Skip to main content

2021 | OriginalPaper | Buchkapitel

Multi-objective Workforce Allocation in Construction Projects

verfasst von : Andrew Iskandar, Richard Allmendinger

Erschienen in: Applications of Evolutionary Computation

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Managing construction projects is a complex, resource-intense and risky task that involves the organization and management of people skilled in the design and completion of construction projects. Embarking on a construction project means to plan the allocation of resources and labour, while ensuring that the output (e.g. a new building) meets a certain quality, and is delivered in time and within budget without breaching contractual obligations. We formulate a simplified version of this task as a constrained multi-objective optimization problem, and then use a non-dominated sorting genetic algorithm to tackle the problem. In addition to providing a formal definition of the problem, further contributions of this work include the validation of the methodology using real data of construction projects varying in scale and resource-utilisation; the use of real data is scarce in the construction project management area. We also perform a scenario-based analysis to understand how the approach reacts to changing environmental parameters (such as availability of resources). Finally, we discuss practical implications. Our empirical analysis highlights that the proposed approach improves significantly in terms of project budget, quality, and duration targets, when compared with the industry standard.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Afshar, A., Kaveh, A., Shoghli, O.R.: Multi-objective optimization of time-cost-quality using multi-colony ant algorithm. Asian J. Civ. Eng. 8, 113–124 (2007)MATH Afshar, A., Kaveh, A., Shoghli, O.R.: Multi-objective optimization of time-cost-quality using multi-colony ant algorithm. Asian J. Civ. Eng. 8, 113–124 (2007)MATH
2.
Zurück zum Zitat Alothaimeen, I., Arditi, D.: Overview of multi-objective optimization approaches in construction project management. In: Multi-criteria Optimization - Pareto-optimal and Related Principles. IntechOpen (2019) Alothaimeen, I., Arditi, D.: Overview of multi-objective optimization approaches in construction project management. In: Multi-criteria Optimization - Pareto-optimal and Related Principles. IntechOpen (2019)
3.
Zurück zum Zitat Armand, P., Malivert, C.: Determination of the efficient set in multiobjective linear programming. J. Optim. Theory Appl. 70(3), 467–489 (1991)MathSciNetCrossRef Armand, P., Malivert, C.: Determination of the efficient set in multiobjective linear programming. J. Optim. Theory Appl. 70(3), 467–489 (1991)MathSciNetCrossRef
4.
Zurück zum Zitat Auger, A., Bader, J., Brockhoff, D., Zitzler, E.: Hypervolume-based multi-objective optimization: theoretical foundations and practical implications. Theoret. Comput. Sci. 425, 75–103 (2012)MathSciNetCrossRef Auger, A., Bader, J., Brockhoff, D., Zitzler, E.: Hypervolume-based multi-objective optimization: theoretical foundations and practical implications. Theoret. Comput. Sci. 425, 75–103 (2012)MathSciNetCrossRef
6.
Zurück zum Zitat Chaharsooghi, S., Meimand Kermani, A.H.: An effective ant colony optimization algorithm for multi-objective resource allocation problem. Appl. Math. Comput. 200(1), 642–656 (2008)MathSciNetMATH Chaharsooghi, S., Meimand Kermani, A.H.: An effective ant colony optimization algorithm for multi-objective resource allocation problem. Appl. Math. Comput. 200(1), 642–656 (2008)MathSciNetMATH
7.
Zurück zum Zitat Davis, L.: Job shop scheduling with genetic algorithms. In: Proceedings of an International Conference on Genetic Algorithms and their Applications, vol. 140, pp. 136–140 (1985) Davis, L.: Job shop scheduling with genetic algorithms. In: Proceedings of an International Conference on Genetic Algorithms and their Applications, vol. 140, pp. 136–140 (1985)
8.
Zurück zum Zitat Deb, K.: Multi-objective Optimization Using Evolutionary Algorithms, vol. 16. Wiley, Hoboken (2001)MATH Deb, K.: Multi-objective Optimization Using Evolutionary Algorithms, vol. 16. Wiley, Hoboken (2001)MATH
