Skip to main content

2013 | OriginalPaper | Buchkapitel

Open-Pit Mining with Uncertainty: A Conditional Value-at-Risk Approach

verfasst von : Henry Amankwah, Torbjörn Larsson, Björn Textorius

Erschienen in: Optimization Theory, Decision Making, and Operations Research Applications

Verlag: Springer New York

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The selection of a mine design is based on estimating net present values of all possible, technically feasible mine plans so as to select the one with the maximum value. It is a hard task to know with certainty the quantity and quality of ore in the ground. This geological uncertainty and also the future market behavior of metal prices and foreign exchange rates, which are always uncertain, make mining a high risk business. Value-at-Risk (VaR) is a measure that is used in financial decisions to minimize the loss caused by inadequate monitoring of risk. This measure does, however, have certain drawbacks such as lack of consistency, nonconvexity, and nondifferentiability. Rockafellar and Uryasev [J. Risk 2, 21–41 (2000)] introduce the Conditional Value-at-Risk (CVaR) measure as an alternative to the VaR measure. The CVaR measure gives rise to a convex optimization problem. An optimization model that maximizes expected return while minimizing risk is important for the mining sector as this will help make better decisions on the blocks of ore to mine at a particular point in time. We present a CVaR approach to the uncertainty involved in open-pit mining. We formulate investment and design models for the open-pit mine and also give a nested pit scheduling model based on CVaR. Several numerical results based on our models are presented by using scenarios from simulated geological and market uncertainties.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Abdel Sabour, S.A., Dimitrakopoulos, R.G., Kumral, M.: Mine design selection under uncertainty. Mining Tech. 117, 53–64 (2008)CrossRef Abdel Sabour, S.A., Dimitrakopoulos, R.G., Kumral, M.: Mine design selection under uncertainty. Mining Tech. 117, 53–64 (2008)CrossRef
2.
Zurück zum Zitat Andersson, F., Mausser, H., Rosen, D., Uryasev, S.: Credit risk optimization with conditional value-at-risk criterion. Math. Program. Ser. B, 89, 273–291 (2001)MathSciNetMATHCrossRef Andersson, F., Mausser, H., Rosen, D., Uryasev, S.: Credit risk optimization with conditional value-at-risk criterion. Math. Program. Ser. B, 89, 273–291 (2001)MathSciNetMATHCrossRef
3.
Zurück zum Zitat Carneiro, M.C., Ribas, G.P., Hamacher, S.: Risk management in the oil supply chain: a CVaR approach. Ind. Eng. Chem. Res. 49, 3286–3294 (2010)CrossRef Carneiro, M.C., Ribas, G.P., Hamacher, S.: Risk management in the oil supply chain: a CVaR approach. Ind. Eng. Chem. Res. 49, 3286–3294 (2010)CrossRef
4.
Zurück zum Zitat Dimitrakopoulos, R., Farrelly, C., Godoy, M.C.: Moving forward from traditional optimisation: grade uncertainty and risk effects in open pit mine design. Trans. Inst. Min. Metall. Section A, Min. Ind. 111, A82–A89 (2002) Dimitrakopoulos, R., Farrelly, C., Godoy, M.C.: Moving forward from traditional optimisation: grade uncertainty and risk effects in open pit mine design. Trans. Inst. Min. Metall. Section A, Min. Ind. 111, A82–A89 (2002)
5.
Zurück zum Zitat Ferland, J.A., Amaya, J., Djuimo, M.S.: Application of a particle swarm algorithm to the capacitated open pit mining problem. In: Sen Gupta, G. (ed.) Autonomous Robots and Agents. Studies in Computational Intelligence, vol. 76, pp. 127–133. Springer, Berlin (2007)CrossRef Ferland, J.A., Amaya, J., Djuimo, M.S.: Application of a particle swarm algorithm to the capacitated open pit mining problem. In: Sen Gupta, G. (ed.) Autonomous Robots and Agents. Studies in Computational Intelligence, vol. 76, pp. 127–133. Springer, Berlin (2007)CrossRef
