. Construction Innovation, 17(1), 45–49. CrossRef Rowlinson, S. (2017). Building information modelling, integrated project delivery and all that. Construction Innovation, 17(1), 45–49. CrossRef
Zurück zum Zitat Su, G., Hastak, M., Deng, X., & Khallaf, R. (2021). Risk sharing strategies for IPD projects: Interactional analysis of participants’ decision-making. Journal of Management in Engineering, 37(1), 4020101. CrossRef Su, G., Hastak, M., Deng, X., & Khallaf, R. (2021). Risk sharing strategies for IPD projects: Interactional analysis of participants’ decision-making. Journal of Management in Engineering, 37(1), 4020101. CrossRef
Zurück zum Zitat Suijs, J., & Borm, P. (1999a). Stochastic cooperative games: Superadditivity, convexity, and certainty equivalents. Games and Economic Behavior, 27(2), 331–345. MathSciNetMATHCrossRef Suijs, J., & Borm, P. (1999a). Stochastic cooperative games: Superadditivity, convexity, and certainty equivalents. Games and Economic Behavior, 27(2), 331–345. MathSciNetMATHCrossRef
Zurück zum Zitat Suijs, J., Borm, P., De Waegenaere, A., & Tijs, S. (1999b). Cooperative games with stochastic payoffs. European Journal of Operational Research, 113(1), 193–205. MATHCrossRef Suijs, J., Borm, P., De Waegenaere, A., & Tijs, S. (1999b). Cooperative games with stochastic payoffs. European Journal of Operational Research, 113(1), 193–205. MATHCrossRef
Zurück zum Zitat Suijs, J., De Waegenaere, A., & Borm, P. (1998). Stochastic cooperative games in insurance. Insurance: Mathematics and Economics, 22(3), 209–228. Suijs, J., De Waegenaere, A., & Borm, P. (1998). Stochastic cooperative games in insurance. Insurance: Mathematics and Economics, 22(3), 209–228.
Zurück zum Zitat Thomsen, C., Darrington, J., Dunne, D., & Lichtig, W. (2009). Managing integrated project delivery. In Construction Management Association of America (CMAA), McLean, VA. Thomsen, C., Darrington, J., Dunne, D., & Lichtig, W. (2009). Managing integrated project delivery. In Construction Management Association of America (CMAA), McLean, VA.
Zurück zum Zitat Tversky, A., & Kahneman, D. (1992). Advances in prospect theory cumulative representation of uncertainty. Journal of Risk and Insurance, 5(4), 297–323. MATH Tversky, A., & Kahneman, D. (1992). Advances in prospect theory cumulative representation of uncertainty. Journal of Risk and Insurance, 5(4), 297–323. MATH
Zurück zum Zitat Victorian Department of Treasury and Finance. (2006). Project Alliancing Practitioners Guide. Victorian Department of Treasury and Finance. (2006). Project Alliancing Practitioners Guide.
Zurück zum Zitat Walker, D., & Rowlinson, S. (2019). Routledge handbook of integrated project delivery. Routledge. CrossRef Walker, D., & Rowlinson, S. (2019). Routledge handbook of integrated project delivery. Routledge. CrossRef
Zurück zum Zitat Walker, D. H. T., Hampson, K., & Peters, R. (2002). Project alliancing versus project partnering: A case study of the Australian national museum project. Supply Chain Management: An International Journal, 7(2), 83–91. CrossRef Walker, D. H. T., Hampson, K., & Peters, R. (2002). Project alliancing versus project partnering: A case study of the Australian national museum project. Supply Chain Management: An International Journal, 7(2), 83–91. CrossRef
Zurück zum Zitat Whang, S.-W., Park, K. S., & Kim, S. (2019). Critical success factors for implementing integrated construction project delivery. Engineering, Construction and Architectural Management, 26(10), 2432–3244. CrossRef Whang, S.-W., Park, K. S., & Kim, S. (2019). Critical success factors for implementing integrated construction project delivery. Engineering, Construction and Architectural Management, 26(10), 2432–3244. CrossRef
Zurück zum Zitat Zheng, L., Lu, W., Chen, K., Chau, K. W., & Niu, Y. (2017). Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation. International Journal of Project Management, 35(3), 393–405. CrossRef Zheng, L., Lu, W., Chen, K., Chau, K. W., & Niu, Y. (2017). Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation. International Journal of Project Management, 35(3), 393–405. CrossRef
Zurück zum Zitat Zhu, L., & Cheung, S. O. (2021). Equity gap in construction contracting: Identification and ramifications. Engineering, Construction and Architectural Management. Zhu, L., & Cheung, S. O. (2021). Equity gap in construction contracting: Identification and ramifications. Engineering, Construction and Architectural Management.
Metadaten
Titel
Multi-agent Incentivizing Mechanism for Integrated Project Delivery
verfasst von
Qiuwen Ma
Copyright-Jahr
2023
DOI
https://doi.org/10.1007/978-3-031-28959-0_6