9.
Zurück zum Zitat Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput. 6(2), 182–197 (2002)CrossRef Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput. 6(2), 182–197 (2002)CrossRef
10.
Zurück zum Zitat Deniz, G.O., Zhu, Y., Ceron, V.: Time, cost, and environmental impact analysis on construction operation optimization using genetic algorithms. J. Manag. Eng. 28(3), 265–272 (2012)CrossRef Deniz, G.O., Zhu, Y., Ceron, V.: Time, cost, and environmental impact analysis on construction operation optimization using genetic algorithms. J. Manag. Eng. 28(3), 265–272 (2012)CrossRef
11.
Zurück zum Zitat El-Rayes, K., Kandil, A.: Time-cost-quality trade-off analysis for highway construction. J. Constr. Eng. Manag. 131(4), 447–486 (2005) El-Rayes, K., Kandil, A.: Time-cost-quality trade-off analysis for highway construction. J. Constr. Eng. Manag. 131(4), 447–486 (2005)
12.
Zurück zum Zitat Elbeltagi, E., Ammar, M., Sanad, H., Kassab, M.: Overall multi-objective optimization of construction projects scheduling using particle swarm. Eng. Constr. Archit. Manag. 23(3), 265–282 (2016)CrossRef Elbeltagi, E., Ammar, M., Sanad, H., Kassab, M.: Overall multi-objective optimization of construction projects scheduling using particle swarm. Eng. Constr. Archit. Manag. 23(3), 265–282 (2016)CrossRef
13.
Zurück zum Zitat Ghoddousi, P., Eshtehardian, E., Jooybanpour, S.: Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Autom. Constr. 30, 216–227 (2013)CrossRef Ghoddousi, P., Eshtehardian, E., Jooybanpour, S.: Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Autom. Constr. 30, 216–227 (2013)CrossRef
14.
Zurück zum Zitat Gomar, J.E., Haas, C.T., Morton, D.P.: Assignment and allocation optimization of partially multi-skilled workforce. J. Constr. Eng. Manag. 128(2), 103–109 (2002)CrossRef Gomar, J.E., Haas, C.T., Morton, D.P.: Assignment and allocation optimization of partially multi-skilled workforce. J. Constr. Eng. Manag. 128(2), 103–109 (2002)CrossRef
15.
Zurück zum Zitat Kwan, D.W., Lo, E.S., Schober, R.: Multi-objective resource allocation for secure communication in cognitive radio networks with wireless information and power transfer. IEEE Trans. Veh. Technol. 65(5), 3166–3184 (2015) Kwan, D.W., Lo, E.S., Schober, R.: Multi-objective resource allocation for secure communication in cognitive radio networks with wireless information and power transfer. IEEE Trans. Veh. Technol. 65(5), 3166–3184 (2015)
16.
Zurück zum Zitat Leu, S.S., Yang, C.H.: GA-based multi-criteria optimal model for construction scheduling. J. Constr. Eng. Manag. 125(6), 420–427 (1999)CrossRef Leu, S.S., Yang, C.H.: GA-based multi-criteria optimal model for construction scheduling. J. Constr. Eng. Manag. 125(6), 420–427 (1999)CrossRef
17.
Zurück zum Zitat Li, Q., Tao, S., Chong, H.Y., Dong, Z.S.: Robust optimization for integrated construction scheduling and multiscale resource allocation. Complexity 2018, 1–17 (2018) Li, Q., Tao, S., Chong, H.Y., Dong, Z.S.: Robust optimization for integrated construction scheduling and multiscale resource allocation. Complexity 2018, 1–17 (2018)
18.
Zurück zum Zitat Ma, W., Che, Y., Ke, H.: Preemptive multi-mode resource-constrained discrete time-cost-resource optimization via non-dominated sorting genetic algorithm. In: Qi, E. (ed.) Proceedings of the 6th International Asia Conference on Industrial Engineering and Management Innovation, pp. 719–728. Atlantis Press, Paris (2016). https://doi.org/10.2991/978-94-6239-145-1_68CrossRef Ma, W., Che, Y., Ke, H.: Preemptive multi-mode resource-constrained discrete time-cost-resource optimization via non-dominated sorting genetic algorithm. In: Qi, E. (ed.) Proceedings of the 6th International Asia Conference on Industrial Engineering and Management Innovation, pp. 719–728. Atlantis Press, Paris (2016). https://​doi.​org/​10.​2991/​978-94-6239-145-1_​68CrossRef
19.
