Skip to main content

2017 | OriginalPaper | Buchkapitel

On the Quality of Basic Schedules Influencing over the Performance of Predictive and Reactive Schedules

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Searching for an algorithm which achieves good quality basic schedules, in predefined time, two immune algorithms are compared, Multi Objective Immune Algorithm (MOIA), Clonal Selection Algorithm (CSA). In the MOIA two stages are distinguished, the first stage mimics the exogenous activation and the second corresponds to the endogenous activation of an immune system. The architecture of CSIA mimics the clonal proliferation and maturation processes. The two algorithms are applied for a multi criteria job shop scheduling problem. Basic schedules are modified using the rule of Minimal Impact of Disturbed Operation on the Schedule (MIDOS) in order to generate predictive schedules. The influence of rescheduling policies over the performance of a job shop system is investigated using the rule of Minimal Impact of Rescheduled Operation on the Schedule (MIROS). In the paper, the influence of the quality basic schedules over the obtainment of stable and robust schedules with the application of the MIDOS and MIROS is investigated.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Paprocka, I., Kempa, W. M., Kalinowski, K., Grabowik, C.: Estimation of overall equipment effectiveness using simulation programme. Mater. Sci. Eng. 95, Article Number: 012155, 1–6 (2015) Paprocka, I., Kempa, W. M., Kalinowski, K., Grabowik, C.: Estimation of overall equipment effectiveness using simulation programme. Mater. Sci. Eng. 95, Article Number: 012155, 1–6 (2015)
2.
Zurück zum Zitat Ershun, P., Wenzhu, L., Lifeng, X.: A joint model of production scheduling and predictive maintenance for minimizing job tardiness. Int. J. Adv. Manuf. Technol. 60, 1049–1061 (2012)CrossRef Ershun, P., Wenzhu, L., Lifeng, X.: A joint model of production scheduling and predictive maintenance for minimizing job tardiness. Int. J. Adv. Manuf. Technol. 60, 1049–1061 (2012)CrossRef
3.
Zurück zum Zitat Vieira, E.G., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6(1), 35–58 (2003)MathSciNetCrossRefMATH Vieira, E.G., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6(1), 35–58 (2003)MathSciNetCrossRefMATH
4.
Zurück zum Zitat Wu, S.D., Storer, R.H., Chang, P.-C.: One-machine rescheduling heuristics with efficiency and stability as criteria. Comput. Oper. Res. 20, 1–14 (1993)CrossRefMATH Wu, S.D., Storer, R.H., Chang, P.-C.: One-machine rescheduling heuristics with efficiency and stability as criteria. Comput. Oper. Res. 20, 1–14 (1993)CrossRefMATH
5.
Zurück zum Zitat Fahmy, S.A., Balakrishnan, S., ElMekkawy, T.Y.: A generic deadlock-free reactive scheduling approach. Int. J. Prod. Res. 47(20), 5657–5676 (2009)CrossRefMATH Fahmy, S.A., Balakrishnan, S., ElMekkawy, T.Y.: A generic deadlock-free reactive scheduling approach. Int. J. Prod. Res. 47(20), 5657–5676 (2009)CrossRefMATH
6.
Zurück zum Zitat Paprocka, I., Kempa, W.M., Grabowik, C., Kalinowski, K.: Sensitivity analysis of predictive scheduling algorithms. Adv. Mater. Res. 1036, 921–926 (2014)CrossRef Paprocka, I., Kempa, W.M., Grabowik, C., Kalinowski, K.: Sensitivity analysis of predictive scheduling algorithms. Adv. Mater. Res. 1036, 921–926 (2014)CrossRef
7.
Zurück zum Zitat Leon, V.J., Wu, S.D., Storer, R.H.: Robustness measures and robust scheduling for job shops. IIE Trans. 26, 32–43 (1994)CrossRef Leon, V.J., Wu, S.D., Storer, R.H.: Robustness measures and robust scheduling for job shops. IIE Trans. 26, 32–43 (1994)CrossRef
8.
Zurück zum Zitat Policella, N., Oddi, A., Smith, S.F., Cesta, S.: Generating robust partial order schedules. In: Wallace, M. (ed.). Lecture Notes in Computer Science, vol. 3258, pp. 496–511 (2004) Policella, N., Oddi, A., Smith, S.F., Cesta, S.: Generating robust partial order schedules. In: Wallace, M. (ed.). Lecture Notes in Computer Science, vol. 3258, pp. 496–511 (2004)
9.
Zurück zum Zitat Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: A production scheduling model with maintenance. Adv. Mater. Res. 1036, 885–890 (2014)CrossRef Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: A production scheduling model with maintenance. Adv. Mater. Res. 1036, 885–890 (2014)CrossRef
10.
Zurück zum Zitat Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: On pareto optimal solution for production and maintenance jobs scheduling problem in a job shop and flow shop with an immune algorithm. Adv. Mater. Res. 1036, 875–880 (2014)CrossRef Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: On pareto optimal solution for production and maintenance jobs scheduling problem in a job shop and flow shop with an immune algorithm. Adv. Mater. Res. 1036, 875–880 (2014)CrossRef
Metadaten
Titel
On the Quality of Basic Schedules Influencing over the Performance of Predictive and Reactive Schedules
verfasst von
Iwona Paprocka
Copyright-Jahr
2017
DOI
https://doi.org/10.1007/978-3-319-46592-0_21