6.
Zurück zum Zitat Hochbaum, D., Chen, A.: Performance analysis and best implementations of old and new algorithms for the open-pit mining problem. Oper. Res. 48, 894–914 (2000)CrossRef Hochbaum, D., Chen, A.: Performance analysis and best implementations of old and new algorithms for the open-pit mining problem. Oper. Res. 48, 894–914 (2000)CrossRef
7.
Zurück zum Zitat Krokhmal, P., Palmquist, J., Uryasev, S.: Portfolio optimization with conditional value-at-risk objective and constraints. J. Risk 4, 43–68 (2002) Krokhmal, P., Palmquist, J., Uryasev, S.: Portfolio optimization with conditional value-at-risk objective and constraints. J. Risk 4, 43–68 (2002)
8.
Zurück zum Zitat Lai, F.J., Bamford, W.E., Yuen, S.T.S., Li, T.: Implementing value at risk in slope risk evaluation. In: Proceedings of the International Symposium on Rock Slope Stability in Open Pit Mining and Civil Engineering, Santiago, Chile, pp. 1–10 (2009) Lai, F.J., Bamford, W.E., Yuen, S.T.S., Li, T.: Implementing value at risk in slope risk evaluation. In: Proceedings of the International Symposium on Rock Slope Stability in Open Pit Mining and Civil Engineering, Santiago, Chile, pp. 1–10 (2009)
9.
Zurück zum Zitat Lasdon, L.S.: Optimization Theory for Large Systems. Dover, New York (2002)MATH Lasdon, L.S.: Optimization Theory for Large Systems. Dover, New York (2002)MATH
10.
Zurück zum Zitat Lerchs, H., Grossmann, I.F.: Optimum design of open-pit mines. Trans. Can. Inst. Min. Metall. LXVIII, 17–24 (1965) Lerchs, H., Grossmann, I.F.: Optimum design of open-pit mines. Trans. Can. Inst. Min. Metall. LXVIII, 17–24 (1965)
11.
Zurück zum Zitat Lim, C., Sherali, H. D., Uryasev, S.: Portfolio optimization by minimizing conditional value-at-risk via nondifferentiable optimization. Comput. Optim. Appl. 46, 391–415 (2010)MathSciNetMATHCrossRef Lim, C., Sherali, H. D., Uryasev, S.: Portfolio optimization by minimizing conditional value-at-risk via nondifferentiable optimization. Comput. Optim. Appl. 46, 391–415 (2010)MathSciNetMATHCrossRef
12.
Zurück zum Zitat Mansini, R., Ogryczak, W., Speranza, M. G.: Conditional value at risk and related linear programming models for portfolio optimization. Ann. Oper. Res. 152, 227–256 (2007)MathSciNetMATHCrossRef Mansini, R., Ogryczak, W., Speranza, M. G.: Conditional value at risk and related linear programming models for portfolio optimization. Ann. Oper. Res. 152, 227–256 (2007)MathSciNetMATHCrossRef
13.
Zurück zum Zitat Martinez, L.A.: Why accounting for uncertainty and risk can improve final decision-making in strategic open pit mine evaluation. In: Project Evaluation Conference, Melbourne, pp. 1–12 (2009) Martinez, L.A.: Why accounting for uncertainty and risk can improve final decision-making in strategic open pit mine evaluation. In: Project Evaluation Conference, Melbourne, pp. 1–12 (2009)
14.
Zurück zum Zitat Rockafellar, R.T., Uryasev, S.: Optimization of conditional value-at-risk. J. Risk 2, 21–41 (2000) Rockafellar, R.T., Uryasev, S.: Optimization of conditional value-at-risk. J. Risk 2, 21–41 (2000)
15.
Zurück zum Zitat Rockafellar, R.T., Uryasev, S.: Conditional value-at-risk for general loss distributions. J. Bank. Finance 26, 1443–1471 (2002)CrossRef Rockafellar, R.T., Uryasev, S.: Conditional value-at-risk for general loss distributions. J. Bank. Finance 26, 1443–1471 (2002)CrossRef
16.
Zurück zum Zitat West, J.: Decreasing metal ore grades. J. Ind. Ecol. 15, 165–168 (2011)CrossRef West, J.: Decreasing metal ore grades. J. Ind. Ecol. 15, 165–168 (2011)CrossRef
Metadaten
Titel
Open-Pit Mining with Uncertainty: A Conditional Value-at-Risk Approach
verfasst von
Henry Amankwah
Torbjörn Larsson
Björn Textorius
Copyright-Jahr
2013
Verlag
Springer New York
DOI
https://doi.org/10.1007/978-1-4614-5134-1_8