Zurück zum Zitat Marzouk, M., Madany, M., Abou-Zied, A., El-said, M.: Handling construction pollution using multi-objective optimization. Constr. Manag. Econ. 26(10), 1113–1125 (2008)CrossRef Marzouk, M., Madany, M., Abou-Zied, A., El-said, M.: Handling construction pollution using multi-objective optimization. Constr. Manag. Econ. 26(10), 1113–1125 (2008)CrossRef
20.
Zurück zum Zitat Nauss, R.M.: Solving the generalized assignment problem: an optimizing and heuristic approach. INFORMS J. Comput. 15(3), 249–266 (2003)MathSciNetCrossRef Nauss, R.M.: Solving the generalized assignment problem: an optimizing and heuristic approach. INFORMS J. Comput. 15(3), 249–266 (2003)MathSciNetCrossRef
21.
Zurück zum Zitat Oke, A.E., Aghimien, D.O.: Drivers of value management in the Nigerian construction industry. J. Eng. Des. Technol. 16, 270–284 (2020) Oke, A.E., Aghimien, D.O.: Drivers of value management in the Nigerian construction industry. J. Eng. Des. Technol. 16, 270–284 (2020)
22.
Zurück zum Zitat Osman, M., Abo-Sinna, M., Mousa, A.: An effective genetic algorithm approach to multi-objective resource allocation problems. Appl. Math. Comput. 136(2), 755–768 (2005)MATH Osman, M., Abo-Sinna, M., Mousa, A.: An effective genetic algorithm approach to multi-objective resource allocation problems. Appl. Math. Comput. 136(2), 755–768 (2005)MATH
23.
Zurück zum Zitat Panwar, A., Jha, K.: A many-objective optimization model for construction scheduling. Constr. Manag. Econ. 37(12), 727–739 (2019)CrossRef Panwar, A., Jha, K.: A many-objective optimization model for construction scheduling. Constr. Manag. Econ. 37(12), 727–739 (2019)CrossRef
24.
Zurück zum Zitat Senouci, A.B., Eldin, N.N.: Use of genetic algorithms in resource scheduling of construction projects. J. Constr. Eng. Manag. 130(6), 869–877 (2004)CrossRef Senouci, A.B., Eldin, N.N.: Use of genetic algorithms in resource scheduling of construction projects. J. Constr. Eng. Manag. 130(6), 869–877 (2004)CrossRef
26.
Zurück zum Zitat Tareghian, H.R., Taheri, S.H.: On the discrete time, cost and quality trade-off problem. Appl. Math. Comput. 181(2), 1305–1312 (2006)MATH Tareghian, H.R., Taheri, S.H.: On the discrete time, cost and quality trade-off problem. Appl. Math. Comput. 181(2), 1305–1312 (2006)MATH
27.
Zurück zum Zitat Tofan, S., Allmendinger, R., Zanda, M., Stephens, O.: Heuristic allocation of computational resources. In: Proceedings of the Genetic and Evolutionary Computation Conference, pp. 1256–1263 (2017) Tofan, S., Allmendinger, R., Zanda, M., Stephens, O.: Heuristic allocation of computational resources. In: Proceedings of the Genetic and Evolutionary Computation Conference, pp. 1256–1263 (2017)
28.
Zurück zum Zitat Walker, A.: Project Management in Construction. Wiley, Hoboken (2015) Walker, A.: Project Management in Construction. Wiley, Hoboken (2015)
29.
Zurück zum Zitat Zhang, H., Xing, F.: Fuzzy multi-objective particle swarm optimization for time-cost-quality trade-off in construction. Autom. Constr. 19(8), 1067–1075 (2010)CrossRef Zhang, H., Xing, F.: Fuzzy multi-objective particle swarm optimization for time-cost-quality trade-off in construction. Autom. Constr. 19(8), 1067–1075 (2010)CrossRef
30.
Zurück zum Zitat Zheng, H.: The bi-level optimization research for time-cost-quality-environment trade-off scheduling problem and its application to a construction project. In: Xu, J., Hajiyev, A., Nickel, S., Gen, M. (eds.) Proceedings of the Tenth International Conference on Management Science and Engineering Management. AISC, vol. 502, pp. 745–753. Springer, Singapore (2017). https://doi.org/10.1007/978-981-10-1837-4_62CrossRef Zheng, H.: The bi-level optimization research for time-cost-quality-environment trade-off scheduling problem and its application to a construction project. In: Xu, J., Hajiyev, A., Nickel, S., Gen, M. (eds.) Proceedings of the Tenth International Conference on Management Science and Engineering Management. AISC, vol. 502, pp. 745–753. Springer, Singapore (2017). https://​doi.​org/​10.​1007/​978-981-10-1837-4_​62CrossRef
Metadaten
Titel
Multi-objective Workforce Allocation in Construction Projects
verfasst von
Andrew Iskandar
Richard Allmendinger
Copyright-Jahr
2021
DOI
https://doi.org/10.1007/978-3-030-72699-7_4